On April 11, 2019 a
Party Statement
was filed
involving a dispute between
Gaveet Waterproofing And Construction Llc,
Knibb Design Corp,
Knibb Sean,
The Picard Family Company Inc. Dba Watson Plumbing,
Steinberg Michael H,
Steinberg Sheeri,
and
Alzona Gary,
Condo Jr. Nelson S.,
Condo Nelson S.,
Gaveet Construction And Water Proofing Llc A Limited Liabiltiy Company,
Hewitt Construction,
Hewitt Construction Inc. A Corporation,
Hewitt Constuction Inc.,
Knibb Design Corp,
Knibb Sean,
M&B Customs A Business Organization Form Unknown,
M&M Sheet Metal & Rain Gutter,
Pedersen Michael,
Satoh Michael,
The Picard Family Company Inc. Dba Watson Plumbing,
Watson Plumbing A Division Of The Picard Family Company Inc,
Watson Plumbing A Division Of The Picard Family Company Inc.,
for civil
in the District Court of Los Angeles County.
Preview
sw
CM-110
ATTORNEY OR PARTY WITHOUT ATTORNEY (Name, State Bar number, and address): FOR COURT USE ONLY
Edward E. Johnson (Cal. Bar No. 241065)
Theodora Oringher PC
1840 Century Park East, Suite 500, Los Angeles, CA 90067
TELEPHONE NO.: 3~ O-~JJ7-ZOOS Fax No. ~oPtiona~l. 310-551-0283
E-MAIL ADDRESS (Optional): Q~Qhn$Qn@tQCQUnSQ~.CQm
nrroRr,ev FOR rNamer. Plaintiffs Sheeri Steinber and Michael H. Steinberg
SUPERIOR COURT OF CALIFORNIA, couNrir of Los Angeles
STREETADDRE55: ~72~J M8111 Stf@@t
MAILING ADDRESS: ~7`L,5 Main St~eQt
CITY AND ZIP CODE: S8flt8 MOf11C8, CA 90401
BRANCH NAME: Santa MOC11Ca
P~,airvTiFFiPETiTioNER: Sheeri Steinberg and Michael H. Steinberg
DEFENDANT/RESPONDENT: S@8f1 Kfllbb, Knibb Design Corp., Hewitt Construction
CASE MANAGEMENT STATEMENT CASE NUMBER:
(Check oneJ: ~✓ UNLIMITED CASE ~ LIMITED CASE 19SMCV00681
(Amount demanded (Amount demanded is $25,000
exceeds $25,000) or less)
A CASE MANAGEMENT CONFERENCE is scheduled as follows:
Date: March 6, 2019 Time: 9:00 a.m. Dept.: N Div.: Room:
Address of court (if different from the address above):
0Notice of Intent to Appear by Telephone, by (name):
INSTRUCTIONS: All applicable boxes must be checked, and the specified information must be provided.
Party or parties (answer one):
a. ~ This statement is submitted by party (name):
b. ~✓ This statement is submitted jointly by parties (names): Plaintiffs Sheeri Steinberg and Michael H. Steinberg
Complaint and cross-complaint (to be answered by plaintiffs and cross-complainants only)
a. The complaint was filed on (date): April 11, 2019
b. 0✓ The cross-complaint, if any, was filed on (date): October 25, 2019
Service (to be answered by plaintiffs and cross-complainants only)
a. ~ All parties named in the complaint and cross-complaint have been served, have appeared, or have been dismissed.
b. 0 The following parties named in the complaint orcross-complaint
(1) 0 have not been served (specify names and explain why not):
(2) ~ have been served but have not appeared and have not been dismissed (specify names):
(3) ~✓ have had a default entered against them (specify names):
Hewitt Construction
c. 0 The following additional parties may be added (specify names, nature of involvement in case, and date by which
they maybe served):
4. Description of case
a. Type of case in ~✓ complaint ~ cross-complaint (Describe, including causes of action):
Fraud; breach of contract; breach of implied warranty of fitness; breach of implied warranty of merchantability;
negligent construction; breach of fiduciary duty; accounting; Cal. legal remedies act; trespass
Page 7 of 6
Form Adopted for Mandatory Use CASE MANAGEMENT STATEMENT Cal. Rules of Court,
Judicial Council of California rules 3.72 3.730
CM-110[Rev. July t, 2011] www.courts.ca.gov
Document Filed Date
February 21, 2020
Case Filing Date
April 11, 2019
For full print and download access, please subscribe at https://www.trellis.law/.