arrow left
arrow right
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
  • 436 Lafayette Developers Llc v. Dorla Alleyne Real Property - Other (Nuisance, etc.) document preview
						
                                

Preview

FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 NYSCEF DOC. NO. 43 RECEIVED NYSCEF: 06/26/2018 FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 NYSCEF DOC. NO. 43 434 Lafayette Street RECEIVED NYSCEF: oecember 06/26/2018 5,201 t ..'.g,'"r,' /' -. &&1 P c '4. I I fi 'Eg 434 Lafayette Street Submitted by: Clyde Wedderburn EKO HOMES 437B Pulaski Street Brooklyn, NY 11221 Mobile: 917-214-4137 ekohomes@aol.com www.ekohomes.net EKO HOMES FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 20· NYSCEF DOC. NO. 43 434 Lafayette Street RECEIVED NYSCEF: December 06/26/2018 5, 20 Clyde Wedderburn ES tlmBfi EKO HOMES 437B Pulaski Street Brooklyn, NY 11221 Mobile 917-214-4137 ekohomes@aol.com www.ekohomes.net Project: 030218 Customer 434 Lafayette Street Doria Alleyen Mobile +1 (347) 513-6757 tiCado@msn.com Restore /rebuild side and back wall of four story plus basement of brownstone home damage sustained as a result of demolition construction activityat adjacent property. 10' 50' Damage was also sustained to 50 feet concrete fence and backyard masonry slab x in area. Interior plastered walls and ceilings must also be restored to original crack-free state. Description Quantity Cos I' o ~ Preparation~ 62;09 Cellar 37,584.61 Shoring And Bridging 37,584.6E 01 General Requirements, Equipment Rental Rates, Heavy Duty Shoring, Add forerecting each frame 50 LF 37,584.64 i Costs are for equipment in good condition but exclude accessories. Includes the costs of damage waiver (about 10% of the rental cost), insurance, tuel, and oil. Add the cost of an equipment operator. pickup, return to yard and repairs. if necessary. "day" is Delivery and pickup within 30 miles of the rental yard are usually offered at an additional cost of one day's rent. A rental assumed to be one 8-hour shift and begins when the equipment leaves the rental yard. A"wcck" A is 40 hours in five consecutive days. A "month" is 176 hours in 30 consecutive days., Adjustable vertical tower type shoring. Rated capacity 5.5 tons per leg. Base frames are 4' wide x 6' high or 2*wide x 5' high. Extension frames are 4' wide x 5'4° high or 2' wide x 4'4" high. Frames are erected in pairs using cross-bracing to form a tower. Combinations of base frames and extension frames are used to reach the height required. Scrow jacks with base plates are installed in the bottom of each leg. similar screw jacks with "U"-bracket heads are instaBedin the top of each leg. Material costs shown are rental rates based on a 1-month minimum. Add the cost 01delivery and pickup. For scheduling purposes, estimate that a crew of 2 can unload, handle and erect 8 to 10 frames (including typical jacks and heads) per hour. Dismantling, handling and moving or loading will require nearly the same time. Exterior Back Wall 24,506.94 Site Preparation 24,506.94 03 Coricrete,Concrete Accessories, Waler Jacks (scaffoldsupport on form),purchase, Rental permonth, each 3 Mo 24,506.94 . s Emolititidn ~ 48,782.12 Cellar 3,310.58 Masonry 3,310.58 Brickwalls and cost per SF removed, 12" Demolition, walks, measured ort oneface,using pneumatic breaker, 12 thickwalls (20 SF perCY and 108 lbs.perSF) 500 SF 3,310.52 Itemired costs for demolition of building components when buildng is being remodeled, repaired or rehabilitated, not completely demolished. Costs include protecting adjacent areas and normal clean-up. costs are to break out the horns listed and pile debris on site only. No hauling. dump fees or salvage value included. Equipment cost includes one air compressor and a pneumatic breaker with jackhammer bits. (Figures in parentheses show the volume before and alter demolition and weight of the materials after demolition.) Use $250.00 as a minimum charge. Exterior Side Wall 28,337.00 Masonry 28,337.00 EKO HOMES FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 NYSCEF DOC. NO. 43 434 Lafayette Street RECEIVED NYSCEF: December 06/26/2018 5, 20 Description Quantity Coe _ _-... . Demolitition . Exterior Side Wall Masonry pneumatic 12" Demolition, Brickwalls and walks,cost per SF removed, measured on one face,using breaker,12 thickwalls (20SF per CY and 108 Ibs.perSF) 3,000 SF 28,337.01 is being remodeled, repaired or rehabilitated, not completely Itemized costs for demolition of building components when bukling demolished. costs include protecting adjacent areas and normal clean-up. Costs are to break out the items listed and pile debris on site only. No hauling, dump fees or salvage value included. Equipment cost includes one air compressor and a pneumatic breaker with jackhammer bits. (Figures in parentheses show the volume before and after demolition and weight of the materials after demolition.) Use S250.00 as a rainimum charge. Exterior Back Wall 11,334.81 Masonry 11,334.8( 12" Demolition, Brick wallsand walks,cost per SF removed, measured on one face,using pneumatic breaker, thickwalls (20 SF perCY and 108 lbs.per SF) 1,200 SF 11,334.84 iiitated, not completely Itemized costs for demolition of building components when building is being remodeled. repaired or rch demolished. Costs include protecting a4acent areas and normal clean-up. Costs are to break out the items listed and pile debris on site only. No hauling, dump fees or salvage value included. Equipment cost includes one air compressor and a pncumatic breaker with jackhammer bits. (Figures in parentheses show the volume before and after demolition and weight of the materials after demolition.) Use $250.00 as a minimum charge. Basement/ Ground Floor 3,310.51 Masonry 3,310.51 12" Demolition, Brickwalls and walks, costper SF removed, measured on one face,using pneumatic breaker, thickwalls (20 SF perCY and 108 Ibs.perSF) 500 SF 3.310.51 Itemized costs for dernolition of building components when building is being remodeled. repaired or rehabilitated, not completely demolished. Costs include protecting adjacent areas and normal cleanup. Costs are to break out the items listed and pile debris on site only. No hauling, dump fees or salvage value included. Equipment cost includes one air compressor and a pneumatic breaker with jackhammer bits. (Figures in parentheses show the volume before and after demolition and weight of the materials after demolition.) Use S250.00 as a minimum charge. First Floor 1,244.51 Masonry 1,244.5E 12" Demolition,Brick walls and walks,cost per SF removed, measured on one face, using pneumatic breaker, 12 thickwalls (20SF per CY and 108 lbs.per SF) 500 SF 1.244.51 costs for demolition restoration of building components when building is being remodeled, repaired or rehabilitated, not completely demolished. Costs include protecting adjacent areas and normal clean-up. Costs are to break out the items listed and pile debris on site only. No hauling. dump fees or salvago value included. Equipment cost includes onc air compressor and a pneumatic breaker with jackhammer bits. (Figures in parentheses show the volume before and after demolition and weight of the materials after demolition.) Use $250.00 as a minimum charge. Second Floor 1,244.5E Masonry 1,244.5E Brickwalls and costper SF removed, measured on one pneumatic 12" Demolition, walks, face,using breaker, thickwalls (20 SF perCY and 108 lbs.per SF) 500 SF 1,244.5E Itemized costs for demolition and restoration of building components when buikEng is being remodeled, repaired or rehabilitated, not completely demolished. Costs include protecting adjacent areas and normal clean-up. Costs are to break out the items listed and pile debris on site only. No hauling, dump fees or salvage value included. Equipment cost includes one air compressor and a breaker with jackhammer bits. (Figures in parentheses show the volume before and after demolition and weight of the materials after demolition.) Use S250.00 as a minimum charge. ~ i traff4ieVulled ~ 195,539.2 Boiler Room 2,828.82 Fencing 2,828.82 EKO HOMES FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 20- NYSCEF DOC. NO. 43 434 Lafayette Street RECEIVED NYSCEF: December 06/26/2018 5, Description Quantity Cos Structural Rebuilding Boiler Room Fencing Foundation and set 5/8"adhesive anchor bolt 5"in concrete 2gPA.S,' Vibration Damage, anchors, Drill 150 SF 2,828.8 5"into an existing reinforced concrete or masonry foundation. Drilled through the blocking and mudsiAof a frame wall and 3" 3" Attached with a 56" diamotor anchor bott and a sled 3 ×3 plate washer, Add the cost of removing and repladng wall finish materials, if required. Exterior Side Wall 124,560.6: MaSonry 124,560.6: 04 Masonry, Colonial 3" x 3-1/2"x 10" 11-1/2" 11-1/2 thick triple Brick WallAssemblies, bricks, wide long, wall, wythe, cavityfilled 3,000 SF 124,560.6: Typical costs for smooth red clay brick walls, laid in running bond wist 3/8" concave joints. These costs include the bricks, mortar tor bricks and cavities, typical ladder type reinforcing, wall ties and normal waste. Foundations are not included. WaAthickness shown is the nominal size based on using the type bricks described. "Wylho" means the quantity of bricks in the thickness of the wall. Costs shown are per square foot (SF) of wall measured on one face. Doduct tor openings over 10 SF in size. The names and dimensions of bricks can be expected to vary, depending on the manufacturer. For more detaRodcoverage of brick wall & Masonry Estimator, htip·J/CraftsmanSiteLicense.com assemblies, see National Corxrete Exterior Back Wall 49,738.2! Masonry 49,738.2f 3" wide 3-1/2" 10" 3-1/2" 04 Masonry, Brick WallAssemblies, Colonialbricks, x 3-1/2 x 10 long, 3-1/2 thickwall,singlewythe, veneer facing 1,200 SF 49,738.2! Typical costs tor srnooth red clay brick walls, laid in running bond with 3/B" 3ftr concave joints. These costs include the bricks. mortar for bricks and cauties, typical ladder type reinforcing, wall ties and normal waste. Foundations are not included. Wall thickness shown is the nominal size based on using the type bricks describcd- "Wythe" means the quantity of bncks in the thickness of the sf' Costs shown are per square toot (SF) of wall measured on ono face. Doduct for openings over 10 SF in size. The names and dimensions of bricks can be expected to vary, depending on the manufacturer. For more detailed coverage of brick wall assemblies. see National Concrete 8 Masonry Estimator, http·J/CraftsmanSiteLicense.com Basement/ Ground Floor 8,814.41 Accessories 871.1( 03 Concrete, Steel 5/8" 20* Reinforcing Bars, ASTM-775 epoxy-coated, x 24 Ea 871.1( 20• lengths, material costs only. Add tho cost of defrvery,shop fabrication, cutting, bending, setting, lap aruf tying bars. Flooring 2,084.5f Floor Floorjoists16" insulation 5/8"OSB 2" Carpentry, Assemblies, OC, R-19 and OSB subflooring,5/8 subfloor, 10" x joists 180 SF 2,084.Sf See also carpentry items in other sections: Carperstry Steel Framing, Cabinels, Ceilings, Closet Door Systems, Countertops, Cupolas. Doors. Entranocs, Flooring, Framing Connectors, Hardboard, Hardware, Lurnber, Molding, Paneling, Shutters, Siding, Skylights, Soffits, Stairs, Thresholds, and Weatherstripping., Costs for wood framed floor joists with subflooring and R-19 insulation. These costs include the floor joists, subtlooring as descrbed, blocking, nails and 6-1/4° e-t/4thick R-1.9 fiberglass insulation between the floor joists. Figures include box or band joists and typical double joists. No beams included. plunked subflooring is based on 1.24 BF per square foot of floor. Costs shown are por square foot of area covered and include normal waste.Deduct for openings over 25 SF. Masonry 5,858.82 04 Masonry, Concrete Block WallAssemblies, Concrete Block Bond Beams, Grout for bond beams, 3,000PSI concrete, by blocksize and linearfootof beam, no block or reinforcingincluded,based on blockcavity at 50% of 8" x 4" block volume, 8 high wide, .100 CF per LF 500 SF 5,858.82 Typical costs for standard natural gray medium weight masonry block walls including blocks, mortar. typical reinforcing and normal waste. Foundations are not included. For more detailed coverage of concrete block masonry, see National Concrete 8 Masonry Estimator, http·J/CraftsmanSiteLicense.com, For door and window openings, no grout or reinforcing included. Backyard 9,597.10 Concrete 5,847.24 03 Concrete,Excavation forConcrete Work, Batterboards, layout forfootings,per corner 150 SF 5,847.24 These costs do not include sharing or disposal. Typical soil conditions. EKO HOMES FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 2o· NYSCEF DOC. NO. 43 434 Lafayette Street RECEIVED NYSCEF: oeCember 06/26/2018 s, Description Quantity Cos ~ Structural iRebuilding .;:..', ",' ' ' ' ..', ' .. '".;' ". ',::..;,'... ' ". ~.-. ~ ' ' ."'. ' ' ',;i>c Backyard Fencing 3,749.8 Fireplaces, Masonry Fireplaces,Firebox lined withrefractory backed firebrick, with common brickand in a common brickwall,Add forcommon brickveneer interior face 300 SF 3,749.81 Includes fireplace throat and smoke chamber. Overall height of the firopiace and throat is 5'. Chimney (Due) is made from brick and a flue liner. Including lintels, damper and 12" 12 thick reinforced concreto foundation. For more on masonry fireplaces, see National Concrete 8 Masonry Estimator, http·J/CraftsmanSiteLicensc.com. > tè' ~ oofing' 5 37 I ' '- i Basement/ Ground Floor 5,837.3( Masonry 5,837.3( Institutional Industrial, and Heavy Commercial Painting Costs,Masonry, Concrete Masonry Units(CMU), Smooth surface,industrialwaterproofing, Roll2nd or additionalcosts,Medium 200 SF/MH, 175 SF/Gal 1,000 SF 5.837.34 Use these figures for Concrete Masonry Units (CMU), where block surfaces are smooth. as in precision block, filled block or ..thor. with joints struck to average depth. The more smooth the surface texture, the less time and material will be required. slump stone For heights above 8 feet, use the High Tene Difficulty Factors. .:- Re$tordtior ~~ 34,966.7 ®tèrtor First Floor 34,966.7 Walls 8 Ceilings 34,966.7 > 09 Finishes, Thin coat plaster,,2 but not 3/8"rock lath Plastering, coats,with rock lath including studs,3/8 800 SF 32,309.0! These costs do not include the furring or lath J Demolition, BuildingDemolition, Cellingdemolition,Plaster ceiling 175 to 200 (typically SF perCY), Including lathand furring 800 SF 2,657.7 '' Knock down with hand tools at heights to 9' and hands debris to a trash bin on site. BuikEng '= structure to remain. No anowance for salvage value. Costs shown arc por square foot of ceiling. Figures in parentheses show the approximate "loose" volume after demolition. ~ 4 I Basement/ Ground Floor 3,342.6( Painting 3,342.6C General Painting Costs,Walls, Plaster, Smooth interior, finish,Roll,per 100 SF of wall area, Flatlatex,water base, Roll2nd coat, Medium 488 SF/MH, 350 SF/Gal 800 SF 3,342.M Measurements are based on the square feet of watt coated. Do not deduct lor openings lass than 100 square fact. Thoso ligures assume paint products are being applied over a smooth finish. For heights above 8 feet use the High Time Difficulty Factors. These figures include brushing4n at comers when all walls are the same color, and at ceilings that are the same color or finished texture. ADD for cutting-in at ceilings if they' re a different color than the walls, or at corners where walls in with acoustic sprain the sama room are painted different colors. Do not include cutting-in time for ceilings unless you' re only painting the ceilings. not the walls. First Floor 3,342.6C Painting 3,342.6C General Painting Costs,Walls, Plaster, Smooth interior, finish, Roll,per 100 SF ofwallarea, Flatlatex,water base, Roll2nd coat, Medium 488 SF/MH, 350 SF/Gal 800 SF 3,342.6C Measurements are based on the square feet of wall coated. Do not deduct for openings less than 100 square feet. These figures assume paint products are being applied over a smooth finish. For heights above 8 feet. use the High Time Difficulty Factors. These figures include brushing4n at corners when all walls are the same color, and at ceilings that are the same color or finished with acoustic sprain texture. ADD for cutting-in at ceilings if they'rc a different color than the walls. or at corners where walls in the same room are painted different colors. Do not include cutting-in time for ceilings unless you' re only painting the ceilings, not the walls. EKO HOMES FILED: KINGS COUNTY CLERK 06/26/2018 02:51 PM INDEX NO. 510024/2017 NYSCEF DOC. NO. 43 RECEIVED NYSCEF: 06/26/2018 Description Oescription Quanttttr Quantity Cost ! Finishing Painting Second Floor 3,342.60 Painting 3,342.60 General PaintingCosts, Walls,Plaster, Smooth interior, finish,Roll,per 100 SF of wall area, Flat water latex, base, Roll2nd coat,Medium 488 SF/MH,350 SFAlal 800 SF 3,342.60 Measurernants are based on the square feet of wall coated. Do not deduct lor openings less than 100 square feet. These figures assume paint products are being applied over a smooth finish. For heights above 8 leet, use the High Tune Difficulty Factors. These figures include brushing-in at corners when an walls are the same color, and at ceilings that are the same color or finished with acoustic spray-on texture. ADD for cutting-in at ceilings if they're a different color than the walls, or et corners where walls in the same room are painted different colors. Do not include cutting-in time for ceilings unless you' re only painting the ceilings, not the walls. Backyard 8,730.97 Concrete 8,730.97 4" 4" 6' equipment 03 Concrete, Concrete Slab-on-Grade Assemblies, thick x pad, Hand trimming and shaping, 500 SF 8,730.97 Typical costs- including fine grading, edge forms, 3,000 PSI concrete, wire mesh, finishing and curing. Project Total 365,975.85 Tax 32,480.35 Total with Tax 398,456.20 We appreciate your business and look forward to working with you. (4 Approved By: Date: Date: Contractor Customer