arrow left
arrow right
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
  • LOUIS PAYCHECK  vs.  PUNIT K. SARNA, et al(06) Unlimited Breach of Contract/Warranty document preview
						
                                

Preview

Electronically by Superior Court of California, County of San Mateo ON 4/19/2021 By. /s/ Alex Yeung MATTHEW A. HAULK (SBN: 272457) JOSE M. HERRERA (SBN: 2589590) RAGGHIANTI FREITAS LLP 1101 Fifth Avenue, Suite 100 San Rafael, California 94901 Telephone: (415) 453-9433 Facsimile: (415) 453-8269 Attorneys for Defendants PUNIT K. SARNA and PUJA SARNA SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SAN MATEO 10 LOUIS PAYCHECK, CASE NO.: 19CIV02595 11 Plaintiff, STIPULATED JOINT TRIAL EXHIBIT 12 LIST vs. 13 Date April 26, 2021 PUNIT K. SARNA, et al., Time 2:00 p.m. 14 Dept. 4 18 ~ Defendants. Complaint Filed: May 10, 2019 16 AND RELATED CROSS-ACTION. Trial Date: May 12, 2021 17 Plaintiff/Cross Defendant Louis Paycheck, doing business as Eurpoean 18 Enterprises, and Defendant/Cross-Complainant Punit Sarna and Defendant Puja Sarna 19 stipulate to authenticity admissibility of the following exhibits at trial: 20 21 No. Description 4 22 Contract (November 12, 2017) 23 Invoice (July 14, 2018) 24 Change Order Invoice (September 16, 2018) 25 Sarna Project Checks (November 2017 — November 2018) 26 Statement of Payments to Employees (1 of 2) 27 28 Statement of Payments to Employees (2 of 2) 1 STIPULATED JOINT TRIAL EXHIBIT LIST No. Description Paycheck Business Checking — Check Stubs 1099 Miscellaneous Income (2016-2018) CSLB Certification (5.11.20) 10 Policy Information Page (August 2016 to August 2017) 1 Certificate of Insurance (August 21, 2016 to August 21, 2017) policy LOWC799618 12 Notice of Cancellation (May 1, 2017) policy LOWC799618 10 13 CSLB Notice (June 19, 2017) 11 14 Exemption from Workers Compensation (June 21, 2017) 12 15 Proposal for Policy (December 1, 2017 to December 1, 2018) policy 13 EUWC820893 14 16 Certificate of Insurance (December 1, 2017 to December 1, 2018) policy 15 EUWC820893 16 17 Cancellation of Policy (December 1, 2017 to February 28, 2018) policy 7 EUWC820893 18 18 Response to Premium Audit (December 1, 2017 to February 28, 2018) policy 19 EUWC820893 20 19 Policy Information Page (February 28, 2018 to December 1, 2018) policy LOWC835806 21 20 Certificate of Insurance (February 28, 2018 to December 1, 2018) policy 22 LOWC835806 23 21 Notice of Non-Renewal (October 10, 2018) 24 22 Notices of Suspension from CSLB 25 26 23 www.cslb.gov - C16 License #662030 info SSS Fire Protection 27 24 Project Photographs (Misc)* 28 *(*Subject to meet and confer on selection of photographs) 2 STIPULATED JOINT TRIAL EXHIBIT LIST Dated: April 19, 2021 RAGGHIANTI | FREITAS, LLP By” Matthew A. Haulk, Esq. Attorneys for PUNIT AND PUJA SARNA Dated: April 19, 2021 KELLY LITIGATION GROUP, INC. By: /s/ Richard M. Kelly Richard M. K E Michael Me ngarelll. aa: Attorneys for laintiff & Cross Defendant, LOUIS AYCHECK dba EUROPEAN ENTERPRISES & Cross Defendant 10 SURETEC INDEMNITY COMPANY 4 12 13 14 15 16 7 18 19 20 24 22 23 24 25 26 27 28 3 STIPULATED JOINT TRIAL EXHIBIT LIST Exhibit 1 EUROPEAN ENTERPRISES 711 SOUTH ROAD BELMONT, CA 94002 GENERAL CONTRACTOR CAL. STATE LIC, # 763968 TEL: (650) 619-0266 November 12, 2017 TO: Peter Sarna 721 Rollins Rd Burlingame, CA Tel: (650) 918-9540 Email: punitsarna@yahoo.com RE: Apartment Remodel Contract Proposal Demolition and Hauling— Remove ceiling, carpet cabinet, tub, bathroom fixtures, interior doors, and debris... 600.00 Purchase 30 yard dumpster for a week, 800.00 Electrical — Install new 4” LED recessed lights throughout the apartment, bathroom, and kitchen., new dedicated GFCI plugs in the bathroom. Replace all knob and tube wiring with Romex. Install new receptacles as needed. Included is all exterior lighting (fixtures purchased by Owner) oteansseseeescnevesseeevasssoerensscsvenss sesseree 2,050.00 Plumbing — Replace all galvanized pipes in the bathroom and the kitchen, up to where it is possible without removing the floor. Replace all drain pipes with ABS pipes where possible without removing the floor. Install new tub and faucets (Tub and facets purchased by the owner). Install hook-“up Washer andnd Dryer Provide plumbing for one garden box... 5,500.00 Carpentry— Install new cabinets and vanities. Install countertops and tiles for backsplash (Tiles, cabinets, and countertops purchased by the owner). Repair dry rot in apartment # 2... 4,000.00 Sheetrock — Replace all sheetrock. Tape, mud, and smooth wails. Purchase and Install Insulation throughout the apartment $ 6,000.00 Purchase, Remove and Install new hardwood floors. eaeseeesansesseesrers 2,700.00 Exhibit 1 8 Tiles — Install approx.. 200 sq ft of floor and wall tiles. (Tiles Page 2 Peter Sarna purchased by the owner).............04 $ 2,000.00 Re-stucco the carport area and shear walls aceeeeeseneeeeetasaeeteeeereesenenee $ included 10. Install fire sprinkler system (additional $600.00 for preparing a drawings if needed)... $ 9,500.00 11 Finishing Carpentry — Install baseboards and new doors. Install hood for all ovens to the roof............... $ 1,600.00 12 Purchase and install new vinyl Milgard windows. Resize Kitchen window in Apt#}..........0. $ 2,500.00 13 Paint the entire apartment............0+ $ 900.00 TOTAL LABOR AND MATERIALS. ae tesseeeseaseseneenee $ 28,650.00 The above price per apartment. The expenses to redo the laundry room will be $ 6000.00. Seismic, installing metal beams, and structural engineering, is $ 25,000.00. Removing stucco from the bottom of the balcony, evaluating the damage, and possibly repair, approx. $ 6,000.00. Demolition and repair of the black mold in unit 1 will be $ 1,200.00. The seismic work will include two shear walls and stucco. Install 2 ea. 4” ballards in front of the electrical panel in the carport. Purchase and replace 4 ea. exterior doors for the laundry and storage area. The job will be completed in 90 days or less, weather permitted. Work will begin when all materials are at the job site. Any changes to the above contract, requested by the owner, will be charged on hourly plus material basis. Down payment of 10% will be required at the signing of this agreement. Our company is insured and bonded for $2,000,000 (two million) dollars liability and workmen's compensation. For more information call Louis Paycheck at (650) 619-0266 or (650) 631-6620 Tel/Fax, EUROPEAN ENTERPRISES, APPROVED, LOUIS PAYCHECK, PETER SARNA, Contractor Owner Exhibit2 EUROPEAN ENTERPRISES 711 SOUTH ROAD BELMONT, CA 94002 GENERAL CONTRACTOR CAL. STATE LIC. # 763968 TEL: (650) 619-0266 July 14, 2018 TO: Peter Sarna 721 Rollins Rd. Burlingame, CA Tel: (650) 918-9540 Email: punitsarma@yahoo.com RE: Apartment Remodel Invoice Demolition and Hauling — Remove ceiling, carpet, cabinet, tub, bathroom fixtures, interior doors, and debris. a teseseseeeseeenesestereatenceeeeeee 600.00 Purchase 30 yard dumpster for a week. aestesesssneseseaesaeeesseseneseseesesesenee 800.00 Electrical — Install new 4” LED recessed lights throughout the apartment, bathroom, and kitchen., new dedicated GFCI plugs in the bathroom. Replace all knob and tube wiring with Romex. Install new receptacles as needed.. Included is all exterior lighting (fixtures purchased by Owner)... eeuvsneareerereuneresuanrersseezeese 2,050.00 Plumbing — Replace all galvanized pipes in the bathroom and the kitchen, up to where it is possible without removing the floor. Replace all drain pipes with ABS pipes where possible without removing the floor. Install new tub and faucets (Tub and facets purchased by the owner). Install hook-up Washer and Dryer. Provide plumbing for one garden box stseeeeeseneeeeaeseenensanensnee seteeeneeen 5,500.00 Carpentry — Install new cabinets and vanities. Install countertops and tiles for backsplash (Tiles, cabinets, and countertops purchased by the owner). Repair dry rot in apartment # 2. seoeseceeseacereneseenseesesaeente 4,000.00 Sheetrock — Replace all sheetrock. Tape, mud, and smooth walls. Purchase and Install Insulation throughout the apartment .... $ 6,000.00 Purchase, Remove and Install new hardwood floors. ceeeeterateeneeeeesee 2,700.00 Exhibit 3 8 Tiles — Install approx.. 200 sq ft of floor and wall tiles. (Tiles purchased by the owner)..... 2,000.00 Page 2 Peter Sarna 9 Re-stucco the carport area and shear walls included 10. Finishing Carpentry — Install baseboards and new doors. Install hood for all ovens to the 100f............sesssssesssstssesseessseeeesseessneeseseessaee $ 1,600.00 11 Purchase and instal] new vinyl Milgard windows. Resize Kitchen window in Apt#1 aeeeeeeeeceeseesenusaeseseneenenensecenesenneneesnenseseesnenesueaesesseeeeg 2,500.00 12 Paint the entire apartment. $ 900.00 TOTAL LABOR AND MATERIALS. ateteeteeseneeeeeenees $ 28,650.00 ADDITIONAL EXPENSES: 1 Purchase and Install 5 Ea. Wall heaters at $ 700.00. seeetseesesseererensesneees 3,500.00 Purchase new gas vent pipes from the heaters and kitchen vents. eeeeeeeeen $ 1,200.00 Create drawings and install sprinklers. $ 10,300.00 Purchase and relocate electrical panel for unit #1 see tesaeanseneteseneenenensenen 650.00 Permit and Inspection cost and Prints. 1,232.11 Second Permit for unit # 5. atseeseeseneaneecaesenersssenesseneeserenentssseenetataceeeaees 128.44 Paid Fees to Structural Engineer. seseteeeeee ateeeeeeeensen 700.00 Repair Black Mold in Unit # 1 stesnesteansenstereceseetonsereneesesenestonreeretenesersetea 1,200.00 Purchase 5 ea. Tubs with metal overflow............sescecsssssssessesnesseeeeeneees $. 3,459.88 10. Redo the Laundry room. dseeassseeessesecneseseesenesseaeneessteeenseneseseeeensseaesaeneenens $ 6,000.00 11 Purchase lights for Laundry and Storage room. seseerenersesensnseseeeesesensenen 187.97 12. Pay for permit for seismic. cssensaneetsceaearages sessneeonsnsecenseeeeeneseeneneseenen 602.17 13. Removing stucco from the bottom of the balcony. sestapeenenageensneesensecenansen 3,000.00 14. Seismic, Installing metal posts in carport. leveetencenecsesenereerecsssaesenecsoneesoeces $ 20,000.00 15. Redo the balcony walkway — Completely redo the upstairs walkway with new framing, % plywood, Waterproofing and 3” concrete. eeaeeenneaeel $ 30,000.00 16. Stucco the bottom ceiling in the carport sedesasnseseaceeseseenssnenenssnacecaetenennenenen 13,000.00 17. Purchase materials for closet shelves. asseseeseateeeeeaseseseeseseseenseessesaeeenesseeensees $ 1,022.35 18. Purchase additional cabinets Panels. ateceesernsesaesesatscserseatsenseeesenceseasesessenses 245.46 19. Purchase additional sub-way tiles.sea sncnasbeeesecescecnsecanersenenessenseensesseenecenaee 232.32 TOTAL ADDITIONAL EXPENSES. seeeseesesersenerenene! $ 93,650.70 The above price per apartment. The expenses to redo the laundry room will be $ 6000.00. Seismic, installing metal posts and repair some balcony boards is $ 25,000.00. Removing stucco from the bottom of the balcony, evaluating the damage, and possibly repair, approx. $ 6,000.00. Demolition and repair of the black mold in unit 1 will be$ 1,200.00. The seismic work will include two shear walls and stucco. Install 2 ea. 4” bollards in front of the electrical panel in the carport. Purchase and replace 4 ea. exterior doors for the laundry and storage area. PAYMENT SCHEDULE: Total apartments Payment (28,650.00 X 5 Apt). esseseateneneoreneseene $ 143,250.00 Additional Expenses. steseeseseeeeesteessarsesenenseapeneesae: ee sae $ 93,650.70 Total Cost. aeseseeeeeetenseeeesesnenensnensteeteceas $ 236,900.70 Payments to date.. seve 210,000.00 Balance due. asansceatatsccersevesssseesressnrenseen $ 26,900.70 Balance due at completion and final Inspection. Exhibit3 EUROPEAN ENTERPRISES 711 SOUTH ROAD BELMONT, CA 94002 GENERAL CONTRACTOR CAL. STATE LIC. # 763968 TEL: (650) 619-0266 September 16, 2018 TO: Peter Sarna 721 Rollins Rd. Burlingame, CA Tel: (650) 918-9540 Email: punitsarna@yahoo.com RE: Apartments Remodel Change order Invoice Install Wall Cabinets in carport. 2,500.00 Purchase and Install Laundry room granite. 1,000.00 Fire sprinklers additional Valve purchase and Installation. 2,700.00 Paint Laundry and storage room floors with epoxy paint. 600.00 Install shower doors. 875.00 Additional Stucco the front of the Building. 1,500.00 Run Electrical conduit for fire alarm system. 400.00 Run additional AC wire for the Alarm. 400.00 TOTAL LABOR AND MATERIALS. 9,975.00 Paid to date. 5,000.00 BALANCE DUE. 4,975.00 E xhibit4 an Amount Sequence Number 9592347739 Account Capture Date: 12/12/2017 Bank Number: 12100035 Check mb 1190 (aero sonore a DEVI SARNA — m™® P&P SARNA ~ 1190 841 PROSPECT ROW eae Comesnvateoe SAN MATEO, ‘ janes Bertanateomak CA 94401 x. ay ie 1 Sevag | $f 20, ow. ses Pay to the {} orderof Con em, wae Dollars A gueree = jee ** ff FH ustor iBankofAmerica <> 97 3008 El Camino Real ° mn fagmat “1 Fellas _ | » 122230003 58023 290m 723 Va sa a® S530 4 spap 22 SR 480209°""""1334 SUS4S745 2000000 x> 20171210 5894 157507331500 Az a4 és 9 °So ~eee Electronic Endorsements Date Sequence Bank # Endrs Type TRN RRC Bank Name 12/12/2017 009592347739 121103886 Pay Bank N BANK OF AMERICA NA 12/11/2017 008150310940 91000022 Undetermined N v.s. BANK NA 12/12/2017 712110282400067 91000022 Rtn Loc/BOFD Y us BANK NA Amount : $10,000.00 Sequence Number 8292851399 Account: Capture Date: 12/19/2017 Bank Number: raioooas Check Number: z191 = = PR OE = INT na +: oN PGP SARMA 1191 861 PROSPECT ROW Aly i Las Sar Pex MATED,CA 64401 1210 “aM at tt eS 2HS Be eo WO aa an ate z De ji! hae ah 4 ae Pr to the « rat att eases 3 = $ (2, Oop ing ph % 3 fee “ein fled i a Dollars ae RB: Te age Mpa, om A2083f > af a, 209 S Ei Comins Beal rf of Doe es Mates CA. Part 2 pr, tv h's : = wth? song 3SBN0 ba bw ied be6 of =3 7 es 3 = ¢2 Ww of- «= , a2 a ¥ m3 E airs ey ear 1 |. s 7 ~ Electronic Endorsements: Date Sequence Bank # Endrs Type TRN RRC Bank Name 12/18/2017 008150375104 91000022 Undetermined Nv U.S BANK NA 12/18/2017 5778496871 123000220 Rtn Loc/BOFD y U.S. BANK NA 12/19/2017 008292851399 121103886 Pay Bank N BANK OF AMERICA NA Amount $15,000.00 Sequence Number 9892801690 Account a Capture Date 01/05/2018 Bank Number 12100035 Check Number 1192 TON SERVA TION INTERNATIONA DEVI SARNA me P&P SARNA fw on, 1192 841 PROSPECT ROW vs Vavi210 inrtanationa. SAN MATEO, CA 84401 iS St, late aes on ety Pay to the order of. ait ve fess Cote VorcSas 1 $| 7S) ao,= a tao Vic ye og i Dollars ier, peice va on“gt jaoningko! fae Cusisnitt ir Se 900 § EI Camino Seal ot, Peg! Ban Mateo CA mS <. 40 650.616.4700 Mak *3. roe oS fw Tian aa 7ee alana For Whe sO00 358 iad vo = * 3a on a7 oo so> ad sz OR 480209**"""*1334 SUS4S745 1500000 a> : On 20180105 7873 157507331500 az |: 5 : nis S = lé 9 on ee eres’ Electronic Endorsements Date Sequence Bank # Endrs Type TRN RRC Bank Name 01/05/2018 009892801690 121103886 Pay Bank N BANK OF AMERICA NA 01/05/2018 802050230100057 91000022 Rtn Loc/BOFD Y u s BANK NA 01/05/2018 009256064888 91000022 Undetermined N u.s BANK NA cet e ete e eerie eee pOMEUUI ULV BankofAmerica Online Banking cen Rollins: Account Activity Transaction Details Check number: 00000001195 Post date: 01/29/2018 Amount: -20,000,00 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc; Checks category: P&P SARNA 1195 ‘941 PROSPECT ROW & TECH oA 1-ab- 1g wow rwtote European Bikignite $| 20, 00 ausan vs: cents — Dots ER anon Justomer,place merica ae: ea VEN MausCaan Rak SE BIIAS, id Pryyent+y Wb2O00aSheU255 Se 925 a32B ,[; b. "+4334 SUS4S745 2000000 aorat27 ‘9408 157507331500 ae i£83 hie tt Aa https://secure.bankofamerica.com/myaccounts/details/deposit/last-page.go?skip=true&adx=53ecf2e55efSf02b59b0adb9fe96Be9d4eb5208dad 763c6e. VW peiiresgy sees we eri | ReCUEIKS | RULUUIN Ueiane | ALUUUIIL AGUVIY, Bank of America Online Banking Rollins: Account Activity Transaction Details Check number: 00000001198 Post date: 03/06/2018 Amount: -15,000,00 Type: Check Description: Check Merchant name: Check Zz Transaction Cash, Checks & Misc: Checks category: TOM DEVI SARNA — P&P SARNA Nes 1198 ai PROSPECT ROW (Granta SAN MATEO, CA 94401 nse vd Var 2 hog i ot tothe og —ea 8 7F om — Sed es Dols EE. son i ‘fag BankofAmerica Conse > luster” Sane <0 prams Birk. 22220005580 2155" age 2a ge ae BEBs 480209"""*4334 SUS4S745 1500000 8s a> x 20180304 2437 157507331500 “3 % a — hitps://secure.bankofamerica.com/myaccounts/details/deposit/last-page.go?skip=true&adx=53eciZe5S5efSf02b59b0adb9fed68e9d4eb5208da4763cée.., aw bank ot America | Online Banking | Accounts | Account Details | Account Activity Bankof America Online Banking ~ Rollins: Account Activity Transaction Details Check number: 00000001200 Post date: 03/19/2018 Amount: -20,000,.00 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks Sarees {aia sR . O41Par PROSPECT Sain ROW: rer 1200 (rasanass SAN MATEO,CA 94401 3D, I; ‘ Nan Pay to the ae er ler of ree Sao nw + Vo— ns 8 Le Ss Pract i = “s 428000 d 5h t 200 TT. 3% ae x 4g0209"""*"*1334 SUS4S745 2000000 Fes a> x aerate ae aH toe “Z Fi Gate vege https://secure.bankofamerica,com/myaccounts/details/deposit/iast-page.go?skip=true&adx=53eci2eS5afSf02b53b0adbOfed6heddaehsInRdad7AarRe 44 ree) Sie Gunmiy | MeLUUIKS | RELUUTL LeLalls | ACCOUNT ACTIVITY Bank of America Online Banking sro Rollins: Account Activity Transaction Details Check number: 00000001201 Post date: 03/26/2018 Amount: -13,130.63 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks category: ene P&P SARNA 1201 ‘Bat PROSI ——— i SAN MATEO, CA 94401 Bf ase sun Pay to the ui Sing | 0 UE Corieoad aeaaiearee Cabrots 740 Pallas Aft 22220003580 1 20 a" Ny cag saobonienngsg SUS4S745 1313063 20180326 ads Teraerssteo0 353 4 19 https://secure, bankofamerica.com/myaccounts/details/deposil/last-page.qo?skip=true&adx=53eci2e55efS{02b50b0adb9fe968e9d4 eb5208da4763cé. 1A ‘ eu ating Bank of America Online Banking Se Rollins: Account Activity Transaction Details Check number: 00000001202 Post date: 04/03/2018 Amount: -200.00 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks category: Comin DEVI SARNA w: SARNA ~ 1202 ‘SESUREL BAN MATEO, GA beuat SV e - shila. “ ou Earopenn p £. ts Ones $ [2082 ane “Cn tneef oo —— dois Oe Kk Bison ae “527 Aolims. Cosi aie Shama Weeke mvnray for. = 210003580) 20 yo g4eo 38 eaz 480200""""*4334 SUS4S745 20000 245 Sree 4705 sre SS soni ase https://secure.bankofamerica.com/myaccounts/details/deposit/last-page.go?skip=true&adx=53eci2e55efSf02b5ob0adbSfed68e8d4eb5208da4763cbe... WW pr seeeetie een | UOUUHE MUIVIKY: Bank of America er Online Banking Rollins: Account Activity Transaction Details Check number: 00000001203 Post date: 04/10/2018 Amount; -20,000,00 Type: Check Description Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks category: DEVI SARNA P&P SARNA 1203 Sa ‘841 PROSPECT ROW MATEO, CA 94401 thle, "8 teh i eines ay 10 th order of . “atin Ett $Czg a0 En OE mie e' Sei piog | Ix 4aodoor"1344 Sus48745 200 moines 157507331500 a ge g0 He loa 4 https://secure.bankofamerica.com/myaccounts/details/deposit/last-page.go?skip=(rue&adx=53eci2e55ef5f02b59b0adb9feIGBedd4eb5208dad763cb0, 4 cig pore eee | een eta | MULUULIL AUIIVILY Bank of America Online Raubing Rollins: Account Activity Transaction Details Check number: 00000000728 Post date: 05/02/2018 Amount: -20,000.00 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks category: ese sree {4 PROSPECT ROW 728 sr AN MATEO, CA 84401 pue_ZAal ey‘derto 0}the leprae§h, hes sano as r Dollars BES © FA wank of America ¢seen Nir sian Bren e007 wr ‘Ban Mining, CA w4hez (448) DYEAATOS For, # 2) eof lng Pe Ss — 1121000358007 25 ifi tyay Pal " oi | Boa ine? § BREea Y jgrnr*"*"1334 SUS4S745 2000000 1502 7276 157507331500 a> “a i i https://secure.bankofamerica.com/myaccounts/details/deposit/last-page.go?skip=true&adx=53eci2e55efSf02b59b0adbSfe9G8e9d4eb5208da4763cée... aw wo “ mnive | Vins Batinuly | AULOUTIS | ACCOUNT Vetalls | Account Activity Bankof America Online Banking tiie Rollins: Account Activity Transaction Details Check number: 00000000730 Post date: 05/21/2018 Amount: -20,000.00 Type: Check Description: Check Merchant name: Check ? Transaction Cash, Checks & Misc: Checks category INDEN KUMAR SARNA 730 DEVI GARNA, ‘eer PROSPECT ROW | y wasn -BAN MATEO, OH 0440) Date. Bayto th SS