Project 1 Page
2 List of Documents 8 Pages
3 GMP Cost 3
4 General Conditions 14
5 Allowances 2 Pages
6 General Exclusions 5 Pages
7 Assumptions and Qualifications 4 Pages
8 Schedule 2 Pages
9 Plan 4
10 Assignment and 1 Page
of Contract
7
Date
G0005l
Zt8T~OOOD
1010 Avenue of the Atneriess
New Yorl<, New YOO; 10018
Area 14,432 sf
Building foot print (at grade) 8,820 51
12 new floorS -+mech on top of existing 12 floors
New one story, below grade addition @ Crosby Street
BUILDING HEIGHT
Total height above grade to existing roof 150'-5" vII
Total height above grade to new rool 305'-8" vlf
Total height above grade to top of bulkhead 362'-9" vII
BUILOING AREA
Cellar 14,432 sf
Cellar Mezzanine 4,100 sf
1st floor ( includes stairs to basement level @ Crosby Stl B,505 sf
2nd -existing (irlcJuding HVAC, Emerg. Gen.lMech, & Storage/Prep)
4,674 sf
3rd thru 13 lIoor(4,674 sflfloor x 11} existing 51,414 sf
14th Ihru 231100r (4,674 sfllloor x 10) new 46,740 sf
24 floor 4,105 sf
25 floor 2,602 sf
26 floor 2,602 sf
Roof bulkhead ( EMR & Boiler room) 2;340 sf
-.---sf
TOTAL BUILDING AREA ................................. ,..............................
ROOMS
Standard rooms 232 ea
1 BR Suiles 41 ea
Penthouse 1 ea
Number of Keys -----:2=7:-:-4 ea
82 ea
211 ea
276 ea
lays 271 ea
Double Lavs 5 ea
HOTEL ESTIMATE
Page 1 of 1
G00051843
171781 ~OOOD
Slu~mnJOa JO lS!'I
Section 2 - List of Documents • Street Hotel
Contract No.: 794-00000-000
Date: JuJy31, 2007
SECTION 2
' \Plans, Drawings, References and Specifications listed below are herein made part of this
--:;:::7 govern
unless modified elsewhere. Drawings as H. Thomas O'Hara Rice
Architect, DeSimone Engineering Structural and AKF Engineers.
relue,sellits the most recent set of for
actual Drawing & dates that apply to tbe trades. Most document dates for tbe
Trade contracts differ from the below list. The Trade respective Drawings and Specifications control.
LIST OF DRAWINGS:
ARCHITECTURAL ORAWINGS (H. THOMAS O'HARA ARCHITECT)
A-OOI ----. General Notes 4/612007
A-OOZ ----- General Notes I Fayade Notes 4/6/2007
A-003 ---- & Symbols 4/612007
A-004 ---- Local Law 58 187 4/6/2007
A-005 Code 4/612007
A-OOG ----- 4/612007
A-IOO Site Plan 4/612007
A-1O I ----- Cellar Floor Plan 4/612007
A- J 0 I A _.--- Cellar Plan Option I) 6/12/2007
A-lOlB ----- Cellar Plan (Kitchen Option 2) 6/12/2007
A- J0 I M -.-.- Cellar Mezzanine Floor Plan 4/612007
A-I02 Ground Floor Plan 611212007
A-103 2nd Floor Plan 4/612007
A- 104 Jrd - 12th Floor Plan
'0_-- 6/1212007
A-lOS ---- 13th - 18th Floor Plan 611212007
A-106 ----- 19th23rd Floor Plan 611212007
A-I07 ---- 24th Floor Plan 6112/2007
A-lOS ---- 25th Floor Plan 611212007
A-109 ----- 26th Floor Plan 6/1212007
A-110 ----- Boiler Room Plan 4/6/2007
A-Ill ---- Elevator Machine Room Plan 4/6/2007
A-112 ----- Bulkhead Roof Plan 4/6/2007
A-20 I .--_. North and East Elevations 4/6/2007
A-202 South and West Elevations 4/6/2007
A-21O ----- Schematic Sections 4/6/2007
A-240 ----- Stair Sections 4/6/2007
A-241 ----- Core Plans 4/612007
A-242 ---- Core Plans 4/6/2007
A-243 Core Details 4/6/2007
A.-300 .--- Wall Partition 4/612007
A-30t Partition Details 4/6/2007
A-302 ---- Door 4/6/2007
A-3J 0 ----- Window Schedule 4/6/2007
A-311 ----- Glazin1!. Tvoe5 - North and East Elevations 5/1612007
A-312 ---- - South and West Elevations 511612007
10(8
G00051845
Section 2 - List of Documents Crosby Street Hotel
Contract No.: 794-00000-000
Date: July 31, 2007
A-320 ----- Elevations 5/16/2007
A-321 ---- Elevations 4/612007
A-322 ----- Enlarged Elevations 4/6/2007
A-330 ---. Favade Details 5/1612007
A-331 --- Favade Details 4/6/2007
A-332 ---- Favade Details 4/612007
A-400 ---- Kitchen Plans & Elevations 4/612007
A-401 ---- Kitchen Plans & Elevations 4/6/2007
A-402 Kitchen Details & Schedule 4/6/2007
A-SOl ---- Bathroom Plans & Elevations 4/6/2007
A-502 --- Bathroom Plans & Elevations 4/612007
A-503 ---- Bathroom Plans & Elevations 4/6/2007
A-504 ---- Bathroom Plans & Elevations 4/612007
A-601 ---- RCP Cellar Floor Plan 4/6/2007
A-601M -.-- RCP Cellar Mezzanine Floor Plan 4/612007
A-602 RCP 1st Floor Plan 4/6/2007
A-603 ----- Rep 2nd Floor Plan 4/6/2007
A-604 ----- RCP 3rd - 12th Floor Plan 4/6/2007
A-60S ---- Rep 13th - 17th Floor Plan 4/6/2007
A-606 ----- RCP 18th Floor Plan 4/6/2007
A-607 ----- RCP 19th - 22nd Floor Plan 4/6/2007
A-60S RCP 23rd Floor Plan 4/612007
A-609 ----- RCP 24th Floor Plan 4/612007
A-610 ---- RCP 25th Floor Plan 4/612007
A-611 ----- RCP 26th Floor Plan 4/6/2007
A·612 ----- RCP Boiler Room 4/612007
STRUCTURAL DRAWINGS (DESIMONE CONSULTING ENGINEERS)
S-001 ----- General Notes Index 04/30/07
S-100 ----- Cellar Plan 04/30/07
S-1000 ---- Cellar Demo Plan 04/30/07
8-101 ----- First Floor Plan 04130107
S-l 0 J0 ----- First Floor Demo Plan 04/30/07
S-lD 1M ----- Mezzanine Floor Plan 04/30/07
S-102 Second Floor Plan 04/30107
S-102D ---- Second Floor Demo Plan 04/30/07
S-103 ----- 3rd12th Floor Plan 04/30/07
S-J 03D ----- 3ed - 13th Demolition Plan 04/30/07
S-113 ---- 13th Floor Plan 1 Roof 04/30/07
8-1I3D RoofOemoliUon Plan 04/30/07
8-114 ----. 14th· 23rd Floor Plan 04130107
8-124 ---- 24th Floor Plan 04130/07
8-125 --- 25th Floor Plan 04/30f07
5-126 ----Roof Plan I 26th Floor Plan 04/30{07
8-127 --- Mechanical Penthouse Plan I 27th Floor 04/30/07
8-128 Upper Mechanical Penthouse Plan 128th Floor 04130107
8-129 ---- Upper Bulkhead Roof Plan I 29th Floor 04/30/07
8-20 I ---- Column Schedule 04/30/07
S-202 ---- Elevations 04130/07
S·203 -'-- Mat Plan & Details 04130/07
Page 20f8
000051846
Section 2 List of Documents Street Hotel
Contract No.: 794-00000-000
Date: July 31, 2007
S·204 Shear Wall Plans &Elevations 04/30/07
S-205 ----- Shear Wall Plans &
Elevations 04/30/07
S-206 ---- Shear Wall Plans & Elevations 04/30/07
S-207 .-.-- Shear Wall Plans & Elevations 04/30/07
8-208 ._--- Shear Wall Plans &
Elevations 04/30/07
8-209 -..-- Shear Wall Plans & Elevations 04/30/07
S.30 1 -.-.. Foundation Details 04/30/07
S-303 -.-.- Foundation Sections and Details 04/30/07
8-304 Foundation Seetions and Details 04130107
8-305 .---. Foundation Sections and Details 04/30/07
S·310 --... Concrete Sections and Details 04/30/07
S-311 .---Â CMU Sections and Details 04/30/07
S·3 J2 --... Concrete Sections and Details 04/30/07
8-313 Typical Masonry Sections and Details 04130107
8-40 I ·----Renovation Steel Sections and Details 04/30/07
8-402 --··~Renovation Steel Sections and Details 04/30/07
S-403 ----Renovation Steel Sections and Details 04/30/07
8-404 ·--Renovation Steel Sections and Details 04/30/07
S-4 J I --- Steel Sections & Details 04/30/07
8-412 Typical Steel Sections & Details 04130107
. S·413 --.,. Typical Steel Sections & Details 04/30/07
8-414 .---- New Steel Sections &
Details 04/30/07
8-70 I --.-- Transit General Notes 04/30/07
8-702 ---- Building Sections 04/30/07
MECHANICAL DRAWINGS (AFK ENGINEERS)
HVAC DRAWINGS
M-OO 1---- HVAC Symbols Notes, List & Abbreviations 05/07/07
M-l 0 1---- HVAC Cellar - Mechanical Plan 05/07/07
M-I01M ---- HVAC Mezzanine Plan 05/07/07
M-102 ----- HVAC I st Floor - Mechanical Plan 05/07/07
M-I03 HVAC 2nd Floor - Mechanical Plan 05/07/07
M-104 ---- HVAC Third Twelfth Floor Plan 05107/07
M·105 ----. HVAC Thirteenth - Eighteenth Floor Plan 05/07/07
M-106 ----- HVAC Nineteenth - Twenty Third Plan 05/07/07
M-107 -._- HVAC Twenty Fourth Floor Plan 05/07/07
M-108 HVAC Twenty-Fifth Floor Plan 05/07/07
M-109 --... BVAC Twenty Sixth Floor Plan 05/07/07
M-IIO ----- HVAC Penthouse Mechanical Room Plan 05107/07
M-Ill ----- HVAC ElevatorMachine Room Plan 05/07/07
M-1l2 ----- HVAC Roof Plan 05/07/01
M-JOl -.-- HV AC Exhaust Riser 05/07/07
M-302 ----- HVAC Exhaust Riser 05/07/07
M-303 HVAC Exhaust Riser 05/07/07
M·304 .---- HVAC Water Riser Diagram 05/07/07
M·30S ---- HVAC Water Flow Diagram 05/07/07
M-400 ----- HVAC Details 05/07/07
M-4Ol ---- HVAC Details 05/07/07
M-402 --- HVAC Details 05/07f07
M-403 HVAC Details 05/07/07
Page 3 of8
G00051847
Sectioll2 - List of Documents Crosby Street Hotcl
Contract No.: 794-00000-000
Date: July 31,2007
M-SOO ---- HV AC Schedules 05/07/07
M-50l HVAC Schedules 05/07/07
ELECTRICAL DRAWINGS
E-OO 1---- Electrical List, Notes & Index 05/07/07
E-002----- Electrical Abbreviations, & Notes 05/07/07
E-l 01-..-- Electrical Cellar Lighting Plan 05/07/07
E-102----- Electrical Mezzanine Floor Plan 05/07/07
E-103 ---- Electrical Ground Floor 05/07/07
E-I04 ----- Electrical Second Floor 05/07/07
E-20 I --- Electrical Cellar Power Plan 05/07/07
E·202 ----- Electrical Cellar Mezzanine Floor Power Plan 05/07/07
E-203 ----- Electrical Ground Floor Power Plan 05/07/07
E-204 --- Electrical Second Floor Power Plan 05/07/07
E-300 --- Electrical 3rd - 12th Floor & Power Plan 05107/07
E-301 --•• - Electrical 13th - 17th Floor & Power Plan 05107/07
E-302 ---- Electrical Eighteenth & Power Plan 05/07/07
& Power Plan 05/07/07
E·304 .---- & Power Plan
Electrical 23rd Floor Lighting 05107/07
&305 -----EleclTical24tb Floor Lighting Plan 05/07/07
&306 -----Electrical 25th FloOf & Power Plan 05107/07
E-307 & Power Plan
Electrical 26th Floor Lighting 05/07J07
&308 -----Electrical Penthouse Mechanical Room Plan 05107/07
&309 Electrical Elevator Machine Room Plan 05107/07
E-310 ----Electrical Roof Plan 05/07/07
E-500 --- Electrical Power Riser Diagram Plan 05/07/07
E-50 I --- Electrical One Line Diagram 05/07/07
E-600 -.-.- Electrical Schedules Sheet I of 3 05107/07
E-60 I Electrical Schedules Sheet 2 of3 05107/07
E-602 Electrical Schedules Sheet 3 on 05/07/07
E-700 -.--- Electrical Details Sheet I of2 05/07107
E-70 1 -._-- Electrical Details Sheet 2 of 2 05/07/07
E-702 ---. Electrical Ligj}tniinl! Protection Details, Notes 05/07/07
FIRE ALARM DRAWINGS
FA-lO! ---- Fire AlarmCellar Plan 05/07/07
FA-I02 .---- Fire Alarm
Ground Floor Plan 05/07/07
FA-J 03 ----- Fire Alarm
Second Floor Plan 05/07/07
FA-I04 ----- Fire Alarm
Third - Twelveth Floor Plan 05/07/07
FA-105 ----- Fire Alarm Thirteenth - Floor Plan 05/07/07
FA-106 ----- Fire Alarm Nineteenth - . 05/07/07
FA-I 07 ----- Fire Alarm Twenty Fourth Floor Plan 05107107
FA-I 08 Fire Alarm Twenty Fifth Floor Plan 05/07/07
FA- 109 ----- Fire Alarm Twenty Sixth Floor Plan 05107/07
FA-I 10 ---- Fire Alarm Penthouse Mechanical Room 05/01107
FA-300 ---. Fire Alarm System Riser 05107/07
PLUMBING DRAWINGS
P-OO I ----- Abbreviations & Notes 05107/01
P·lO I ---- Plumbing Cellar Cellar Plan 05/07/07
Page 4 ofS
G00051848
Section 2 - List of Crosby Street Hotel
Contract No.: 794..QOOOO-OOO
Date: July 31, 2007
P-IOIM ---- Plumbing Mezzanine Plan 05/07/07
P-l02 --- Plumbing Ground Floor Plan 05/07/07
P-I03 ----Â 2nd Floor Plan 05/07/07
P-I04 ---Â 3rd - lOth Floor Plan 05/07/07
P-IOS 11th Floor Plan 05/07/07
P-106 ---- Plumbing 12th Floor Plan 05/07/07
P-107 ----- Plumbing 13th - 17th Floor Plan 05/07/07
P-108 ----- Plumbing 18th Floor Plan 05107107
P-I09 ----- Plumbinfl 19th - 23rd Floor Plan 05/07/07
P-IIO ----- 24th Floor Plan 05/07/07
P·lll Plumbing 25th Floor Plan 05/07/07
P·112 .--- Plumbing 26th Floor Plan 05/07/07
p.! 13 Plumbing Penthouse MER 05/07/07
P-114 --- Plumbing Elevator Machine Room 05/07/07
P-11S --- Roof Plan 05/07/07
P-200 ---- Plumbing Domestic Water & Gas Riser Diagram 05/07/07
P-201 Plumbing Sanitary Riser 05/07/07
P-202 --- Plumbing Stonn Riser D!allTanl 05/07/07
P-300--- Plumbing Details 0'5/07/07
P-30 1 ---- Plumbing Backflow lnstallation Details 05/07/07
FIRE PROTECTION DRAWINGS
F-00 I ---- Fire Protection - Riser 05/07/07
F-lOO --- Fire Protection Cellar Plan 05107/07
F-I () I ---- Fire Protection Mezzanine Plan 05/07/07
F-102 ----- Fire Protection Ground Floor Plan 05/07/07
F-I03 ---- Fire Protection 2nd Floor Plan 05107/07
F-104 --- Fire Protection 3rd -12th Floor Plan 05107/07
F-105 ----- Fire Protection 13th -18th Floor Plan 05107/07
F-106 ._--- Fire Protection 19th -23rd Floor Plans 05107/07
F-I07 -..-- Fire Protection 24th Floor Plans 05107/07
F-I08 ---- Fire Protection 25th Floor Plan 05107/07
F-I09 ---- Fire Protection 26th Floor Plan 05107/07
F- I 10 ---.- Fire Protection Penthouse MER 05107/07
F-Ill Fire Protection Elevator Machine Room 05/07/07
F-300 ---- Fire Protection Details 05/07/07
EXISTING BUILDING SURVEY (FOG CITY
A 1.1 ---- Existing Roof Plan 1/30/2007
A2.! ---- Basement Level Hoar Plan 1/30/2007
A2.1 --- Existine. First & Second Level Floor Plans lt30/2007
A2.2 ----Â First & Mezzanine Level Floor Plan 1/3012007
A2.3 ---- Second & Third Level Floor Plans 1/30/2007
A2A Existing Fourth & Fifth Level Floor Plans 1/3012007
A2.5 - - Existing Sixth & Seventh Level Floor Plans 113012007
A2.6 ---- Existing & Ninth Level Floor Plans 1/3012007
Tenth & Eleventh Level Floor Plans 1/3012007
Twelth & Value Room Floor Plans 1/3012007
A3.1 East Elevation 1/3012007
A3.2 ---- Existing West Elevation 113012007
A3.3 --- EKisting South Elevation 1/3012007
A3.4 ---- Existing North Elevation 113012007
5 ors
G00051849
Section 2.- List of Documents Crosby Street Hotel
Contract No.: 794-00000·000
Date: July 31, 2007
SPECIFICATIONS
Section 01524 Construction Waste Management 05/01107
Section 01352 LEED Requirements 05/01/07
Section 01810Commissioning of Mechanicl, r,it;I;;U1C
BROOMS, SHOVELS, ETC. 26 3,000 78,000
FINAL CElEANING SUPPLIES ALLOW 0
----:.--Â
17370 TOTAL CLEANING SUPPLIES 78,000
H. CLEANING LABOR INCL ELSEWHER
17371 I. FINAL CLEANlNG
NUMBER COST/
OF UNITS UNIT TOTAL
ROOMS, 0 150 0
PUBuc/coMMON AREAS ALLOW 0
EXCLUDED
17375 J. PORCELAIN REPAIR (ALLOW) 5,000
--Â
17380 K. BREAKAGE & REPAIR (ALLOW) 0
? L RUBBISH CHUTES (TRADE CONTRACTOR QUOTATION) 0
M. HOISTS (TEMP MAT'l & PERSONNEL)
INCLUDES:. HOISJ INSTALLATION, JUMPS, RAMPS,
RAILINGS, SCREENING, RENTAL CHARGES FOR LIFE OF
INSTALLATION, AND REMOVAL & DISPOSAL
17300 TRADE CONTRACTOR QUOTE '" 0
17280 N. TOOLS & SUPPLIES (PURCHASED) (ALlOVll} 20,000
17230 O. EQUIPMENT PURCHASES (ALlOVll} 20,000
17235 P. EQUIPMENT .RENTALS/REPAIRS {ALLOVV) 20,000
G00051869
Q. GRAND TOTAL SITE SAFETY & MAINTENANCE 147,900
GENERAL ITEMS
A TEMPORARY ELECTRIC POWER METER CHARGES
GROSS FLOOR AREA == 141,514
COST/MONTH/GROSS SQUARE FOOT :::: $0.0350
NUMBER OF MONTHS FOR TEMPORARY:::: BY OWNER
17360 TOTAL TEMPORARY ELECTRIC POWER METER CHARGES EXCLUDED
B. TEMPORARY WATER METER CHARGES
GROSS FLOOR AREA '" 141,514
COST/MONTH/GROSS SQUARE FOOT:; $0.0008
NUMBER OF MONTHS FOR TEMPORARY;;; 8YOWNER
17350 TOTAL TEMPORARY WATER METER CHARGES EXCLUDED
17361 C. TEMPORARY GAS METER CHARGES (ALLOVV) o
D. MOCKUPS &. SIGNAGE
SITE SIGNAGE ALLOWANCE 3,000
MOCKUPS CONCRETE. (ALLOW) o
~.17390 TOTAL MOCKUPS & SIGNAGE 3,000
E. INTERIM ELEVATOR MAINTENANCE
aUAN NUMBER COST
TYPE
-~~ ---_._---- ---
LOW RISE ELEVATORS
ElEV
o
MONTHS
--.~ ..-
o
--
{MONTH
1,500
----
... -~- ------Â
TOTAL
o
MID LOW RISE o o 1.500 o
MID HIGH RISE ELEVATORS o 6 1,500 o
HIGH RISE ELEVATORS o o 1,500 o
CARS o o 1.500 o
17540 TOTAL INTERIM ELEVATOR MAINTENANCE INCl ELSEWHER
F. ElEVATOR RESTORATION
QUAN
TYPE ELEV COST TOTAL
LOW RISE ELEVATORS· o 1,500 o
MID LOW RISE o 1,500 o
MID HIGH RISE o 1,500 o
HIGH RISE ELEVATORS o 1,500 o
SERVICE CARS o 1,500 o
17540 TOTAL TEMPORARY ELEVATOR RESTORATION EXCLUDED
G. TEMPORARY ELEVATOR MOTOR ROOM ENCLOSURES
G00051870
UNiT
QUAN COST TOTAL
--- -~------ ------
TEMP PARrNS, POWER, UGHT, ETC. o 10,000 o
REMOVAL & CLEANUP o o
17540 TOTAL TEMPORARY ELEVATOR MOTOR ROOM ENCLOSURES EXCLUDED
17450 H. CUTIING & PATCHING (ALLOW) o
17440 I. MISCELLANEOUS PUMPING (ALLOW) o
17435 J. ACCESS ROADS & MAINTENANCE (ALLOW) o
K. WINTER WEATHER PROTECTION
CONCRETE ALLOW o
MASONRY ALLOW o
PLASTERINGfTAPIN.GJPAINTING ALLOW o
17470 TOTAL WINTER WEATHER PROTECTION EXCLUDED
L GRAND GENERAL ITEMS 3,000
8. BONDS
A. PAYMENT & PERFORMANCE BOND
IS BOND REQUIRED (Y or N) YorN INCl ELSEWHER
B. SUBCONTRACTOR BONDS
DOLLAR VALUE OF SUBCONTRACTORS TO BE BONDED o
BOND RATE 2.00%
TOTAL SUBCONTRACTOR BONDS PARTIAllY lNCL ELSEWHERE
17460 C. GRAND TOTAL BONDS o
GRAND TOTAL ALL GENERAl CONDITIONS =
:======:=:====::;=
000051871
Section 5
Allowances
G00051872
Section 5
CROSBY
July 31, 2007
ALLOWANCES
The GMP contains certain Allowances determined by Owner I ".Y"rl!ll
C>
C>
V>
00
00
-...J
•
Passenger Elevator Pc-2 Operational
.Â
Passenger 8Cv Men 4/13.'09
ConCfete on Meta! Deck 3wks Mon 5118/09
Imelior Frt-out (m;nimum wotk for TCO») 12_
Site'1lV(){k at Pfala Entrance 12 wks Mon &8109
Storefront/Canopy (Crosby St) 8w"-' Wed 718109
days
2<)
Interior Design Coordinated CD's Issued o days
Od8yS
Progress
M~estooo .. SlJmmaty .....---..,.
Project Summart