arrow left
arrow right
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
  • BARBARA, JAMES,E Et Al v. COLONIAL SURETY COMPANYC90 - Contracts - All other document preview
						
                                

Preview

FILED: NEW YORK COUNTY CLERK 05/29/2015 03:56 PM INDEX NO. 651937/2010 NYSCEF DOC. NO. 165 RECEIVED NYSCEF: 05/29/2015 July 31,2007 SECTION: CONTENTS: Project 1 Page 2 List of Documents 8 Pages 3 GMP Cost 3 4 General Conditions 14 5 Allowances 2 Pages 6 General Exclusions 5 Pages 7 Assumptions and Qualifications 4 Pages 8 Schedule 2 Pages 9 Plan 4 10 Assignment and 1 Page of Contract 7 Date G0005l Zt8T~OOOD 1010 Avenue of the Atneriess New Yorl<, New YOO; 10018 Area 14,432 sf Building foot print (at grade) 8,820 51 12 new floorS -+mech on top of existing 12 floors New one story, below grade addition @ Crosby Street BUILDING HEIGHT Total height above grade to existing roof 150'-5" vII Total height above grade to new rool 305'-8" vlf Total height above grade to top of bulkhead 362'-9" vII BUILOING AREA Cellar 14,432 sf Cellar Mezzanine 4,100 sf 1st floor ( includes stairs to basement level @ Crosby Stl B,505 sf 2nd -existing (irlcJuding HVAC, Emerg. Gen.lMech, & Storage/Prep) 4,674 sf 3rd thru 13 lIoor(4,674 sflfloor x 11} existing 51,414 sf 14th Ihru 231100r (4,674 sfllloor x 10) new 46,740 sf 24 floor 4,105 sf 25 floor 2,602 sf 26 floor 2,602 sf Roof bulkhead ( EMR & Boiler room) 2;340 sf -.---sf TOTAL BUILDING AREA ................................. ,.............................. ROOMS Standard rooms 232 ea 1 BR Suiles 41 ea Penthouse 1 ea Number of Keys -----:2=7:-:-4 ea 82 ea 211 ea 276 ea lays 271 ea Double Lavs 5 ea HOTEL ESTIMATE Page 1 of 1 G00051843 171781 ~OOOD Slu~mnJOa JO lS!'I Section 2 - List of Documents • Street Hotel Contract No.: 794-00000-000 Date: JuJy31, 2007 SECTION 2 ' \Plans, Drawings, References and Specifications listed below are herein made part of this --:;:::7 govern unless modified elsewhere. Drawings as H. Thomas O'Hara Rice Architect, DeSimone Engineering Structural and AKF Engineers. relue,sellits the most recent set of for actual Drawing & dates that apply to tbe trades. Most document dates for tbe Trade contracts differ from the below list. The Trade respective Drawings and Specifications control. LIST OF DRAWINGS: ARCHITECTURAL ORAWINGS (H. THOMAS O'HARA ARCHITECT) A-OOI ----. General Notes 4/612007 A-OOZ ----- General Notes I Fayade Notes 4/6/2007 A-003 ---- & Symbols 4/612007 A-004 ---- Local Law 58 187 4/6/2007 A-005 Code 4/612007 A-OOG ----- 4/612007 A-IOO Site Plan 4/612007 A-1O I ----- Cellar Floor Plan 4/612007 A- J 0 I A _.--- Cellar Plan Option I) 6/12/2007 A-lOlB ----- Cellar Plan (Kitchen Option 2) 6/12/2007 A- J0 I M -.-.- Cellar Mezzanine Floor Plan 4/612007 A-I02 Ground Floor Plan 611212007 A-103 2nd Floor Plan 4/612007 A- 104 Jrd - 12th Floor Plan '0_-- 6/1212007 A-lOS ---- 13th - 18th Floor Plan 611212007 A-106 ----- 19th23rd Floor Plan 611212007 A-I07 ---- 24th Floor Plan 6112/2007 A-lOS ---- 25th Floor Plan 611212007 A-109 ----- 26th Floor Plan 6/1212007 A-110 ----- Boiler Room Plan 4/6/2007 A-Ill ---- Elevator Machine Room Plan 4/6/2007 A-112 ----- Bulkhead Roof Plan 4/6/2007 A-20 I .--_. North and East Elevations 4/6/2007 A-202 South and West Elevations 4/6/2007 A-21O ----- Schematic Sections 4/6/2007 A-240 ----- Stair Sections 4/6/2007 A-241 ----- Core Plans 4/612007 A-242 ---- Core Plans 4/6/2007 A-243 Core Details 4/6/2007 A.-300 .--- Wall Partition 4/612007 A-30t Partition Details 4/6/2007 A-302 ---- Door 4/6/2007 A-3J 0 ----- Window Schedule 4/6/2007 A-311 ----- Glazin1!. Tvoe5 - North and East Elevations 5/1612007 A-312 ---- - South and West Elevations 511612007 10(8 G00051845 Section 2 - List of Documents Crosby Street Hotel Contract No.: 794-00000-000 Date: July 31, 2007 A-320 ----- Elevations 5/16/2007 A-321 ---- Elevations 4/612007 A-322 ----- Enlarged Elevations 4/6/2007 A-330 ---. Favade Details 5/1612007 A-331 --- Favade Details 4/6/2007 A-332 ---- Favade Details 4/612007 A-400 ---- Kitchen Plans & Elevations 4/612007 A-401 ---- Kitchen Plans & Elevations 4/6/2007 A-402 Kitchen Details & Schedule 4/6/2007 A-SOl ---- Bathroom Plans & Elevations 4/6/2007 A-502 --- Bathroom Plans & Elevations 4/612007 A-503 ---- Bathroom Plans & Elevations 4/6/2007 A-504 ---- Bathroom Plans & Elevations 4/612007 A-601 ---- RCP Cellar Floor Plan 4/6/2007 A-601M -.-- RCP Cellar Mezzanine Floor Plan 4/612007 A-602 RCP 1st Floor Plan 4/6/2007 A-603 ----- Rep 2nd Floor Plan 4/6/2007 A-604 ----- RCP 3rd - 12th Floor Plan 4/6/2007 A-60S ---- Rep 13th - 17th Floor Plan 4/6/2007 A-606 ----- RCP 18th Floor Plan 4/6/2007 A-607 ----- RCP 19th - 22nd Floor Plan 4/6/2007 A-60S RCP 23rd Floor Plan 4/612007 A-609 ----- RCP 24th Floor Plan 4/612007 A-610 ---- RCP 25th Floor Plan 4/612007 A-611 ----- RCP 26th Floor Plan 4/6/2007 A·612 ----- RCP Boiler Room 4/612007 STRUCTURAL DRAWINGS (DESIMONE CONSULTING ENGINEERS) S-001 ----- General Notes Index 04/30/07 S-100 ----- Cellar Plan 04/30/07 S-1000 ---- Cellar Demo Plan 04/30/07 8-101 ----- First Floor Plan 04130107 S-l 0 J0 ----- First Floor Demo Plan 04/30/07 S-lD 1M ----- Mezzanine Floor Plan 04/30/07 S-102 Second Floor Plan 04/30107 S-102D ---- Second Floor Demo Plan 04/30/07 S-103 ----- 3rd12th Floor Plan 04/30/07 S-J 03D ----- 3ed - 13th Demolition Plan 04/30/07 S-113 ---- 13th Floor Plan 1 Roof 04/30/07 8-1I3D RoofOemoliUon Plan 04/30/07 8-114 ----. 14th· 23rd Floor Plan 04130107 8-124 ---- 24th Floor Plan 04130/07 8-125 --- 25th Floor Plan 04/30f07 5-126 ----Roof Plan I 26th Floor Plan 04/30{07 8-127 --- Mechanical Penthouse Plan I 27th Floor 04/30/07 8-128 Upper Mechanical Penthouse Plan 128th Floor 04130107 8-129 ---- Upper Bulkhead Roof Plan I 29th Floor 04/30/07 8-20 I ---- Column Schedule 04/30/07 S-202 ---- Elevations 04130/07 S·203 -'-- Mat Plan & Details 04130/07 Page 20f8 000051846 Section 2 List of Documents Street Hotel Contract No.: 794-00000-000 Date: July 31, 2007 S·204 Shear Wall Plans &Elevations 04/30/07 S-205 ----- Shear Wall Plans & Elevations 04/30/07 S-206 ---- Shear Wall Plans & Elevations 04/30/07 S-207 .-.-- Shear Wall Plans & Elevations 04/30/07 8-208 ._--- Shear Wall Plans & Elevations 04/30/07 8-209 -..-- Shear Wall Plans & Elevations 04/30/07 S.30 1 -.-.. Foundation Details 04/30/07 S-303 -.-.- Foundation Sections and Details 04/30/07 8-304 Foundation Seetions and Details 04130107 8-305 .---. Foundation Sections and Details 04/30/07 S·310 --... Concrete Sections and Details 04/30/07 S-311 .---­ CMU Sections and Details 04/30/07 S·3 J2 --... Concrete Sections and Details 04/30/07 8-313 Typical Masonry Sections and Details 04130107 8-40 I ·----Renovation Steel Sections and Details 04/30/07 8-402 --··~Renovation Steel Sections and Details 04/30/07 S-403 ----Renovation Steel Sections and Details 04/30/07 8-404 ·--Renovation Steel Sections and Details 04/30/07 S-4 J I --- Steel Sections & Details 04/30/07 8-412 Typical Steel Sections & Details 04130107 . S·413 --.,. Typical Steel Sections & Details 04/30/07 8-414 .---- New Steel Sections & Details 04/30/07 8-70 I --.-- Transit General Notes 04/30/07 8-702 ---- Building Sections 04/30/07 MECHANICAL DRAWINGS (AFK ENGINEERS) HVAC DRAWINGS M-OO 1---- HVAC Symbols Notes, List & Abbreviations 05/07/07 M-l 0 1---- HVAC Cellar - Mechanical Plan 05/07/07 M-I01M ---- HVAC Mezzanine Plan 05/07/07 M-102 ----- HVAC I st Floor - Mechanical Plan 05/07/07 M-I03 HVAC 2nd Floor - Mechanical Plan 05/07/07 M-104 ---- HVAC Third Twelfth Floor Plan 05107/07 M·105 ----. HVAC Thirteenth - Eighteenth Floor Plan 05/07/07 M-106 ----- HVAC Nineteenth - Twenty Third Plan 05/07/07 M-107 -._- HVAC Twenty Fourth Floor Plan 05/07/07 M-108 HVAC Twenty-Fifth Floor Plan 05/07/07 M-109 --... BVAC Twenty Sixth Floor Plan 05/07/07 M-IIO ----- HVAC Penthouse Mechanical Room Plan 05107/07 M-Ill ----- HVAC ElevatorMachine Room Plan 05/07/07 M-1l2 ----- HVAC Roof Plan 05/07/01 M-JOl -.-- HV AC Exhaust Riser 05/07/07 M-302 ----- HVAC Exhaust Riser 05/07/07 M-303 HVAC Exhaust Riser 05/07/07 M·304 .---- HVAC Water Riser Diagram 05/07/07 M·30S ---- HVAC Water Flow Diagram 05/07/07 M-400 ----- HVAC Details 05/07/07 M-4Ol ---- HVAC Details 05/07/07 M-402 --- HVAC Details 05/07f07 M-403 HVAC Details 05/07/07 Page 3 of8 G00051847 Sectioll2 - List of Documents Crosby Street Hotcl Contract No.: 794-00000-000 Date: July 31,2007 M-SOO ---- HV AC Schedules 05/07/07 M-50l HVAC Schedules 05/07/07 ELECTRICAL DRAWINGS E-OO 1---- Electrical List, Notes & Index 05/07/07 E-002----- Electrical Abbreviations, & Notes 05/07/07 E-l 01-..-- Electrical Cellar Lighting Plan 05/07/07 E-102----- Electrical Mezzanine Floor Plan 05/07/07 E-103 ---- Electrical Ground Floor 05/07/07 E-I04 ----- Electrical Second Floor 05/07/07 E-20 I --- Electrical Cellar Power Plan 05/07/07 E·202 ----- Electrical Cellar Mezzanine Floor Power Plan 05/07/07 E-203 ----- Electrical Ground Floor Power Plan 05/07/07 E-204 --- Electrical Second Floor Power Plan 05/07/07 E-300 --- Electrical 3rd - 12th Floor & Power Plan 05107/07 E-301 --•• - Electrical 13th - 17th Floor & Power Plan 05107/07 E-302 ---- Electrical Eighteenth & Power Plan 05/07/07 & Power Plan 05/07/07 E·304 .---- & Power Plan Electrical 23rd Floor Lighting 05107/07 &305 -----EleclTical24tb Floor Lighting Plan 05/07/07 &306 -----Electrical 25th FloOf & Power Plan 05107/07 E-307 & Power Plan Electrical 26th Floor Lighting 05/07J07 &308 -----Electrical Penthouse Mechanical Room Plan 05107/07 &309 Electrical Elevator Machine Room Plan 05107/07 E-310 ----Electrical Roof Plan 05/07/07 E-500 --- Electrical Power Riser Diagram Plan 05/07/07 E-50 I --- Electrical One Line Diagram 05/07/07 E-600 -.-.- Electrical Schedules Sheet I of 3 05107/07 E-60 I Electrical Schedules Sheet 2 of3 05107/07 E-602 Electrical Schedules Sheet 3 on 05/07/07 E-700 -.--- Electrical Details Sheet I of2 05/07107 E-70 1 -._-- Electrical Details Sheet 2 of 2 05/07/07 E-702 ---. Electrical Ligj}tniinl! Protection Details, Notes 05/07/07 FIRE ALARM DRAWINGS FA-lO! ---- Fire AlarmCellar Plan 05/07/07 FA-I02 .---- Fire Alarm Ground Floor Plan 05/07/07 FA-J 03 ----- Fire Alarm Second Floor Plan 05/07/07 FA-I04 ----- Fire Alarm Third - Twelveth Floor Plan 05/07/07 FA-105 ----- Fire Alarm Thirteenth - Floor Plan 05/07/07 FA-106 ----- Fire Alarm Nineteenth - . 05/07/07 FA-I 07 ----- Fire Alarm Twenty Fourth Floor Plan 05107107 FA-I 08 Fire Alarm Twenty Fifth Floor Plan 05/07/07 FA- 109 ----- Fire Alarm Twenty Sixth Floor Plan 05107/07 FA-I 10 ---- Fire Alarm Penthouse Mechanical Room 05/01107 FA-300 ---. Fire Alarm System Riser 05107/07 PLUMBING DRAWINGS P-OO I ----- Abbreviations & Notes 05107/01 P·lO I ---- Plumbing Cellar Cellar Plan 05/07/07 Page 4 ofS G00051848 Section 2 - List of Crosby Street Hotel Contract No.: 794..QOOOO-OOO Date: July 31, 2007 P-IOIM ---- Plumbing Mezzanine Plan 05/07/07 P-l02 --- Plumbing Ground Floor Plan 05/07/07 P-I03 ----­ 2nd Floor Plan 05/07/07 P-I04 ---­ 3rd - lOth Floor Plan 05/07/07 P-IOS 11th Floor Plan 05/07/07 P-106 ---- Plumbing 12th Floor Plan 05/07/07 P-107 ----- Plumbing 13th - 17th Floor Plan 05/07/07 P-108 ----- Plumbing 18th Floor Plan 05107107 P-I09 ----- Plumbinfl 19th - 23rd Floor Plan 05/07/07 P-IIO ----- 24th Floor Plan 05/07/07 P·lll Plumbing 25th Floor Plan 05/07/07 P·112 .--- Plumbing 26th Floor Plan 05/07/07 p.! 13 Plumbing Penthouse MER 05/07/07 P-114 --- Plumbing Elevator Machine Room 05/07/07 P-11S --- Roof Plan 05/07/07 P-200 ---- Plumbing Domestic Water & Gas Riser Diagram 05/07/07 P-201 Plumbing Sanitary Riser 05/07/07 P-202 --- Plumbing Stonn Riser D!allTanl 05/07/07 P-300--- Plumbing Details 0'5/07/07 P-30 1 ---- Plumbing Backflow lnstallation Details 05/07/07 FIRE PROTECTION DRAWINGS F-00 I ---- Fire Protection - Riser 05/07/07 F-lOO --- Fire Protection Cellar Plan 05107/07 F-I () I ---- Fire Protection Mezzanine Plan 05/07/07 F-102 ----- Fire Protection Ground Floor Plan 05/07/07 F-I03 ---- Fire Protection 2nd Floor Plan 05107/07 F-104 --- Fire Protection 3rd -12th Floor Plan 05107/07 F-105 ----- Fire Protection 13th -18th Floor Plan 05107/07 F-106 ._--- Fire Protection 19th -23rd Floor Plans 05107/07 F-I07 -..-- Fire Protection 24th Floor Plans 05107/07 F-I08 ---- Fire Protection 25th Floor Plan 05107/07 F-I09 ---- Fire Protection 26th Floor Plan 05107/07 F- I 10 ---.- Fire Protection Penthouse MER 05107/07 F-Ill Fire Protection Elevator Machine Room 05/07/07 F-300 ---- Fire Protection Details 05/07/07 EXISTING BUILDING SURVEY (FOG CITY A 1.1 ---- Existing Roof Plan 1/30/2007 A2.! ---- Basement Level Hoar Plan 1/30/2007 A2.1 --- Existine. First & Second Level Floor Plans lt30/2007 A2.2 ----­ First & Mezzanine Level Floor Plan 1/3012007 A2.3 ---- Second & Third Level Floor Plans 1/30/2007 A2A Existing Fourth & Fifth Level Floor Plans 1/3012007 A2.5 - - Existing Sixth & Seventh Level Floor Plans 113012007 A2.6 ---- Existing & Ninth Level Floor Plans 1/3012007 Tenth & Eleventh Level Floor Plans 1/3012007 Twelth & Value Room Floor Plans 1/3012007 A3.1 East Elevation 1/3012007 A3.2 ---- Existing West Elevation 113012007 A3.3 --- EKisting South Elevation 1/3012007 A3.4 ---- Existing North Elevation 113012007 5 ors G00051849 Section 2.- List of Documents Crosby Street Hotel Contract No.: 794-00000·000 Date: July 31, 2007 SPECIFICATIONS Section 01524 Construction Waste Management 05/01107 Section 01352 LEED Requirements 05/01/07 Section 01810Commissioning of Mechanicl, r,it;I;;U1C BROOMS, SHOVELS, ETC. 26 3,000 78,000 FINAL CElEANING SUPPLIES ALLOW 0 ----:.--­ 17370 TOTAL CLEANING SUPPLIES 78,000 H. CLEANING LABOR INCL ELSEWHER 17371 I. FINAL CLEANlNG NUMBER COST/ OF UNITS UNIT TOTAL ROOMS, 0 150 0 PUBuc/coMMON AREAS ALLOW 0 EXCLUDED 17375 J. PORCELAIN REPAIR (ALLOW) 5,000 --­ 17380 K. BREAKAGE & REPAIR (ALLOW) 0 ? L RUBBISH CHUTES (TRADE CONTRACTOR QUOTATION) 0 M. HOISTS (TEMP MAT'l & PERSONNEL) INCLUDES:. HOISJ INSTALLATION, JUMPS, RAMPS, RAILINGS, SCREENING, RENTAL CHARGES FOR LIFE OF INSTALLATION, AND REMOVAL & DISPOSAL 17300 TRADE CONTRACTOR QUOTE '" 0 17280 N. TOOLS & SUPPLIES (PURCHASED) (ALlOVll} 20,000 17230 O. EQUIPMENT PURCHASES (ALlOVll} 20,000 17235 P. EQUIPMENT .RENTALS/REPAIRS {ALLOVV) 20,000 G00051869 Q. GRAND TOTAL SITE SAFETY & MAINTENANCE 147,900 GENERAL ITEMS A TEMPORARY ELECTRIC POWER METER CHARGES GROSS FLOOR AREA == 141,514 COST/MONTH/GROSS SQUARE FOOT :::: $0.0350 NUMBER OF MONTHS FOR TEMPORARY:::: BY OWNER 17360 TOTAL TEMPORARY ELECTRIC POWER METER CHARGES EXCLUDED B. TEMPORARY WATER METER CHARGES GROSS FLOOR AREA '" 141,514 COST/MONTH/GROSS SQUARE FOOT:; $0.0008 NUMBER OF MONTHS FOR TEMPORARY;;; 8YOWNER 17350 TOTAL TEMPORARY WATER METER CHARGES EXCLUDED 17361 C. TEMPORARY GAS METER CHARGES (ALLOVV) o D. MOCKUPS &. SIGNAGE SITE SIGNAGE ALLOWANCE 3,000 MOCKUPS CONCRETE. (ALLOW) o ~.17390 TOTAL MOCKUPS & SIGNAGE 3,000 E. INTERIM ELEVATOR MAINTENANCE aUAN NUMBER COST TYPE -~~ ---_._---- --- LOW RISE ELEVATORS ElEV o MONTHS --.~ ..- o -- {MONTH 1,500 ---- ... -~- ------­ TOTAL o MID LOW RISE o o 1.500 o MID HIGH RISE ELEVATORS o 6 1,500 o HIGH RISE ELEVATORS o o 1,500 o CARS o o 1.500 o 17540 TOTAL INTERIM ELEVATOR MAINTENANCE INCl ELSEWHER F. ElEVATOR RESTORATION QUAN TYPE ELEV COST TOTAL LOW RISE ELEVATORS· o 1,500 o MID LOW RISE o 1,500 o MID HIGH RISE o 1,500 o HIGH RISE ELEVATORS o 1,500 o SERVICE CARS o 1,500 o 17540 TOTAL TEMPORARY ELEVATOR RESTORATION EXCLUDED G. TEMPORARY ELEVATOR MOTOR ROOM ENCLOSURES G00051870 UNiT QUAN COST TOTAL --- -~------ ------ TEMP PARrNS, POWER, UGHT, ETC. o 10,000 o REMOVAL & CLEANUP o o 17540 TOTAL TEMPORARY ELEVATOR MOTOR ROOM ENCLOSURES EXCLUDED 17450 H. CUTIING & PATCHING (ALLOW) o 17440 I. MISCELLANEOUS PUMPING (ALLOW) o 17435 J. ACCESS ROADS & MAINTENANCE (ALLOW) o K. WINTER WEATHER PROTECTION CONCRETE ALLOW o MASONRY ALLOW o PLASTERINGfTAPIN.GJPAINTING ALLOW o 17470 TOTAL WINTER WEATHER PROTECTION EXCLUDED L GRAND GENERAL ITEMS 3,000 8. BONDS A. PAYMENT & PERFORMANCE BOND IS BOND REQUIRED (Y or N) YorN INCl ELSEWHER B. SUBCONTRACTOR BONDS DOLLAR VALUE OF SUBCONTRACTORS TO BE BONDED o BOND RATE 2.00% TOTAL SUBCONTRACTOR BONDS PARTIAllY lNCL ELSEWHERE 17460 C. GRAND TOTAL BONDS o GRAND TOTAL ALL GENERAl CONDITIONS = :======:=:====::;= 000051871 Section 5 Allowances G00051872 Section 5 CROSBY July 31, 2007 ALLOWANCES The GMP contains certain Allowances determined by Owner I ".Y"rl!ll C> C> V> 00 00 -...J • Passenger Elevator Pc-2 Operational .­ Passenger 8Cv­ Men 4/13.'09 ConCfete on Meta! Deck 3wks Mon 5118/09 Imelior Frt-out (m;nimum wotk for TCO») 12_ Site'1lV(){k at Pfala Entrance 12 wks Mon &8109 Storefront/Canopy (Crosby St) 8w"-' Wed 718109 days 2<) Interior Design Coordinated CD's Issued o days Od8yS Progress M~estooo .. SlJmmaty .....---..,. Project Summart