arrow left
arrow right
  • Magic Valley Concrete, LLC d/b/a CAPA VS. MAR Designs and Construction,Mario RodriguezContract - Other Contract (OCA) document preview
  • Magic Valley Concrete, LLC d/b/a CAPA VS. MAR Designs and Construction,Mario RodriguezContract - Other Contract (OCA) document preview
						
                                

Preview

C-3737-1 9-E 10:11 AM RIO VALLEY PIPE, LLC 12I27118 Customer Open Balance Accrual Basis All Transactions Type Date Num Due Date Open Balance Amount M.A.R. DESIGNS & CONSTRUCTION SUNSET MEADOWS SUBDIVISION Invoice 11/01/201 7 16182 12/10/201 7 25.51 9.60 25,519.60 Invoice 11/07/201 7 16199 12/1 0/201 7 0.07 5,015.28 Invoice 11/09/201 7 1621 7 12/1 012017 1.770.80 1,770.80 Invoice 12/31/201 7 FC 4354 12/3112017 624.70 624.70 Invoice 01/03/2018 16432 01/10/2018 943.68 943.68 Invoice 01/31/2018 FC 4356 01/31/2018 1,044.71 1,044.71 Invoice 02/28/201 B FC 4360 02/28/201 8 61 3.65 61 3.65 Invoice 04/30/201 8 FC 4405 04/30/201 8 1,336.89 1,336.89 Invoice 05/31/201 8 FC 4409 05/31/201 8 518.16 51 8.16 Invoice 07/31/201 8 FC 4416 07/31/201 8 1,019.59 1,01 9.59 Invoice 09/30/201 8 FC 4422 09/30/201 8 1.019.59 1,01 9.59 Invoice 10/31/201 8 FC 4423 10/31/201 8 431 .64 431 .64 Total SUNSET MEADOWS SUBDIVISION 34,843.08 39,858.29 Total M.A.R. DESIGNS 8. CONSTRUCTION 34,843.08 39,858.29 TOTAL 34,843.08 39,858.29 +w,544.8a ”6F + 565% Z! p514 3 51,050.” Exhibit A Page 1