FILED: NEW YORK COUNTY CLERK 01/08/2019 05:56 PM INDEX NO. 150228/2017
NYSCEF DOC. NO. 133 RECEIVED NYSCEF: 01/08/2019
EXHIBIT
I
FILED: NEW YORK COUNTY CLERK 01/08/2019 05:56 PM INDEX NO. 150228/2017
NYSCEF DOC. NO. 133 RECEIVED NYSCEF: 01/08/2019
horntoit Tomasetti
Via email: focchipinti@somlaw.com
September 21, 2018
Mr. Frank S. Occhipinti,Esq.
Stewart Occhipinti, LLP
One Exchange Plaza
55 Broadway, Suite 1501
New York, NY 10006
SUBJECT: 266 & 270 West End Avenue, New York, NY
Sidewalk Shed Drawings review
TTPROJECTNUMBER: N17303
Dear Mr. Occhipinti:
Per your request, ThGrñt0ñ Tomesett! (TT) has rêviswsd sidewa!k shed drawings EQ-001.00 prepared by Plan
B Eñgiñêêriñg and dated Septembêr 14, 2018, related to the sidewalk in frontof 266 and 270 West End
set"
Avenue. These drawings are marked as "Permit & construction have been stamped and signed by John J.
McErlean, PE. Below are our comments:
1. We recommend that in the project block of the block
title the descriptien be changed to "266 West End
Avenue"
Avenue, New York, NY in relationto work being performed at 270 West End
2. We request a copy of the technicaldata sheets forthe specified Stros Hoist Mast.
3. The drawings do not accurate!y reprêsêñt the ornameniâi elements of the façade, and the gate and
stoop at the ground floor levelthat would be under the sidewe!k shed.
a. We request that a note be added to the drawings stating that care should be taken for the
deck and the framing not to touch the façade.
b. We request the note also require that an appi0priate gap be maintained batween the
deck/framing and the fagade, and that the gap be bridged by Styrcfcam that iscantilevered off
the deck.
¾"
4. We request clerificaticaon the thickness of the parapet plywood (the deck is called out to be
plywood).
5. We request a detail for the deck-to-parapet connection. The drawings show a metal corner bracket
and a diagonal brace; hewevêr, no infGirñaticñ on the ccññêcticñs (number, size, and configuration) is
provided.
6. We request clarificaticñregarding the need for a splicefor the W8 members betwêêñ the hoist masts
(see details 3 and 4).
7. We request the alarm and surveillance detailsrelated to access to the second floorfront windsws, and
other parts of the property at 266 West End Avenue.
8. We recommend that TT be present on site during shed installationto verifythat shed isbeing installad
per the submitted plans. We request that we be provided with reas0ñab|é notice priorto the startof
installation.
While our findings are summarized as of the date of issuance, should new information or additi0ña|
documéñtâ:isñ become availab|ê, we may amend or revise our opinions and requests acccidiñÿly.
51 Madison Avenue | New York NY 10010-1603|
T 917 661 7800|F917 661 7801 | www ThomtonTomosetncorn
FILED: NEW YORK COUNTY CLERK 01/08/2019 05:56 PM INDEX NO. 150228/2017
NYSCEF DOC. NO. 133 RECEIVED NYSCEF: 01/08/2019
The t tan Tomasetti
Mr. Frank Esq.
Occhipinti,
Stewart LLP
Occliipinti,
September 20, 2018 Page 2 of 2
Very trulyyours,
THORNTON TOMASETTl, INC.
Rahul Ratakonda, P.E.
Senior Associate
Mark Andrews, P.E.
Vice President
Document Filed Date
January 08, 2019
Case Filing Date
January 09, 2017
Category
Real Property - Other (Declaratory/Inj. Relief)
Status
Disposed-Court Date/Application Pending
For full print and download access, please subscribe at https://www.trellis.law/.