On June 08, 2020 a
Exhibit,Appendix
was filed
involving a dispute between
E.E. Cruz & Company, Inc.,
and
Starr Surplus Lines Insurance Company,
for Commercial - Insurance
in the District Court of New York County.
Preview
FILED: NEW YORK COUNTY CLERK 10/28/2022 05:53 PM INDEX NO. 652321/2020
NYSCEF DOC. NO. 82 RECEIVED NYSCEF: 10/28/2022
EXHIBIT 17
FILED: NEW YORK COUNTY CLERK 10/28/2022 05:53 PM INDEX NO. 652321/2020
NYSCEF DOC. NO. 82 RECEIVED NYSCEF: 10/28/2022
Jimmy"
From: "Maldonado,
Sent: Sat, 19 May 2018 15:28:34 -0400 (EDT)
Jay" Rob"
To: "Dier, ; "Richardson, ;
Kendra" Jeff"
"Edwards, ; "Maffei, Raymond
Javier"
; "Sevilla, ; "Fatigate,
Michael" Joe"
; "Sheehan, ; "Anerella,
Jeannine"
Subject: Two week snap shot 5-13-18
Attachments: Three Bridges 2 WEEK SNAPSHOT 5-13-18.pdf
All,
See attached.
Thanks,
Jimmy Maldonado, PE
Senior Project Manager
EE Cruz & Company, Inc.
32 Avenue of the Americas 13 Floor
New York, NY 10013
Cell908-566-2324
CONFIDENTIAL EECRUZ042875
FILED: NEW YORK COUNTY CLERK 10/28/2022 05:53 PM INDEX NO. 652321/2020
NYSCEF DOC. NO. 82 RECEIVED NYSCEF: 10/28/2022
Snapshot Report
2 Week
5/13/2018
Week Ending:
Project #125
3 Bridges
New York
Westchester County,
corracnms/ symmµµns #D900036
NYSDOTContract
Concrete Pour
739 Pier 1
39 P e Co c ete Po
- East 3rd St.
TemporaryBridge
St. 0 FirstAid
Encasement- East 3rd 2 Recordade OFirstAid
Ed Duct Bank 2 LTI 4 Recordable
Con WE TODATE
INCIDENTS: 2 LTi 24.39RIR
SAFETY JTD /
18.81LTI
JTO
MANHOURSJTD: RATE:
INCIDENT
123,743
MH-
LaborBudgel 46%
56,903 demonstrations
MHToDalea
Labor protection MEETINGS:
SAFETY
on trainingandtall
harness FORUPCOMING
TOPICS
tocus
with SPECIAL
tookplace RollbackChecklist
SatelyweekCOMPLETED:
Hamess training
TRAINING Protection PROGRESS:
IOOLBOXTALKFall SUBMITTAL
ACTIVITIES&
CONSTRUCTION
MAJOR 739.
withinPier1Bridge
columns
ggrfgis
W__,ot) C testson4 poured
SL
Periorm
7Shafts/Columns.
39.
1Bridge Street.
2limitsofPier onEast3rdHeadroom
location
River
SawMBH Stage
within
torall4shaftsAssemble tor719Pier2
cages
Rebar thefina(tie-in purposes.
sidelowards Dueto
concrete
pour
and and Vamon
Mount launching
tor
Bddge Sewer
County
rebarcages shafts. side Westchesler drainage
Instaff
719&739: Pier2anddrin3 pitsonthePelham oftheTemporary ofthe
installation
Drill
Rig 739Pier1to719
from d
1he b
uct tromthejacking
ank
assembly
Finished
Bridge). Continued
approaches. TrunkLine
ofSB
installation
Mobilize ofTemp Began
extending (South
uliiitywork, 1heHutchison
RiverParkway ofthelempbridge
thebackwaH RiverParkway.
Finished
underground
ConEd along
south andraised
pedestals Southbound 01theHutchison
Shoulder
3rdStreet: s heading
heeling
wall
flood teetand beadng
poured inthe
bridge
Driving
Finished 2additional
bridge
jacked south 1heexisting
towards
concems,
clearance heading
northend(MH13)
(inetrom1he
Replacement andapproaches.
abutments
ofBridge.
South
structures thetempbridge
adjusting
and
Bridge
oftheTemporary
theheight
- Raising
ForceAcetwork
onschedule.
effortprogressing
- Design
Design
inslati
required)
50'ofdriHing
shaftS(Additional
Ddited
Finish
ahead Side).
Twoweeklook (South
o1719Bridge
Rigto Pier1
DriH
719.MobHize
.B.ivE
SIL__M 3 Pier2bridge
-5,
shafts
ior
cebar andplaceconcre1e
cages Bridge.
Instatt Pier1 ShaftS719 3-4.
shafts
719&739: concrete 2.
739pier o1719pier1
rebar
place
cageand within
columns
on4 EA bridge
tormwork Abutment
Northem 719.Remediation
Pier2Sha11
of
installa1ion 739 shafts
an3
for bridge.
Begin tor
pileinstana1ion andpourconcrete frafficontotemporary
toswitch of
inandbegin
Mobliize 3shafts.installrebar NYSDOT
drill
foraGeeplance weH
as asstriping
the
ins1allation
HRP).Finish of
installation
Drainage
)nslati to719 2and
Pier 739& to
Submit tencing
and
Barrier of
crossingstreetContinue
739 1
Pier 2Bridge
Pier (nstall
Temp utility
(underground bndge.
DrillRigfrom
Mobilize of
tomography 2,4and5
Shans intofinalposition.
beadngwanchor the
gas/e(ectric
permanent of
south
East3rd
existing
the
senic of
Crosshole bridge tobegintie-ins
andinstattbridge.ConEd RiverParkway
ofNBHutchison
olihetemporary
tinalins1allation ontemporary
utilities roadwidening
Finish
Continue
Street: temporary
of
dolie-ins elevation).
at
line
3rd onsiteto
10mobilize (Cutastraight
Verizon southofthebridge
sheeling
floodwatt andapproaches.
permanent abutments
L
Trunkine run.
drainage thetempbhdge
adjusting
and
SB Bridge
oftheTemporary
theheight
- Raising
ForceAcetwork
effort.
withdesign
- Continue
Design
EECRUZ042876
CONFIDENTIAL
FILED: NEW YORK COUNTY CLERK 10/28/2022 05:53 PM INDEX NO. 652321/2020
NYSCEF DOC. NO. 82 RECEIVED
2 Week Snapshot NYSCEF:
Report 10/28/2022
3 Bridges Project #125
Week EndIng: 5/13/2018
CONTRACTO1i'S
| ENGINEERS
NYSDOTContract #D900036 Westchester County, New York
PRÇJEÇT^ÇHEDyLE
PROJECT
NTP: July11,2017 PROJECT
DURATION: 17.0 Months
StjBRTANTIAL
COMPLETION: December
27,2018 COMPLETED
DIJRATION 10.1 Months
%COMPLETETIME: 59.14%
%COMPLETEBILLINGR: 27.00%ThruMarch
31,2018
%COMPLETECOST: 25.00%
ITEASONFOR BEING BEHINDSCHEDrLE
East3rdSt.- Mount
Vernon
Sewer
Change
orderworkhasseverly
delayed
theprogress
oftheEast3rdStreet
Bridge.
Workhasbeencompleted
andweareprogressing
schedule.
SMRP- Drilled
Shalls/Caissons
onSMRP
havebeenunexpectedly
deeper
andhaveslowed
down/delayed
thestartofabulment/column
workandoverall
bridge
structure
progress
Act1ely.Budgeli.N
LF
forcost
code
374.00062
between
N30/Bt8
and05/13
2012 ... 700002 cavac /I.a Pip9
O
--+SwImiivedi$
----ma::.mrx e
--- Cumshe
AversWë
(A 12 G 112
ha
............................................................................
Aheal*
Sudge0.N
DB
f costade
4044262t "t r t mdoiUK a
between
S4 d)d 07£71 nrme theet PilesARD.....................
-- reemue :
- - Admaii.ia!Us
Cocoh&e
Avemge
.
CONFIDENTIAL EECRUZ042877
Document Filed Date
October 28, 2022
Case Filing Date
June 08, 2020
Category
Commercial - Insurance
For full print and download access, please subscribe at https://www.trellis.law/.