arrow left
arrow right
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
  • SYNERGY CONTRACTING GROUP INC Vs. SAFEPOINT INSURANCE COMPANY CONTRACTS AND INDEBTEDNESS - CIRCUIT document preview
						
                                

Preview

Case Number:19-000035-CI Filing # 82685576 E-Filed 12/31/2018 11:07:29 AM Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 Insured: Teresa Gunter Home: (727) 784-2146 Property: 115 Steeplechase Ln Palm Harbor, FL 34684 Claim Number: 16087 Policy Number: SPIH036581 1-03-0000 Type 0f Loss: Water Damage Date of Loss: Date Received: Date Inspected: Date Entered: 9/5/2017 Price List: FLSP8X_AUG17_ Restoration/Service/Remodel Estimate: GUNTER_T_BB The following contains a copy of our estimate of repairs. This estimate is presented utilizing the Xactimate Estimating System customized to reflect the specific scope of work presented in the loss. The most recent price list for your area was used for some or all of the unit costs. This estimator also may have relied on the use of written or verbal quotes from a sub contract labor or suppliers who were deemed capable of completing their respective scope of Work/Estimate are valid only when accompanied by a properly executed Change Order. 1. This estimate contains no allowances for the review of ordinance & law 2. Incurred costs remain open Our opinion damage assumes a specific scope and methodology of repairs. This opinion is based on our as to the building IICRC S-500/520 ANSI approved standards. extensive industry experience, industry standards, and in reference to the Any deviation in scope,methods or conditions, may have reciprocal affect on this opinion. If this should occur, we reserve the right to review such changes and modify our opinion accordingly. ***ELECTRONICALLY FILED 12/31/2018 11:07:27 AM: KEN BURKE, CLERK OF THE CIRCUIT COURT, PINELLAS COUNTY*** Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 GUNTER_T_BB Main Level Main Level DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1. Plumbing (Bid Item) 1.00 EA 0.00 0.00 0.00 0.00 0.00 2. & fees Taxes, insurance, permits 1.00 EA 0.00 1,332.61 0.00 266.52 1,599.13 (Bid Item) 3. General Laborer- per hour 10.00 HR 0.00 35.30 0.00 70.60 423.60 4. dump truck Single axle - per load- 1.00 EA 208.85 0.00 0.00 41.78 250.63 includingdump fees 5. Open and plumbing close slab for 1.00 EA 0.00 1,192.02 3.31 239.06 1,434.39 work 6. Neg. air fan/Air scrub.-Large (per 14.00 DA 0.00 128.08 0.00 358.62 2,151.74 24 hI period)-N0 monit. Air Scrubber chargefor reconstruction - Airpurifiers t0 comply with OSHA 1926.55(a & b) t0 avoid inhalation, ingestion, skin absorption, 0r contact with any material 0r any contaminants at construction site. In this case 1 unitfor 10 days. 7. Administrative/supervisor labor 10.00 HR 0.00 80.00 0.00 160.00 960.00 charge (Bid Item) 8. Residential Supervision /Project 41.00 HR 0.00 59.89 0.00 491.10 2,946.59 Management - per hour 9. Fee t0 detect underslab leak 1.00 EA 0.00 3 19.20 0.00 63.84 383.04 10. Asbestos - test feefull service 1.00 EA 0.00 550.00 0.00 110.00 660.00 asbestos survey 11. Provide box& tape -large size 10.00 EA 0.00 3.70 0.89 7.40 45.29 12. Provide box& tape -medium size 15.00 EA 0.00 2.87 1.03 8.62 52.70 13. Provide wardrobe box & tape- 1.00 EA 0.00 15.30 0.37 3.06 18.73 large size 14. Bubble Wrap -Add—on cost for 50.00 LF 0.00 0.19 0.67 2.04 12.21 fiagile items 15. Provide fumiture lightweight 15.00 EA 0.00 5.60 5.84 17.96 107.80 blanket/pad 16. Provide stretch film/WIap 1.00 RL 0.00 14.99 1.05 3.22 19.26 17. Content pack out and Inventory - 16.00 HR 0.00 28.10 0.00 89.92 539.52 per hour 2 men for hour day. 1- 8 18. Content pack in and Inventory - 12.00 HR 0.00 28.10 0.00 67.44 404.64 per hour 2 men for 1-6 hour day. 19. Contents Evaluation and/or 6.00 HR 0.00 43.33 0.00 52.00 3 11.98 Supervisor/Admin - per hour 20. Contents Cleaning Technician-per 8.00 HR 0.00 25.28 0.00 40.44 242.68 hour Clean contents prior t0 being packed back into home. clients Total:Main Level 13.16 2,093.62 12,563.93 GUNTER_T_BB 12/ 1 2/20 1 8 Page: 2 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 :—5' Bathroom Height: 8' l‘bs'mweflznl‘ 267.90 SF Walls 53.50 SF Ceiling 2 EMMY _ ,, 321.40 SF Walls & Ceiling 53.50 SF Floor ' a 32) -|y1 v 5.94 SY Flooring 33.49 LF Floor Perimeter ‘1 . 7~1on 33.49 LF Ceil. Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 21. R&R 1/2“ drywall - hung, taped, 133.95 SF 0.38 2.89 4.31 88.46 530.79 With smooth wall finish 22. Seal part 0fthe walls W/latex based 174. 18SF 0.00 0.58 0.73 20.34 122.09 - stain blocker one coat 23. Prep wall for wallpaper 174. 18SF 0.00 0.57 0.00 19.86 119. 14 24. R&R Wallpaper 174.18 SF 0.84 2.39 12.56 115.04 690.20 25. R&R Wallpaper border 33.49 LF 0.72 2.69 2.91 23.42 140.53 26. Interior door -Detach & reset 1.00 EA 0.00 64.55 0.06 12.94 77.55 27. Window opening Paint door 0r -2 2.00 EA 0.00 30.32 0.53 12.22 73.39 coats (per side) 28. Paint door slab only -2 coats (per 2.00 EA 0.00 36.06 0.89 14.60 87.61 side) 29. R&R Baseboard - 3 1/4“ 22.49 LF 0.41 2.79 1.73 14.74 88.44 30. Paint baseboard-two coats 22.49 LF 0.00 1.40 0.17 6.34 38.00 31. Medicine cabinet-Detach & reset 1.00 EA 0.00 40.33 0.00 8.06 48.39 32. Towel bar - Detach& reset 1.00 EA 0.00 12.71 0.00 2.54 15.25 33. - Toilet paper holderDetach & 1.00 EA 0.00 14.43 0.00 2.88 17.31 reset 34. Toilet-Detach & reset 1.00 EA 0.00 285.00 0.34 57.06 342.40 35. Bathroom mirror -Detach & reset 6.00 SF 0.00 6.98 0.00 8.38 50.26 36. Detach & Reset Light fixture 1.00 EA 46.87 0.00 0.00 0.00 9.38 56.25 37. Shower curtain rod-Detach & 1.00 EA 0.00 12.07 0.00 2.42 14.49 reset R&R Tile tub surround -60 t075 1.00 EA 136.20 1,102.39 30.06 253.74 1,522.39 g? R&R Ceramic tile -bullnose- 2“x 22.67 LF 1.90 9.33 7.38 52.40 314.36 2?. 40. Tub/shower faucet- Detach & 1.00 EA 0.00 219.82 0.00 43.96 263.78 reset 41. R&R Tile -towel bar 1.00 EA 4.56 30.42 0.89 7.18 43.05 42. Clean floor - tile 53.50 SF 0.00 0.46 0.19 4.96 29.76 43. Grout sealer 53.50 SF 0.00 0.96 0.60 10.40 62.36 44. - Final cleaning - construction 53.50 SF 0.00 0.22 0.00 2.36 14.13 Residential GUNTER_T_BB 12/ 1 2/20 1 8 Page: 3 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 CONTINUED - Bathroom DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Totals:Bathroom 63.35 793.68 4,761.92 Living Room Height: Peaked 798.24 SF Walls 308.81 SF Ceiling 1,107.05 SF Walls & Ceiling 300.68 SF Floor 33.41 SY Flooring 74.08 LF Floor Perimeter 75.72 LF Ceil. Perimeter Missing Wall 3' 11" X 8' Opens into HALLWAY_2 Missing Wall 3' 4" X 8' Opens into HALLWAY_l DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 45. - Final cleaning - construction 300.68 SF 0.00 0.22 0.00 13.24 79.39 Residential Totals:Living Room 0.00 13.24 79.39 Hallway 2 Height: 8' 87.33 SF Walls 13.14 SF Ceiling 100.47 SF Walls & Ceiling 13.14 SF Floor 1.46 SY Flooring 10.92 LF Floor Perimeter 10.92 LF Ceil. Perimeter 3' 7" X8' Opens into LIVING_ROOM Subroom: Closet Height: 8' (1) 69.33 SF Walls 3.33 SF Ceiling 72.67 SF Walls & Ceiling 3.33 SF Floor Bath ter 0.37 SY Flooring 8.67 LF Floor Perimeter v 3v8n 8.67 LF Ceil. Perimeter Shower (B 1) DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 46. - Final cleaning - construction 16.47 SF 0.00 0.22 0.00 0.72 4.34 Residential Totals:Hallway 2 0.00 0.72 4.34 GUNTER_T_BB 12/ 1 2/20 1 8 Page: 4 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 "5' 1°"—'_6'_'“" Master Bedroom Height: 8' 402.57 SF Walls 157.43 SF Ceiling 560.00 SF Walls & Ceiling 157.43 SF Floor 17.49 SY Flooring 50.32 LF Floor Perimeter 50.32 LF Ceil. Perimeter Subroom: Closet Height: 8' (1) =IVV".7.' 181.23 SF Walls 31.63 SF Ceiling I 5° 212.86 SF Walls & Ceiling 3 1.63 SF Floor Closet (1)? ‘ M 3.51 SY Flooring 22.65 LF Floor Perimeter l 5' er 22.65 LF Ceil. Perimeter Showerl (B I'lsb/ DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 47. R&R 1/2“ drywall - hung, taped, 100.67 SF 0.38 2.89 3.24 66.48 398.91 With smooth wall finish 25,2*4 48. Texture drywall-lighthand 201.33 SF 0.00 0.57 0.70 23.10 138.56 texture 25,2*8 49. Seal the surface area W/latex based 201.33 SF 0.00 0.58 0.85 23.54 141.16 - stain blocker one coat 50. Mask and prep - for paintplastic, 72.98 LF 0.00 1.33 1.12 19.64 117.82 paper, tape (per LF) 51. - Paint the wallstwo coats 583.80 SF 0.00 0.93 7.76 110.14 660.83 52. R&R Baseboard - 3 1/4“ 72.98 LF 0.41 2.79 5.62 47.82 286.97 53. Paint baseboard-two coats 72.98 LF 0.00 1.40 0.56 20.56 123.29 54. door Interior -Detach & reset 1.00 EA 0.00 64.55 0.06 12.94 77.55 55. Paint door slab only -2 coats (per 2.00 EA 0.00 36.06 0.89 14.60 87.61 side) 56. Bifold door- - (2 slabs only) 1.00 EA 0.00 17.16 0.00 3.44 20.60 Single- Detach & reset 57. door Paint full lvrd bifold set-slab 2.00 EA 0.00 77.29 1.73 31.26 187.57 -2 coats -per side 58. Window opening Paint door 0r -2 4.00 EA 0.00 30.32 1.07 24.48 146.83 coats (per side) 59. - Outlet 0r switchDetach & reset 2.00 EA 0.00 16.81 0.00 6.72 40.34 60. Shelving - - Wire (Vinyl coated) 22.17 LF 0.00 7.64 0.00 33.88 203.26 Detach & reset 61. Window blind -horizontal 0r 1.00 EA 0.00 25.83 0.00 5.16 30.99 - vertical Detach & reset GUNTER_T_BB 12/ 1 2/20 1 8 Page: 5 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 CONTINUED - Master Bedroom DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 62. Window drapery - hardware - 1.00 EA 0.00 25.83 0.00 5.16 30.99 Detach & reset 63. Remove Carpet 189.06 SF 0.25 0.00 0.00 9.46 56.73 64. Carpet 217.41 SF 0.00 3.23 35.76 147.60 885.59 15 % waste added for Carpet. 65. R&R Carpet pad 189.06 SF 0.10 0.58 5.96 26.92 161.44 66. - Final cleaning - construction 189.06 SF 0.00 0.22 0.00 8.32 49.91 Residential Totals:Master Bedroom 65.32 641.22 3,846.95 Master Bath Height: 8' 324.00 SF Walls 64.32 SF Ceiling 388.32 SF Walls & Ceiling 64.32 SF Floor 7.15 SY Flooring 40.50 LF Floor Perimeter 40.50 LF Ceil. Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 67. R&R 1/2“ drywall - hung, taped, 162.00 SF 0.38 2.89 5.22 107.00 641.96 With smooth wall finish 68. Seal part 0fthe walls W/latex based 230.28 SF 0.00 0.58 0.97 26.92 161.45 - stain blocker one coat 69. R&R Wallpaper 230.28 SF 0.84 2.39 16.60 152.08 912.49 70. R&R Wallpaper border 40.50 LF 0.72 2.69 3.52 28.34 169.97 71. Interior door -Detach & reset- 1.00 EA 0.00 17.49 0.00 3.50 20.99 slab only 72. Window opening Paint door 0r -2 2.00 EA 0.00 30.32 0.53 12.22 73.39 coats (per side) 73. Paint door slab only -2 coats (per 2.00 EA 0.00 36.06 0.89 14.60 87.61 side) 74. R&R Baseboard - 3 1/ “ 29.50 LF 0.41 2.79 2.27 19.34 116.02 75. Paint baseboard-two coats 29.50 LF 0.00 1.40 0.23 8.30 49.83 76. Medicine cabinet-Detach & reset 1.00 EA 0.00 40.33 0.00 8.06 48.39 77. Towel bar - Detach& reset 1.00 EA 0.00 12.71 0.00 2.54 15.25 78. - Toilet paper holderDetach & 1.00 EA 0.00 14.43 0.00 2.88 17.31 reset 79. Toilet-Detach & reset 1.00 EA 0.00 255.96 0.34 51.26 307.56 80. - Outlet 0r switchDetach & reset 2.00 EA 0.00 16.81 0.00 6.72 40.34 GUNTER_T_BB 12/ 1 2/20 1 8 Page: 6 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 CONTINUED - Master Bath DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 81. R&R Vanity 8.75 LF 7.35 141.48 60.03 272.46 1,634.75 82. Sink -single-Detach & reset 1.00 EA 0.00 157.56 0.00 31.52 189.08 83. R&R Countertop -flat laid plastic 8.75 LF 3.92 59.00 15.93 113.30 679.78 laminate 84. R&R 4" backsplash for flat laid 14.50 LF 0.82 11.00 5.10 35.30 211.79 countertop 85. R&R Angle stop valve 3.00 EA 4.56 36.67 1.51 25.04 150.24 86. R&R P-trap assembly - ABS 1.00 EA 6.82 64.01 0.42 14.24 85.49 (plastic) 87. Detach & Reset Light fixture 1.00 EA 46.87 0.00 0.00 0.00 9.38 56.25 88. Mirror - - plate glassDetach & 21.88 SF 0.00 4.65 0.00 20.34 122.08 reset 89. Clean floor - tile 64.32 SF 0.00 0.46 0.23 5.96 35.78 90. Grout sealer 64.32 SF 0.00 0.96 0.72 12.50 74.97 91. - Final cleaning - construction 64.32 SF 0.00 0.22 0.00 2.84 16.99 Residential Totals:Master Bath 114.51 986.64 5,919.76 Total:Main Level 256.34 4,529.12 27,176.29 Labor Minimums Applied DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 92. Tilefloor covering labor minimum 1.00 EA 0.00 91.69 0.00 18.34 110.03 93. minimum Finish hardware labor 1.00 EA 0.00 47.80 0.00 9.56 57.36 94. minimum Electrical labor 1.00 EA 0.00 68.79 0.00 13.76 82.55 95. minimum Floor cleaning labor 1.00 EA 0.00 52.25 0.00 10.46 62.71 96. MiIIOI/shower door labor 1.00 EA 0.00 14.63 0.00 2.92 17.55 minimum 97. Toilet& bath accessory labor 1.00 EA 0.00 67.83 0.00 13.56 81.39 minimum 98. Window treatment repair 1.00 EA 0.00 59.09 0.00 11.82 70.91 99. minimum Finish hardware labor 1.00 EA 0.00 105.18 0.00 21.04 126.22 Totals:Labor Minimums Applied 0.00 101.46 608.72 Line Item Totals:GUNTER_T_BB 256.34 4,630.58 27,785.01 GUNTER_T_BB 12/ 1 2/20 1 8 Page: 7 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC1524562 Grand Total Areas: 4,036.09 SF Walls 1,238.38 SF Ceiling 5,274.47 SF Walls and Ceiling 1,225.30 SF Floor 136. 14 SY Flooring 463.69 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 466.46 LF Ceil. Perimeter 1,225.30 Floor Area 1,339.20 Total Area 4,036.09 Interior Wall Area 2,036.83 Exterior Wall Area 212.39 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 TotalHip Length GUNTER_T_BB 12/ 1 2/20 1 8 Page: 8 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 Summary for Dwelling Line Item Total 22,898.09 Material Sales Tax 254.05 Subtotal 23,152.14 Overhead 2,3 1 5 .29 Profit 2,315.29 Laundering Tax 2.29 Replacement Cost Value $27,785.01 Net Claim $27,785.01 GUNTER_T_BB 12/ 1 2/20 1 8 Page: 9 Synergy Contracting Group 15395 Roosevelt Blvd. Suite E Clearwater, FL 33760 Lic#CGC 1 524562 Recap by Category O&P Items Total % CABINETRY 1,994.36 7.18% CONT: GARMENT & SOFT GOODS CLN 95.35 0.34% CONT: CLEAN - GENERAL ITEMS 202.24 0.73% CLEANING 243.73 0.88% CONT: PACKING,HANDLNG,STORAGE 1,155.27 4.16% GENERAL DEMOLITION 1,184.83 4.26% DOORS 163.75 0.59% DRYWALL 1,261.00 4.54% ELECTRICAL 136.03 0.49% FLOOR COVERING - CARPET 811.88 2.92% FLOOR COVERING - CERAMIC TILE 204.80 0.74% PERMITS AND FEES 1,882.61 6.78% FINISH CARPENTRY / TRIMWORK 518.05 1.86% FINISH HARDWARE 219.33 0.79% LABOR ONLY 3,608.49 12.99% LIGHT FIXTURES 93.74 0.34% MIRRORS & SHOWER DOORS 116.37 0.42% PLUMBING 2,603.58 9.37% PAINTING 1,779.80 6.41% TOILET & BATH ACCESSORIES 109.71 0.39% TILE 1,344.32 4.84% WINDOW TREATNIENT 110.75 0.40% WALLPAPER 1,264.98 4.55% WATER EXTRACTION & RENIEDIATION 1,793.12 6.45% O&P Items Subtotal 22,898.09 82.41% Material Sales Tax 254.05 0.91% Overhead 2,315.29 8.33% Profit 2,315.29 8.33% Laundering Tax 2.29 0.01% Total 27,785.01 100.00% GUNTER_T_BB 12/ 1 2/20 1 8 Page: 10