On January 05, 2023 a
Exhibit,Appendix
was filed
involving a dispute between
Dan Albasry
As Trustee Of The Estate Of Newal Al Saad,
Firas Mohammad,
and
Barretts Minerals Inc.,
Beacon Cmp Corp.,
Brenntag Specialties Llc,
Charles B. Chrystal Company Inc.;,
Colgate Palmolive Co.;,
Conopco Inc.,
Glaxosmithkline Consumer Healthcare Holdings,
Glaxosmithkline Llc,
Gsk Consumer Health Inc.,
Lornamead Inc.,
Pfizer Inc.,
Port Jervis Laboratories Inc.,
The Procter & Gamble Co.,
Whittaker, Clark & Daniels Inc.,
Yardley Of London Inc.,
Yardley Of London Ltd.,,
for Torts - Asbestos
in the District Court of New York County.
Preview
iD: YORK OUN PK DM INDEX NO. 190002/2023
0:
NYSCEF BOC. NO. 92 RECEIVED NYSCEF: 07/10/2023
EXHIBIT 7
= YORK kK DIV INDEX NO. 190002/2023
OUN 0:
NYSCEF DOC - NO. 92 RECEIVED NYSCEF: 07/10/2023
Wonca stoi yan
“sapy PRODUCTS COMPANY wae
PROCESS si
Wuester
IFICATION ~ RESTRICTED__ 1 of NE
TPECIFICATION NOW
MANUFACTURE OF GOHNSON'S BABY POWDER AT XOLMAR 1087"
Omlemac sue OTT pareciesove owasuc® ThaCEAsaa Ow TaCation
7/2380 Baby Por: y Formula # t ckey Scales
REVISION DATE DESCRIPTION OF CHANGE AUTHORIZATH e
7/22/80 New process spac ation BCR 00:
Fak
a
Re TaEy. WF Srseer entice 79°
—. ___
48.J-004061 3
Protected Document--Subject to Protective Order JNJ 000298185
D: YORK kK DIV INDEX NO. 190002/2023
OUN 0:
NYSCEF DOC. NO. 92 RECEIVED NYSCEF: 07/10/2023
Yr eae: oo se
St TERY
foamsen, vnAON
SABY PRODUCTS COMPANY
PROCESS SPECIFICATION
fUeseer Wier Pee. Noe
MANUFACTURE OF SOF ats SAS
BAS Tt XGLMAR 108;
SESCRIFTION / SATING cay
ECU ENTS ORECEDURES
This rrocess soect# at to be us in Biending the raw materiais fer JOKNSON'
3a Powder Formule # oimer S., Port Jervis, % York.
|» RM fede Spec. No.
to.
tinssor Fale 712-003-4 8-G05
Par 1, Synfleur 732-238 4 $-012
RY SYS
v_Sys ten
ar load
bo} ter
te
exidie inc 6 product)
Tate 0 (60,599
e) Silo bin vent ?27
*) Aeration pads
$) feration blower wit ir ter (15 HP)
n) Rotary valve type i614 2,000 1bs./hr.)
i) Fulier Kenyon pumo (29
3) Tale supply blower 0
k) HEPA filter for suppiy biower
i) Sight glass ‘rom FXP
nm) High and low level sensors for silo
n) Aluminum piping for transfer of tale
Blending o/s
Pending System
ecm
a) Pre-blend talc weich bin on load cells
») eration pads
c} -blender (2 HP) wit ntensifier bar
a) Talc weigh bin on load cells
e) Aeration pads
¥) Ribbon blender, 00 Ibs (20 HP)
g) Product surge bin (10,000 Ibs.)
h} Aeration pads
iy notary valy. tyze 1410 10 rom; 17,000 1bs./hr.)
3) Rotex sifter with 4 40 mesn screens
k) Filler surge bin with High and tow leve? sensors
1) Dust collector
QUANTITATIVE FORMULA
Raw Material w/w
Taic 99.78
Perfume 0.2
100.0
00
one Iie te we OTT bd Baby PRODUCTSCO. 1877
7
J&J-0040614
Protected Document--Subject to Protective
Order
JNJ 000298186
D: YORK OUN NK DM INDEX NO. 190002/2023
0:
NYSCEF | DOC. NO. 92 RECEIVED NYSCEF: 07/10/2023
as eee ee SEES rar
Tepe di Tecan Say
Gofuon aflotunen
yao PRODUCTS COMPANY
PROCESS SPECIFICATION oe
aubseer pace
MANUFACTURE OF GOHNSON'S 2ABY PCADER AT KOLYAR O87 AN
5. OPERA sayTin PROCE URE ent ES]rl
A col
Unloading cf Trailers Pyi
Step 1 Obtain copy o ertificate cf enaiysis.
Step Check seals for i egri ty Soot
Step 3. Pull enaiytical samale for calor end moisture from top hatch.
Sten Full micrebi2i retain sampic from top hatch.
Ht S@pe.. techniques ust be used
Step If color and isoisture samoves ere acceptable and of A is in hand,
accept ctraiver.
Step é Uneap both the air ine end the plant air discharge line and wipe with ray
70: 3 IPA using stertie gauze
Step 7. Connect the air jine to the plant air discharge line and to the ies
Eruch air inlet ine Fea
NOTE: Truck air iniet iine must also be wiped with 70% IPA using
sterile gauze
Step 8. Uncap the product line and the plant product receiving line and wipe
both with 703 1?A and sterile gauze.
Me
Step Connect the product line ty the plant product receiving line and
also to the product discharce line of the truck.
HOTE: Wipe truck product dischage line with 70% IPA and sterile gauze
Step ic ‘pen the eir inlet valve low cone air valves and product valve.
i
Step nv Turn on blower to pump tale into silo. Movement of talc will be
verified by use of sight glass.
ss
Step 12 When unloading is complete, close all valves and disconnect unloading sits
lines. Wipe all caps and connections with 70% IPA and sterile gauze EEE
before closing caps. Store hoses with caps in place until next urloadint
Primary Slending
Blending at Kolmar will utilize a pre-blend type of batching. A 600 Ib. pre-blend
of tale and perfume will be made and blended in a V-type blender. After blending
it will be added to 3,000 Ibs. of talc in a ribbon blender to make the desired
batch size and achieve the proper finished goods perfume content.
Foun Tare We ARV. 77 7 BABY PRODUCTS CG. B77
wea “eat
ss
_
ae
J&J-0040615
Protected Document--Subject to Protective Order JNJ 000298187
D: YORK kK DIV INDEX NO. 190002/2023
OUN 0:
NYSCEF boc. NO. 92 RECEIVED NYSCEF: 07/10/2023
eeFe
Ae
ES EES
foticn alofaren
BABY PRODUCTS COMPANY
PROCESS SPECIFICATION
svesecr: = once arec
J MANUFA CTURE OF JOHNSCH'S SABY FONIER AT KOLMAR 4
Step 7 Charge the pre-blend weigh bin with 600 Ibs of talc
Step 2 Charge the volumetric perfewe tank with perfume
Step After pre-blend igh bin is full, charge tale weight bin with
3,090 Ibs of talc
Step impty taic from pre-blend weigh bin into the V-blender:
Step when pre-blend «eich bin is empty, close Y-blender loading port
and ture on Y-blender
Step hen V-blender is started, add perfume thru intensifier bar
>
Step ‘ren perfume is oroughly mixed with talc, stop Y-blender.
Step Zegin Gischarcing both the talc and the pre-blend tale into the
ribbon biender and begin mixing
Step Blené until perfume is thoroughly dispersed throughout the 3,600 Ibs.
of talc
Step 10 After mixing is complete, take a perfume content sample and deliver
to lab.
Step n Discharge baby powder from ribbon blender into product surge bin
Step 12 Baby powder will be heid in surge bin until a demand signal is
received from the iliing line
Step 13 the filler surge hopper will generate a demand signal for baby
powder to the product surge bin. When the signal is received the
product surge bin will begin to deliver product.
Step 4 Powder will discharge from product surge bin into a rotex sifter and
then to the filler surge hopper.
Step 1S when filler surge hopper is full, powder flow will stop unti? next
demand signal
6 FINISHING LINE
A. Equiprent
a) Pneumatic scale enliner
b) Pneumatic scale 816-filler
¢) Score 2000 checkweigher
d) Cap and sifter sorters
e) Pneumatic scale cap and sifter capper
Fonm vers vt BEV. O17 Gris DADY PRODUCTS EO, 1977
a a
J&J-0040616
Protected Document--Subject to Protective
Order
JNJ 000298188
= YORK kK DIV INDEX NO. 190002/2023
OUN 0:
NYSCEF DOC. NO. 92 RECEIVED NYSCEF: 07/10/2023
“? awa. eee
a nase ee 75
eae cromy
Tan
ney
a
ass
Ui VOOR afeiunen
BABY PRODUCTS COMPANY
PROCESS SPECIFICATION
Pusvectr Pre rec. Nor
MANUFACTURE OF JOKNSON'S 3.38Y OE. RAT XOLMAR 108;
f) Bottom cate coder
Semi- ut c gc rr ;load
aed: or
a) ‘acking s< on
i) ase Ss: er cw ot ie cat
¥) Dust cailecti on uipment
8. Seneral Flow Sotties rough aishina Line
Step 1. The botties -r2 received from stcrage and emptied on to the enliner. on
Step a. The entin: suap the conveyor <9 the filler with bottles.
Step Botties era filled in the 316-filler end discharged cn to 2 conveyor.
Step The bottles then cass over the iccre 2000 checkweigher.
AIT light ts x i be rejected on to @ rejection table.
Step &. Bott tes cneckweigner will continue down the line
where 2 esi il] de secured to the bottle.
4 the
Step 6. After capping, the hotties will be bottom date coded.
Step 7. From the bottom coce dater, bottles will then be split into two
rows end fed into tne semi-automatic packer.
Step 8. Filled packers will continue down a conveyor, placed in a shipper
and then th rough @ case sealer. The outside of the shipper is then
date coaed.
Step 9. Upon leaving the sealer, the case is palletized.
c. On-Line Salvage of Cepsed or tincapped Low Fill Neight Containers
Procedure
Step 1. Remove cap (if necessary) from container to be filled and from the
container that will serve as the source of powder.
Step 2. Pour powder form one container to the other in such a manner as
to fill into the neck of the bottle end minimize spillage.
Step 3. After the bottle has been filled, at or over the label weight,
add a new sifter and cap.
Safequards
Step 1. Al] personnel performing the powder addition shall wear clean gloves” i
and head covering. Care must be taken not to touch the powder being ie
poured or the inside of the container receiving the powder.
Pomme 7ia7 3 REV: O97 "aed BABY PRODUCTE CO. 1977
a — an
i
a
J&J-0040617
Protected Document--Subject to Protective Order
JNJ 000298189
= YORK kK DIV INDEX NO. 190002/2023
OUN 0:
NYSCEF DOC. NO. 92 RECEIVED NYSCEF: 07/10/2023
te Ee:
Naa al ca
pa! Hi
(ofemonfftanen
fy! BABY PRODUCTS COMPANY
PROCESS SPECIFICATION Oh
Hi puoseer:
BAe wee
MANUFACTURE OF SGHHSOR'S SABY_FO! RAT XOLMAR
Pt
Step 2. Tf any container fa!1s on the etFloor while being ¢ 2: Ved it must be
discarded.
Step 3. Short wei <= uncapped containers must be broughtto et least) their
Tabel wei t and capped within 1 hour after powder is in open bottle.
FINISHED MATERIAL PROPERT Se NTS FOR MANUFACTURING 35
Fer product specification £29-6.
BABY PROSUCTS COMPANY QUALITY ASSi REQUIS UTS FOR MANUFACTURING
Shall comply with JOHNS Baby Products Company "Minimum Requirements
for Hanufacturing Operaticns",
ae
Farm vie 13 REV. WAT Ges baby enooUCTS CO. 1077
_
J&J-004061 8
Protected Document--Subject to Protective
Order
JNJ 000298190