arrow left
arrow right
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
  • HODGES BORTHERS INC vs. Defendant Not Entered CONTRACTS document preview
						
                                

Preview

Filing # 171450820 E-Filed 04/20/2023 03:11:58 PM IN THE CIRCUIT COURT OF THE NINTH JUDICIAL CIRCUIT IN AND FOR OSCEOLA COUNTY, FLORIDA HODGES BROTHERS, INC., Plaintiff, vs. Case No.: 2018-CA-004003 CLARDY A. MALUGEN, as Trustee of The CLARDY A. MALUGEN FAMILY TRUST, and CLARDY A. MALUGEN, individually, Defendants. / PLAINTIFF’S AMENDED NOTICE OF TAKING DEPOSITION DUCES TECUM OF CORPORATE REPRESENTATIVE OF EMSL MANAGEMENT LLC d/b/a SERVPRO OF SOUTH BREVARD PLEASE TAKE NOTICE that the undersigned attorney for Plaintiff, HODGES BROTHERS, INC., will take the deposition of the following person, at the time and place indicated below, upon oral examination before Esquire Deposition Solutions, or any other Notary Public authorized by law to take depositions: NAME: Corporate Representative of EMSL Management LLC d/b/a ServPro of South Brevard DATE: Thursday, May 11, 2023 TIME: 10:30 a.m. EST PLACE: Depositions will be taken via video conference. Link will be provided. 1 zoom conference information will be provided for counsel to appear remotely under separate cover. This deposition is being taken for the purpose of discovery, for use as evidence and for such other uses and purposes as are permitted under the Florida Rules of Civil Procedure and other applicable law and will continue from day to day pursuant to adjournment, if any, until completed. Pursuant to Rule 1.310(b)(5), Rule 1.350, and Rule 1.351, the deponent is requested to produce documents at the taking of their deposition as outlined on attached Schedule “A”. The attached Schedule “B” outlines the schedule of topics for the deposition. If an interpreter is required, please advise the undersigned. Deponent is to bring valid photo I.D. to deposition. CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 20th day of April, 2023, I electronically filed the foregoing with the Clerk of the Courts by using the E-Portal System pursuant to Florida Rule of Judicial Administration 2.516 (a), which E-Portal will provide service upon: Thomas F. Neal, Esq., 332 N. Magnolia Ave., P.O. Box. 87, Orlando, FL 32802 at e-mails: tneal@dsklawgroup.com and lnovak@dsklawgroup.com(Counsel for Plaintiff), Clardy A. Malugen, individually, via email to clardyclardym.com, and Daniel M. Greene, Esq., Daniel M. Greene, P.A., P.O. Box 3092, Orlando, FL 32802 at e-mails: dangreenelaw@gmail.com and dan@dangreenelaw.com (Counsel for Gail Stedronsky Bove). HILL, RUGH, KELLER & MAIN, P.L. _/s/ Andrew V. Showen ANDREW V. SHOWEN Florida Bar No. 0476153 Board Certified Construction Lawyer 390 North Orange Avenue, Suite 1610 Orlando, FL 32801 (407) 926-7460 (407) 926-7461 (facsimile) filings@hrkmlaw.com Attorney for Plaintiff (only as to counterclaim) cc: Esquire Deposition Solutions 2 If you are a person with a disability who needs any accommodation in order to participate in this proceeding, you are entitled, at no cost to you, to the provision of certain assistance. Please contact Hill, Rugh, Keller & Main, PL., 390 North Orange Avenue, Suite 1610, Orlando, Florida 32801, Telephone (407) 926-7460 within 2 working days of your receipt of this document; if you are hearing or voice impaired, call 1-800-955-8771. 3 SCHEDULE A CORPORATE REPRESENTATIVE OF EMSL MANAGEMENT LLC d/b/a SERVPRO OF SOUTH BREVARD 1. All documents which refer or relate to: a. Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, to UNIVERSAL NORTH AMERICA INSURANCE CO. concerning damage to or repairs to the house located at 214 Celebration Blvd., Celebration, Florida (the “House”), from September 1, 2017 to the current date. b. your repair cost estimate of 2/15/2018 (copy attached as Exhibit A) including sources of any information used to determine all quantities and prices in the estimate. This includes any previous or subsequent drafts or versions of this estimate or any estimate for repair of the House. c. photographs, videos, FLIR photos, samples, test results of the condition of the house located at 214 Celebration Blvd., Celebration, Florida, at any time you observed or inspected it. 2. All communications between You and any of Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, concerning a) the House, b) any damage to the House or repair required; c) the estimates described above, and d) whether or not you would or would not perform the work described in the estimate(s). 3. Records of all payments made to You by any of Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, for damage to the House. 4. All reports, memoranda, photographs, videos, or other documents which refer or relate to any and all claims described in ¶ 2 or of the House. 5. All communications or documents passing between You and any other person concerning any and all claims for damage or loss to the House, or repair of the House. 4 SCHEDULE B CORPORATE REPRESENTATIVE OF EMSL MANAGEMENT LLC d/b/a SERVPRO OF SOUTH BREVARD 1. Condition of and damage to the house located at 214 Celebration Blvd., Celebration, Florida (the “House”), in February 2018 and at any other time you observed or inspected the House. This includes any damage which may have occurred before February 2018. 2. Your repair cost estimate of 2/15/2018 (copy attached as Exhibit A) including sources of any information used to determine all quantities and prices in the estimate. This includes any previous or subsequent drafts or versions of this estimate or any estimate for repair of the House. 3. Photographs, videos, FLIR photos, samples, test results of the condition of the house located at 214 Celebration Blvd., Celebration, Florida, at any time you observed or inspected it. 4. All communications between You and any of Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, concerning a) the House, b) any damage to the House or repair required; c) the estimates described above, and d) whether or not you would or would not perform the work described in the estimate(s). 5. All payments made to You by any of Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, for damage to the House. 6. All reports, memoranda, photographs, videos, or other documents which refer or relate to any and all claims described in ¶ 2 or of the House. 7. Communications with Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, to UNIVERSAL NORTH AMERICA INSURANCE CO., or their insurers, or attorneys, concerning the foregoing. 8. All communications or documents passing between You and any other person concerning any and all claims for damage or loss to the House, or repair of the House. 9. Evidence of any acts or omissions of Hodges Bros. Roofing which you or any other person contends caused the damage to the House. 5 EXHIBIT A SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 Client: Clardy Malugen Home: (407) 353-4486 Property: 214 Celebration Ave Kissimmee, FL 34747 Operator: PHCON321 Estimator: Greg Bosseler Type of Estimate: Date Entered: 2/15/2018 Date Assigned: Date Est. Completed: 2/15/2018 Date Job Completed: Price List: SERVPRO_STANDFEB18 Labor Efficiency: Restoration/Service/Remodel Estimate: CONSTRUCTIONMALUGEN This is a preliminary estimate only. This estimate is the property of SERVPRO of Osceola and has been prepared for the exclusive use of our customer, the insurance agent, insurance adjuster and the insurance company. This estimate may not be distributed or copied without the expressed written permission of SERVPRO of Osceola. SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONSTRUCTIONMALUGEN Main Level Main Level DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1. Haul debris - per pickup truck load - 2.00 EA 169.71 0.00 0.00 67.88 407.30 including dump fees 2. Final cleaning - construction - 2,372.78 SF 0.00 0.20 0.00 94.92 569.48 Residential Note: One rough clean after tile removed and a final clean after project is complete. 3. Job-site cargo/storage container - 20' 1.00 MO 0.00 87.83 6.59 18.88 113.30 long - per month Note: Storage for furniture. 4. Job-site cargo container - pick 2.00 EA 0.00 99.40 14.91 42.74 256.45 up/del. (each way) 16'-40' Total: Main Level 21.50 224.42 1,346.53 2' 6" Hallway Height: 10' 4" 2' 11" 2' 9" 280.83 SF Walls 43.60 SF Ceiling 324.43 SF Walls & Ceiling 43.60 SF Floor 2' 9" 3' 4" 2' 9" 2' 6" 2' 6" 12' 6" 12' 2" HallwHayall Pantry 4.84 SY Flooring 28.08 LF Floor Perimeter 2' 11" 4" 28.08 LF Ceil. Perimeter 3' 7" Missing Wall 3' 7" X 10' Opens into LIVING_ROOM DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 5. R&R Baseboard - 4 1/4" w/shoe 28.08 LF 0.57 6.17 4.65 38.80 232.71 6. Remove Ceramic/porcelain tile 43.60 SF 1.94 0.00 0.00 16.92 101.50 7. Ceramic/porcelain tile 47.96 SF 0.00 9.20 15.40 91.32 547.95 Note: 10% waste added. 8. Floor leveling cement - Average 43.60 SF 0.00 2.03 3.04 18.30 109.85 9. Mask and prep for paint - plastic, 28.08 LF 0.00 1.06 0.48 6.06 36.30 paper, tape (per LF) 10. Seal & paint baseboard w/cap &/or 28.08 LF 0.00 1.34 0.42 7.60 45.65 shoe - two coats 11. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27 side) 12. Paint door/window trim & jamb - 2 3.00 EA 0.00 23.60 0.86 14.34 86.00 coats (per side) 13. Paint door/window trim & jamb - 1.00 EA 0.00 27.76 0.34 5.62 33.72 Large - 2 coats (per side) CONSTRUCTIONMALUGEN 2/16/2018 Page: 2 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Hallway DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 14. Detach & Reset Door knob - 4.00 EA 21.48 0.00 0.00 0.00 17.18 103.10 interior Totals: Hallway 27.10 239.18 1,435.05 3' 7" 12' 3" 12' 3" Living Room Height: 10' 607.83 SF Walls 302.61 SF Ceiling 14' 11" 14' 7" 910.44 SF Walls & Ceiling 302.61 SF Floor 19' 6" 19' Living Room 33.62 SY Flooring 59.33 LF Floor Perimeter 66.58 LF Ceil. Perimeter 4' 5" 13' 2" ok Missing Wall 4' 5" X 10' Opens into NOOK Missing Wall 2' 10" X 10' Opens into NOOK Missing Wall 3' 7" X 10' Opens into HALLWAY DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 15. Contents - move out then reset - 1.00 EA 0.00 137.09 0.00 27.42 164.51 Extra large room 16. R&R Batt insulation - 10" - R30 - 302.61 SF 0.39 1.16 19.75 97.76 586.56 paper faced 17. R&R 1/2" drywall - hung, taped, 302.61 SF 0.45 1.97 9.76 148.42 890.49 ready for texture 18. Texture drywall - heavy hand 302.61 SF 0.00 0.94 2.72 57.44 344.61 texture 19. R&R Baseboard - 4 1/4" w/shoe 59.33 LF 0.57 6.17 9.83 81.94 491.66 20. Remove Ceramic/porcelain tile 151.31 SF 1.94 0.00 0.00 58.70 352.24 21. Ceramic/porcelain tile 166.00 SF 0.00 9.20 53.29 316.10 1,896.59 Note: 10% waste added. 22. Floor leveling cement - Average 151.31 SF 0.00 2.03 10.55 63.56 381.27 23. Mask and prep for paint - plastic, 66.58 LF 0.00 1.06 1.15 14.36 86.08 paper, tape (per LF) 24. Seal & paint baseboard w/cap &/or 59.33 LF 0.00 1.34 0.89 16.08 96.47 shoe - two coats 25. Carpet pad - High grade 151.31 SF 0.00 0.73 7.26 23.56 141.28 26. Carpet - High grade 151.31 SF 0.00 4.32 41.87 139.12 834.65 27. Seal/prime then paint the ceiling 302.61 SF 0.00 0.99 5.45 61.02 366.05 twice (3 coats) 28. Paint the walls - two coats 607.83 SF 0.00 0.73 8.66 90.48 542.86 CONSTRUCTIONMALUGEN 2/16/2018 Page: 3 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Living Room DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 29. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84 vertical - Detach & reset Totals: Living Room 171.18 1,215.26 7,291.16 2' 5" Hall Pantry Height: 10' 11" 161.67 SF Walls 12.50 SF Ceiling 9" 3' 6" 6' 3' 4" 2' 6" 174.17 SF Walls & Ceiling 12.50 SF Floor 6' 8" Hallway Hall Pantry 1.39 SY Flooring 16.17 LF Floor Perimeter 2" 2' 6" 2' 9" 2' 11" 16.17 LF Ceil. Perimeter 4" DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 30. R&R Baseboard - 4 1/4" w/shoe 16.17 LF 0.57 6.17 2.68 22.34 134.01 31. Remove Ceramic/porcelain tile 12.50 SF 1.94 0.00 0.00 4.86 29.11 32. Ceramic/porcelain tile 13.75 SF 0.00 9.20 4.41 26.18 157.09 Note: 10% waste added. 33. Floor leveling cement - Average 12.50 SF 0.00 2.03 0.87 5.26 31.51 34. Mask and prep for paint - plastic, 16.17 LF 0.00 1.06 0.28 3.48 20.90 paper, tape (per LF) 35. Seal & paint baseboard w/cap &/or 16.17 LF 0.00 1.34 0.24 4.38 26.29 shoe - two coats 36. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27 side) 37. Paint door/window trim & jamb - 1.00 EA 0.00 27.76 0.34 5.62 33.72 Large - 2 coats (per side) Totals: Hall Pantry 10.73 95.16 570.90 13' 2" Kitchen Height: 10' 7' 11" 541.67 SF Walls 224.49 SF Ceiling 766.15 SF Walls & Ceiling 224.49 SF Floor 17' 2" 17' 6" Kitchen 2" 3' 7" 3' 3" Pantry 24.94 SY Flooring 52.58 LF Floor Perimeter 2' 8" 2' 6" 3' 5" 60.50 LF Ceil. Perimeter 2' 6" 2' 4" 7' 3" 1' 1" 2' 2" 4' 8" Small KPaitncthryen Hall Missing Wall 7' 11" X 10' Opens into NOOK CONSTRUCTIONMALUGEN 2/16/2018 Page: 4 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Kitchen DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 38. R&R Baseboard - 4 1/4" w/shoe 24.00 LF 0.57 6.17 3.98 33.16 198.90 39. Remove Ceramic/porcelain tile 224.49 SF 1.94 0.00 0.00 87.10 522.61 40. Ceramic/porcelain tile 246.93 SF 0.00 9.20 79.26 470.22 2,821.24 Note: 10% waste added. 41. Floor leveling cement - Average 224.49 SF 0.00 2.03 15.66 94.28 565.65 42. Mask and prep for paint - plastic, 60.50 LF 0.00 1.06 1.04 13.02 78.19 paper, tape (per LF) 43. Seal & paint baseboard w/cap &/or 52.58 LF 0.00 1.34 0.79 14.26 85.51 shoe - two coats 44. R&R Cabinetry - upper (wall) 14.00 LF 8.11 171.53 133.15 529.62 3,177.73 units - High grade 45. R&R Cabinetry - lower (base) 26.83 LF 10.28 211.90 336.41 1,259.50 7,557.00 units - High grade 46. R&R Cabinetry - full height unit - 2.75 LF 16.29 342.01 56.17 208.30 1,249.80 High grade 47. Cabinet knobs or pulls - Detach & 48.00 EA 0.00 2.84 0.00 27.26 163.58 reset 48. Range - electric - Remove & reset 1.00 EA 0.00 33.07 0.00 6.62 39.69 49. Detach & Reset Built-in oven - 1.00 EA 191.35 0.00 0.00 0.00 38.28 229.63 High grade 50. Refrigerator - Remove & reset 1.00 EA 0.00 33.07 0.00 6.62 39.69 51. Detach & Reset Microwave oven - 1.00 EA 111.68 0.00 0.00 0.00 22.34 134.02 over range w/built-in hood - High grade 52. Dishwasher - Detach & reset 1.00 EA 0.00 234.96 0.00 47.00 281.96 53. Garbage disposer - Detach & reset 1.00 EA 0.00 138.13 0.00 27.62 165.75 54. R&R Angle stop valve 2.00 EA 5.40 30.52 1.08 14.58 87.50 55. R&R Plumbing fixture supply line 2.00 EA 5.40 17.49 0.87 9.34 55.99 56. R&R P-trap assembly - ABS 1.00 EA 8.10 52.71 0.45 12.26 73.52 (plastic) 57. R&R Countertop - flat laid plastic 35.58 LF 4.83 41.43 69.41 343.08 2,058.42 laminate 58. R&R Backsplash - plastic laminate 9.00 SF 0.97 7.31 1.78 15.26 91.56 59. R&R Ceramic/porcelain tile 30.00 SF 1.94 9.20 9.63 68.76 412.59 Note: Backsplash tile 60. Add-on for tile backsplash 30.00 SF 0.00 9.00 0.00 54.00 324.00 installation 61. Contents - move out then reset - 1.00 EA 0.00 68.54 0.00 13.70 82.24 Large room 62. R&R Batt insulation - 10" - R30 - 224.49 SF 0.39 1.16 14.65 72.54 435.15 paper faced CONSTRUCTIONMALUGEN 2/16/2018 Page: 5 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Kitchen DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 63. 1/2" drywall - hung, taped, ready 226.49 SF 0.00 1.97 7.30 90.70 544.19 for texture 64. Texture drywall - heavy hand 224.49 SF 0.00 0.94 2.02 42.60 255.64 texture 65. Texture drywall - machine 4.00 SF 0.00 0.47 0.01 0.38 2.27 Note: Wall texture Totals: Kitchen 733.66 3,622.40 21,734.02 7' 2" Nook Height: 8' 7' 2" 4' 5" 2' 10" 237.33 SF Walls 110.40 SF Ceiling 347.74 SF Walls & Ceiling 110.40 SF Floor 13' 2" 12' 6" Nook 12.27 SY Flooring 29.67 LF Floor Perimeter 7' 11" 10' 44.83 LF Ceil. Perimeter 7' 8" 2' Pantry Missing Wall 7' 11" X 8' Opens into KITCHEN Missing Wall 2' 10" X 8' Opens into LIVING_ROOM Missing Wall 4' 5" X 8' Opens into LIVING_ROOM DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 66. Contents - move out then reset 1.00 EA 0.00 45.70 0.00 9.14 54.84 67. R&R Batt insulation - 10" - R30 - 110.40 SF 0.39 1.16 7.20 35.68 214.00 paper faced 68. R&R 1/2" drywall - hung, taped, 110.40 SF 0.45 1.97 3.56 54.16 324.89 ready for texture 69. Texture drywall - heavy hand 110.40 SF 0.00 0.94 0.99 20.96 125.73 texture 70. R&R Baseboard - 4 1/4" w/shoe 29.67 LF 0.57 6.17 4.92 40.98 245.87 71. Remove Ceramic/porcelain tile 110.40 SF 1.94 0.00 0.00 42.84 257.02 72. Ceramic/porcelain tile 121.44 SF 0.00 9.20 38.98 231.26 1,387.49 Note: 10% waste added. 73. Floor leveling cement - Average 110.40 SF 0.00 2.03 7.70 46.36 278.17 74. Mask and prep for paint - plastic, 44.83 LF 0.00 1.06 0.77 9.66 57.95 paper, tape (per LF) 75. Paint the walls and ceiling - two 347.74 SF 0.00 0.73 4.96 51.78 310.59 coats 76. Seal & paint baseboard w/cap &/or 29.67 LF 0.00 1.34 0.44 8.04 48.24 shoe - two coats CONSTRUCTIONMALUGEN 2/16/2018 Page: 6 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Nook DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 77. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84 vertical - Detach & reset Totals: Nook 69.52 570.16 3,420.63 2' 6" Pantry Height: 10' 2' 6" 6" 2" 161.67 SF Walls 12.17 SF Ceiling 3' 3" 6' 1" 2' 11" Pantry 173.83 SF Walls & Ceiling 12.17 SF Floor 6' 5" 2' 6" 1.35 SY Flooring 16.17 LF Floor Perimeter 3' 7" 2' 16.17 LF Ceil. Perimeter 10" 8" 2' 4" DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 78. R&R Baseboard - 4 1/4" w/shoe 16.17 LF 0.57 6.17 2.68 22.34 134.01 79. Remove Ceramic/porcelain tile 12.17 SF 1.94 0.00 0.00 4.72 28.33 80. Ceramic/porcelain tile 13.38 SF 0.00 9.20 4.30 25.48 152.88 Note: 10% waste added. 81. Floor leveling cement - Average 12.17 SF 0.00 2.03 0.85 5.12 30.68 82. Mask and prep for paint - plastic, 16.17 LF 0.00 1.06 0.28 3.48 20.90 paper, tape (per LF) 83. Seal & paint baseboard w/cap &/or 16.17 LF 0.00 1.34 0.24 4.38 26.29 shoe - two coats 84. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27 side) 85. Paint door/window trim & jamb - 2.00 EA 0.00 27.76 0.67 11.24 67.43 Large - 2 coats (per side) Totals: Pantry 10.93 99.80 598.79 4' 10" Kitchen Hall Height: 8' 1' 3" 2' 6" 2" 4' 8" 148.00 SF Walls 21.39 SF Ceiling Small Pantry 4' 7" 169.39 SF Walls & Ceiling 21.39 SF Floor 5' 1" Kitchen Hall 10" 1' 1" 2' 6" 1' 2.38 SY Flooring 18.50 LF Floor Perimeter 1' 6" 1' 4" 18.50 LF Ceil. Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL CONSTRUCTIONMALUGEN 2/16/2018 Page: 7 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 CONTINUED - Kitchen Hall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 86. R&R Baseboard - 4 1/4" w/shoe 18.50 LF 0.57 6.17 3.07 25.58 153.35 87. Remove Ceramic/porcelain tile 21.39 SF 1.94 0.00 0.00 8.30 49.80 88. Ceramic/porcelain tile 23.53 SF 0.00 9.20 7.55 44.82 268.85 Note: 10% waste added. 89. Floor leveling cement - Average 21.39 SF 0.00 2.03 1.49 8.98 53.89 90. Mask and prep for paint - plastic, 18.50 LF 0.00 1.06 0.32 3.98 23.91 paper, tape (per LF) 91. Seal & paint baseboard w/cap &/or 18.50 LF 0.00 1.34 0.28 5.02 30.09 shoe - two coats Totals: Kitchen Hall 12.71 96.68 579.89 Small Pantry Height: 10' 2' 5" 116.67 SF Walls 7.81 SF Ceiling 2' 6" 2" 124.48 SF Walls & Ceiling 7.81 SF Floor 3' 11" 3' 9" Small Pantry Kitchen Hall 0.87 SY Flooring 11.67 LF Floor Perimeter 1' 3" 2' 1" 11.67 LF Ceil. Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 92. R&R Baseboard - 4 1/4" w/shoe 11.67 LF 0.57 6.17 1.93 16.12 96.70 93. Remove Ceramic/porcelain tile 7.81 SF 1.94 0.00 0.00 3.04 18.19 94. Ceramic/porcelain tile 8.59 SF 0.00 9.20 2.76 16.36 98.15 Note: 10% waste added. 95. Floor leveling cement - Average 7.81 SF 0.00 2.03 0.54 3.28 19.67 96. Mask and prep for paint - plastic, 11.67 LF 0.00 1.06 0.20 2.52 15.09 paper, tape (per LF) 97. Seal & paint baseboard w/cap &/or 11.67 LF 0.00 1.34 0.17 3.16 18.97 shoe - two coats 98. Paint door slab only - 2 coats (per 2.00 EA 0.00 28.33 0.95 11.54 69.15 side) 99. Paint door/window trim & jamb - 2 2.00 EA 0.00 23.60 0.57 9.56 57.33 coats (per side) Totals: Small Pantry 7.12 65.58 393.25 CONSTRUCTIONMALUGEN 2/16/2018 Page: 8 SERVPRO OF SOUTH BREVARD Post Office Box 361155 Melbourne, FL. 32936 321-953-8600 Tax ID 59-2889411 6' 6" 2' 6" Office Height: 8' 6' 4" 1' 1" Small Pan 3' 10" 5' 3" 2' 6" 3' 3" 3' 6" 3' 11" 3' 9" Kit 425.33 SF Walls 175.21 SF Ceiling 7' 1" 6' 9" 600.54 SF Walls & Ceiling 175.21 SF Floor 4' 4" 4' 2" Office 19.47 SY Flooring 53.17 LF Floor Perimeter 2' 9" 3' 10" 7' 9" 8' 1" 53.17 LF Ceil. Perimeter 5' 7" 2' 1" 7' 5" 2' 7" 2' 5" 2' 11" DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 100. Contents - move out then reset - 1.00 EA 0.00 68.54 0.00 13.70 82.24 Large room 101. Fill holes created by wall cavity 27.00 EA 0.00 2.15 0.04 11.62 69.71 drying 102. R&R Baseboard - 4 1/4" w/shoe 53.17 LF 0.57 6.17 8.81 73.44 440.62 103. Mask and prep for paint - plastic, 53.17 LF 0.00 1.06 0.92 11.46 68.74 paper, tape (per LF) 104. Seal & paint baseboard w/cap 53.17 LF 0.00 1.34 0.80 14.42 86.47 &/or shoe - two coats 105. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27 side) 106. Paint door/window trim & jamb - 2.00 EA 0.00 27.76 0.67 11.24 67.43 Large - 2 coats (per side) 107. Paint chair rail - two coats 53.17 LF 0.00 1.09 0.44 11.68 70.08 108. Paint the walls - two coats 425.33 SF 0.00 0.73 6.06 63.32 379.87 109. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84 vertical - Detach & reset Totals: Office 19.65 253.22 1,519.27 4' 11" Hall Height: 10' 1' 5" 3' 4" 1' 8" 4' 7" 4' 6" 239.00 SF Walls 58.30 SF Ceiling 297.29 SF Walls & Ceiling 58.30 SF Floor 2