Preview
Filing # 171450820 E-Filed 04/20/2023 03:11:58 PM
IN THE CIRCUIT COURT OF THE
NINTH JUDICIAL CIRCUIT IN AND
FOR OSCEOLA COUNTY, FLORIDA
HODGES BROTHERS, INC.,
Plaintiff,
vs. Case No.: 2018-CA-004003
CLARDY A. MALUGEN, as Trustee of
The CLARDY A. MALUGEN FAMILY
TRUST, and CLARDY A. MALUGEN,
individually,
Defendants.
/
PLAINTIFF’S AMENDED NOTICE OF
TAKING DEPOSITION DUCES TECUM OF
CORPORATE REPRESENTATIVE OF EMSL MANAGEMENT LLC d/b/a
SERVPRO OF SOUTH BREVARD
PLEASE TAKE NOTICE that the undersigned attorney for Plaintiff, HODGES
BROTHERS, INC., will take the deposition of the following person, at the time and place
indicated below, upon oral examination before Esquire Deposition Solutions, or any other Notary
Public authorized by law to take depositions:
NAME: Corporate Representative of EMSL Management LLC
d/b/a ServPro of South Brevard
DATE: Thursday, May 11, 2023
TIME: 10:30 a.m. EST
PLACE: Depositions will be taken via video conference.
Link will be provided.
1
zoom conference information will be provided for counsel to appear remotely under separate cover.
This deposition is being taken for the purpose of discovery, for use as evidence and for
such other uses and purposes as are permitted under the Florida Rules of Civil Procedure and
other applicable law and will continue from day to day pursuant to adjournment, if any, until
completed.
Pursuant to Rule 1.310(b)(5), Rule 1.350, and Rule 1.351, the deponent is requested to
produce documents at the taking of their deposition as outlined on attached Schedule “A”. The
attached Schedule “B” outlines the schedule of topics for the deposition.
If an interpreter is required, please advise the undersigned. Deponent is to bring
valid photo I.D. to deposition.
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 20th day of April, 2023, I electronically filed the
foregoing with the Clerk of the Courts by using the E-Portal System pursuant to Florida Rule of
Judicial Administration 2.516 (a), which E-Portal will provide service upon: Thomas F. Neal,
Esq., 332 N. Magnolia Ave., P.O. Box. 87, Orlando, FL 32802 at e-mails:
tneal@dsklawgroup.com and lnovak@dsklawgroup.com(Counsel for Plaintiff), Clardy A.
Malugen, individually, via email to clardyclardym.com, and Daniel M. Greene, Esq., Daniel
M. Greene, P.A., P.O. Box 3092, Orlando, FL 32802 at e-mails: dangreenelaw@gmail.com and
dan@dangreenelaw.com (Counsel for Gail Stedronsky Bove).
HILL, RUGH, KELLER & MAIN, P.L.
_/s/ Andrew V. Showen
ANDREW V. SHOWEN
Florida Bar No. 0476153
Board Certified Construction Lawyer
390 North Orange Avenue, Suite 1610
Orlando, FL 32801
(407) 926-7460
(407) 926-7461 (facsimile)
filings@hrkmlaw.com
Attorney for Plaintiff (only as to counterclaim)
cc: Esquire Deposition Solutions
2
If you are a person with a disability who needs any accommodation in order to
participate in this proceeding, you are entitled, at no cost to you, to the provision of certain
assistance. Please contact Hill, Rugh, Keller & Main, PL., 390 North Orange Avenue, Suite
1610, Orlando, Florida 32801, Telephone (407) 926-7460 within 2 working days of your receipt
of this document; if you are hearing or voice impaired, call 1-800-955-8771.
3
SCHEDULE A
CORPORATE REPRESENTATIVE OF EMSL
MANAGEMENT LLC d/b/a SERVPRO OF SOUTH BREVARD
1. All documents which refer or relate to:
a. Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia Stelzner or Sarah
Stelzner as trustee of the Clardy A. Malugen Family Trust, to UNIVERSAL
NORTH AMERICA INSURANCE CO. concerning damage to or repairs to the
house located at 214 Celebration Blvd., Celebration, Florida (the “House”), from
September 1, 2017 to the current date.
b. your repair cost estimate of 2/15/2018 (copy attached as Exhibit A) including
sources of any information used to determine all quantities and prices in the
estimate. This includes any previous or subsequent drafts or versions of this
estimate or any estimate for repair of the House.
c. photographs, videos, FLIR photos, samples, test results of the condition of the
house located at 214 Celebration Blvd., Celebration, Florida, at any time you
observed or inspected it.
2. All communications between You and any of Clardy A. Malugen or the Clardy A.
Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen
Family Trust, concerning a) the House, b) any damage to the House or repair required; c)
the estimates described above, and d) whether or not you would or would not perform the
work described in the estimate(s).
3. Records of all payments made to You by any of Clardy A. Malugen or the Clardy A.
Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen
Family Trust, for damage to the House.
4. All reports, memoranda, photographs, videos, or other documents which refer or relate to
any and all claims described in ¶ 2 or of the House.
5. All communications or documents passing between You and any other person concerning
any and all claims for damage or loss to the House, or repair of the House.
4
SCHEDULE B
CORPORATE REPRESENTATIVE OF EMSL
MANAGEMENT LLC d/b/a SERVPRO OF SOUTH BREVARD
1. Condition of and damage to the house located at 214 Celebration Blvd., Celebration,
Florida (the “House”), in February 2018 and at any other time you observed or inspected
the House. This includes any damage which may have occurred before February 2018.
2. Your repair cost estimate of 2/15/2018 (copy attached as Exhibit A) including sources of
any information used to determine all quantities and prices in the estimate. This includes
any previous or subsequent drafts or versions of this estimate or any estimate for repair of
the House.
3. Photographs, videos, FLIR photos, samples, test results of the condition of the house
located at 214 Celebration Blvd., Celebration, Florida, at any time you observed or
inspected it.
4. All communications between You and any of Clardy A. Malugen or the Clardy A.
Malugen Trust, or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen
Family Trust, concerning a) the House, b) any damage to the House or repair required; c)
the estimates described above, and d) whether or not you would or would not perform the
work described in the estimate(s).
5. All payments made to You by any of Clardy A. Malugen or the Clardy A. Malugen Trust,
or Patricia Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust,
for damage to the House.
6. All reports, memoranda, photographs, videos, or other documents which refer or relate to
any and all claims described in ¶ 2 or of the House.
7. Communications with Clardy A. Malugen or the Clardy A. Malugen Trust, or Patricia
Stelzner or Sarah Stelzner as trustee of the Clardy A. Malugen Family Trust, to
UNIVERSAL NORTH AMERICA INSURANCE CO., or their insurers, or attorneys,
concerning the foregoing.
8. All communications or documents passing between You and any other person concerning
any and all claims for damage or loss to the House, or repair of the House.
9. Evidence of any acts or omissions of Hodges Bros. Roofing which you or any other
person contends caused the damage to the House.
5
EXHIBIT A
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
Client: Clardy Malugen Home: (407) 353-4486
Property: 214 Celebration Ave
Kissimmee, FL 34747
Operator: PHCON321
Estimator: Greg Bosseler
Type of Estimate:
Date Entered: 2/15/2018 Date Assigned:
Date Est. Completed: 2/15/2018 Date Job Completed:
Price List: SERVPRO_STANDFEB18
Labor Efficiency: Restoration/Service/Remodel
Estimate: CONSTRUCTIONMALUGEN
This is a preliminary estimate only. This estimate is the property of SERVPRO of Osceola and has been prepared for the
exclusive use of our customer, the insurance agent, insurance adjuster and the insurance company. This estimate may not
be distributed or copied without the expressed written permission of SERVPRO of Osceola.
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONSTRUCTIONMALUGEN
Main Level
Main Level
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1. Haul debris - per pickup truck load - 2.00 EA 169.71 0.00 0.00 67.88 407.30
including dump fees
2. Final cleaning - construction - 2,372.78 SF 0.00 0.20 0.00 94.92 569.48
Residential
Note: One rough clean after tile removed and a final clean after project is complete.
3. Job-site cargo/storage container - 20' 1.00 MO 0.00 87.83 6.59 18.88 113.30
long - per month
Note: Storage for furniture.
4. Job-site cargo container - pick 2.00 EA 0.00 99.40 14.91 42.74 256.45
up/del. (each way) 16'-40'
Total: Main Level 21.50 224.42 1,346.53
2' 6" Hallway Height: 10'
4"
2' 11"
2' 9"
280.83 SF Walls 43.60 SF Ceiling
324.43 SF Walls & Ceiling 43.60 SF Floor
2' 9" 3' 4"
2' 9" 2' 6" 2' 6"
12' 6"
12' 2"
HallwHayall Pantry
4.84 SY Flooring 28.08 LF Floor Perimeter
2' 11"
4"
28.08 LF Ceil. Perimeter
3' 7"
Missing Wall 3' 7" X 10' Opens into LIVING_ROOM
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
5. R&R Baseboard - 4 1/4" w/shoe 28.08 LF 0.57 6.17 4.65 38.80 232.71
6. Remove Ceramic/porcelain tile 43.60 SF 1.94 0.00 0.00 16.92 101.50
7. Ceramic/porcelain tile 47.96 SF 0.00 9.20 15.40 91.32 547.95
Note: 10% waste added.
8. Floor leveling cement - Average 43.60 SF 0.00 2.03 3.04 18.30 109.85
9. Mask and prep for paint - plastic, 28.08 LF 0.00 1.06 0.48 6.06 36.30
paper, tape (per LF)
10. Seal & paint baseboard w/cap &/or 28.08 LF 0.00 1.34 0.42 7.60 45.65
shoe - two coats
11. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27
side)
12. Paint door/window trim & jamb - 2 3.00 EA 0.00 23.60 0.86 14.34 86.00
coats (per side)
13. Paint door/window trim & jamb - 1.00 EA 0.00 27.76 0.34 5.62 33.72
Large - 2 coats (per side)
CONSTRUCTIONMALUGEN 2/16/2018 Page: 2
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Hallway
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
14. Detach & Reset Door knob - 4.00 EA 21.48 0.00 0.00 0.00 17.18 103.10
interior
Totals: Hallway 27.10 239.18 1,435.05
3' 7" 12' 3"
12' 3" Living Room Height: 10'
607.83 SF Walls 302.61 SF Ceiling
14' 11"
14' 7"
910.44 SF Walls & Ceiling 302.61 SF Floor
19' 6"
19'
Living Room
33.62 SY Flooring 59.33 LF Floor Perimeter
66.58 LF Ceil. Perimeter
4' 5"
13' 2"
ok
Missing Wall 4' 5" X 10' Opens into NOOK
Missing Wall 2' 10" X 10' Opens into NOOK
Missing Wall 3' 7" X 10' Opens into HALLWAY
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
15. Contents - move out then reset - 1.00 EA 0.00 137.09 0.00 27.42 164.51
Extra large room
16. R&R Batt insulation - 10" - R30 - 302.61 SF 0.39 1.16 19.75 97.76 586.56
paper faced
17. R&R 1/2" drywall - hung, taped, 302.61 SF 0.45 1.97 9.76 148.42 890.49
ready for texture
18. Texture drywall - heavy hand 302.61 SF 0.00 0.94 2.72 57.44 344.61
texture
19. R&R Baseboard - 4 1/4" w/shoe 59.33 LF 0.57 6.17 9.83 81.94 491.66
20. Remove Ceramic/porcelain tile 151.31 SF 1.94 0.00 0.00 58.70 352.24
21. Ceramic/porcelain tile 166.00 SF 0.00 9.20 53.29 316.10 1,896.59
Note: 10% waste added.
22. Floor leveling cement - Average 151.31 SF 0.00 2.03 10.55 63.56 381.27
23. Mask and prep for paint - plastic, 66.58 LF 0.00 1.06 1.15 14.36 86.08
paper, tape (per LF)
24. Seal & paint baseboard w/cap &/or 59.33 LF 0.00 1.34 0.89 16.08 96.47
shoe - two coats
25. Carpet pad - High grade 151.31 SF 0.00 0.73 7.26 23.56 141.28
26. Carpet - High grade 151.31 SF 0.00 4.32 41.87 139.12 834.65
27. Seal/prime then paint the ceiling 302.61 SF 0.00 0.99 5.45 61.02 366.05
twice (3 coats)
28. Paint the walls - two coats 607.83 SF 0.00 0.73 8.66 90.48 542.86
CONSTRUCTIONMALUGEN 2/16/2018 Page: 3
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Living Room
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
29. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84
vertical - Detach & reset
Totals: Living Room 171.18 1,215.26 7,291.16
2' 5"
Hall Pantry Height: 10'
11"
161.67 SF Walls 12.50 SF Ceiling
9"
3' 6"
6' 3' 4"
2' 6"
174.17 SF Walls & Ceiling 12.50 SF Floor
6' 8"
Hallway Hall Pantry
1.39 SY Flooring 16.17 LF Floor Perimeter
2" 2' 6"
2' 9"
2' 11"
16.17 LF Ceil. Perimeter
4"
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
30. R&R Baseboard - 4 1/4" w/shoe 16.17 LF 0.57 6.17 2.68 22.34 134.01
31. Remove Ceramic/porcelain tile 12.50 SF 1.94 0.00 0.00 4.86 29.11
32. Ceramic/porcelain tile 13.75 SF 0.00 9.20 4.41 26.18 157.09
Note: 10% waste added.
33. Floor leveling cement - Average 12.50 SF 0.00 2.03 0.87 5.26 31.51
34. Mask and prep for paint - plastic, 16.17 LF 0.00 1.06 0.28 3.48 20.90
paper, tape (per LF)
35. Seal & paint baseboard w/cap &/or 16.17 LF 0.00 1.34 0.24 4.38 26.29
shoe - two coats
36. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27
side)
37. Paint door/window trim & jamb - 1.00 EA 0.00 27.76 0.34 5.62 33.72
Large - 2 coats (per side)
Totals: Hall Pantry 10.73 95.16 570.90
13' 2"
Kitchen Height: 10'
7' 11"
541.67 SF Walls 224.49 SF Ceiling
766.15 SF Walls & Ceiling 224.49 SF Floor
17' 2"
17' 6"
Kitchen
2"
3' 7" 3' 3"
Pantry
24.94 SY Flooring 52.58 LF Floor Perimeter
2' 8" 2' 6"
3' 5"
60.50 LF Ceil. Perimeter
2' 6"
2' 4" 7' 3"
1' 1" 2' 2" 4' 8"
Small KPaitncthryen Hall
Missing Wall 7' 11" X 10' Opens into NOOK
CONSTRUCTIONMALUGEN 2/16/2018 Page: 4
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Kitchen
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
38. R&R Baseboard - 4 1/4" w/shoe 24.00 LF 0.57 6.17 3.98 33.16 198.90
39. Remove Ceramic/porcelain tile 224.49 SF 1.94 0.00 0.00 87.10 522.61
40. Ceramic/porcelain tile 246.93 SF 0.00 9.20 79.26 470.22 2,821.24
Note: 10% waste added.
41. Floor leveling cement - Average 224.49 SF 0.00 2.03 15.66 94.28 565.65
42. Mask and prep for paint - plastic, 60.50 LF 0.00 1.06 1.04 13.02 78.19
paper, tape (per LF)
43. Seal & paint baseboard w/cap &/or 52.58 LF 0.00 1.34 0.79 14.26 85.51
shoe - two coats
44. R&R Cabinetry - upper (wall) 14.00 LF 8.11 171.53 133.15 529.62 3,177.73
units - High grade
45. R&R Cabinetry - lower (base) 26.83 LF 10.28 211.90 336.41 1,259.50 7,557.00
units - High grade
46. R&R Cabinetry - full height unit - 2.75 LF 16.29 342.01 56.17 208.30 1,249.80
High grade
47. Cabinet knobs or pulls - Detach & 48.00 EA 0.00 2.84 0.00 27.26 163.58
reset
48. Range - electric - Remove & reset 1.00 EA 0.00 33.07 0.00 6.62 39.69
49. Detach & Reset Built-in oven - 1.00 EA 191.35 0.00 0.00 0.00 38.28 229.63
High grade
50. Refrigerator - Remove & reset 1.00 EA 0.00 33.07 0.00 6.62 39.69
51. Detach & Reset Microwave oven - 1.00 EA 111.68 0.00 0.00 0.00 22.34 134.02
over range w/built-in hood - High
grade
52. Dishwasher - Detach & reset 1.00 EA 0.00 234.96 0.00 47.00 281.96
53. Garbage disposer - Detach & reset 1.00 EA 0.00 138.13 0.00 27.62 165.75
54. R&R Angle stop valve 2.00 EA 5.40 30.52 1.08 14.58 87.50
55. R&R Plumbing fixture supply line 2.00 EA 5.40 17.49 0.87 9.34 55.99
56. R&R P-trap assembly - ABS 1.00 EA 8.10 52.71 0.45 12.26 73.52
(plastic)
57. R&R Countertop - flat laid plastic 35.58 LF 4.83 41.43 69.41 343.08 2,058.42
laminate
58. R&R Backsplash - plastic laminate 9.00 SF 0.97 7.31 1.78 15.26 91.56
59. R&R Ceramic/porcelain tile 30.00 SF 1.94 9.20 9.63 68.76 412.59
Note: Backsplash tile
60. Add-on for tile backsplash 30.00 SF 0.00 9.00 0.00 54.00 324.00
installation
61. Contents - move out then reset - 1.00 EA 0.00 68.54 0.00 13.70 82.24
Large room
62. R&R Batt insulation - 10" - R30 - 224.49 SF 0.39 1.16 14.65 72.54 435.15
paper faced
CONSTRUCTIONMALUGEN 2/16/2018 Page: 5
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Kitchen
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
63. 1/2" drywall - hung, taped, ready 226.49 SF 0.00 1.97 7.30 90.70 544.19
for texture
64. Texture drywall - heavy hand 224.49 SF 0.00 0.94 2.02 42.60 255.64
texture
65. Texture drywall - machine 4.00 SF 0.00 0.47 0.01 0.38 2.27
Note: Wall texture
Totals: Kitchen 733.66 3,622.40 21,734.02
7' 2" Nook Height: 8'
7' 2"
4' 5"
2' 10" 237.33 SF Walls 110.40 SF Ceiling
347.74 SF Walls & Ceiling 110.40 SF Floor
13' 2"
12' 6"
Nook
12.27 SY Flooring 29.67 LF Floor Perimeter
7' 11"
10'
44.83 LF Ceil. Perimeter
7' 8" 2'
Pantry
Missing Wall 7' 11" X 8' Opens into KITCHEN
Missing Wall 2' 10" X 8' Opens into LIVING_ROOM
Missing Wall 4' 5" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
66. Contents - move out then reset 1.00 EA 0.00 45.70 0.00 9.14 54.84
67. R&R Batt insulation - 10" - R30 - 110.40 SF 0.39 1.16 7.20 35.68 214.00
paper faced
68. R&R 1/2" drywall - hung, taped, 110.40 SF 0.45 1.97 3.56 54.16 324.89
ready for texture
69. Texture drywall - heavy hand 110.40 SF 0.00 0.94 0.99 20.96 125.73
texture
70. R&R Baseboard - 4 1/4" w/shoe 29.67 LF 0.57 6.17 4.92 40.98 245.87
71. Remove Ceramic/porcelain tile 110.40 SF 1.94 0.00 0.00 42.84 257.02
72. Ceramic/porcelain tile 121.44 SF 0.00 9.20 38.98 231.26 1,387.49
Note: 10% waste added.
73. Floor leveling cement - Average 110.40 SF 0.00 2.03 7.70 46.36 278.17
74. Mask and prep for paint - plastic, 44.83 LF 0.00 1.06 0.77 9.66 57.95
paper, tape (per LF)
75. Paint the walls and ceiling - two 347.74 SF 0.00 0.73 4.96 51.78 310.59
coats
76. Seal & paint baseboard w/cap &/or 29.67 LF 0.00 1.34 0.44 8.04 48.24
shoe - two coats
CONSTRUCTIONMALUGEN 2/16/2018 Page: 6
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Nook
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
77. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84
vertical - Detach & reset
Totals: Nook 69.52 570.16 3,420.63
2' 6"
Pantry Height: 10'
2' 6" 6"
2"
161.67 SF Walls 12.17 SF Ceiling
3' 3"
6' 1" 2' 11"
Pantry 173.83 SF Walls & Ceiling 12.17 SF Floor
6' 5"
2' 6"
1.35 SY Flooring 16.17 LF Floor Perimeter
3' 7"
2'
16.17 LF Ceil. Perimeter
10"
8"
2' 4"
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
78. R&R Baseboard - 4 1/4" w/shoe 16.17 LF 0.57 6.17 2.68 22.34 134.01
79. Remove Ceramic/porcelain tile 12.17 SF 1.94 0.00 0.00 4.72 28.33
80. Ceramic/porcelain tile 13.38 SF 0.00 9.20 4.30 25.48 152.88
Note: 10% waste added.
81. Floor leveling cement - Average 12.17 SF 0.00 2.03 0.85 5.12 30.68
82. Mask and prep for paint - plastic, 16.17 LF 0.00 1.06 0.28 3.48 20.90
paper, tape (per LF)
83. Seal & paint baseboard w/cap &/or 16.17 LF 0.00 1.34 0.24 4.38 26.29
shoe - two coats
84. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27
side)
85. Paint door/window trim & jamb - 2.00 EA 0.00 27.76 0.67 11.24 67.43
Large - 2 coats (per side)
Totals: Pantry 10.93 99.80 598.79
4' 10"
Kitchen Hall Height: 8'
1' 3" 2' 6" 2"
4' 8"
148.00 SF Walls 21.39 SF Ceiling
Small Pantry
4' 7"
169.39 SF Walls & Ceiling 21.39 SF Floor
5' 1"
Kitchen Hall
10" 1' 1"
2' 6" 1' 2.38 SY Flooring 18.50 LF Floor Perimeter
1' 6" 1' 4"
18.50 LF Ceil. Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
CONSTRUCTIONMALUGEN 2/16/2018 Page: 7
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
CONTINUED - Kitchen Hall
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
86. R&R Baseboard - 4 1/4" w/shoe 18.50 LF 0.57 6.17 3.07 25.58 153.35
87. Remove Ceramic/porcelain tile 21.39 SF 1.94 0.00 0.00 8.30 49.80
88. Ceramic/porcelain tile 23.53 SF 0.00 9.20 7.55 44.82 268.85
Note: 10% waste added.
89. Floor leveling cement - Average 21.39 SF 0.00 2.03 1.49 8.98 53.89
90. Mask and prep for paint - plastic, 18.50 LF 0.00 1.06 0.32 3.98 23.91
paper, tape (per LF)
91. Seal & paint baseboard w/cap &/or 18.50 LF 0.00 1.34 0.28 5.02 30.09
shoe - two coats
Totals: Kitchen Hall 12.71 96.68 579.89
Small Pantry Height: 10'
2' 5"
116.67 SF Walls 7.81 SF Ceiling
2' 6" 2"
124.48 SF Walls & Ceiling 7.81 SF Floor
3' 11"
3' 9"
Small Pantry
Kitchen Hall
0.87 SY Flooring 11.67 LF Floor Perimeter
1' 3"
2' 1"
11.67 LF Ceil. Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
92. R&R Baseboard - 4 1/4" w/shoe 11.67 LF 0.57 6.17 1.93 16.12 96.70
93. Remove Ceramic/porcelain tile 7.81 SF 1.94 0.00 0.00 3.04 18.19
94. Ceramic/porcelain tile 8.59 SF 0.00 9.20 2.76 16.36 98.15
Note: 10% waste added.
95. Floor leveling cement - Average 7.81 SF 0.00 2.03 0.54 3.28 19.67
96. Mask and prep for paint - plastic, 11.67 LF 0.00 1.06 0.20 2.52 15.09
paper, tape (per LF)
97. Seal & paint baseboard w/cap &/or 11.67 LF 0.00 1.34 0.17 3.16 18.97
shoe - two coats
98. Paint door slab only - 2 coats (per 2.00 EA 0.00 28.33 0.95 11.54 69.15
side)
99. Paint door/window trim & jamb - 2 2.00 EA 0.00 23.60 0.57 9.56 57.33
coats (per side)
Totals: Small Pantry 7.12 65.58 393.25
CONSTRUCTIONMALUGEN 2/16/2018 Page: 8
SERVPRO OF SOUTH BREVARD
Post Office Box 361155
Melbourne, FL. 32936
321-953-8600
Tax ID 59-2889411
6' 6" 2' 6" Office Height: 8'
6' 4" 1' 1" Small Pan
3' 10"
5' 3" 2' 6" 3' 3" 3' 6"
3' 11"
3' 9"
Kit
425.33 SF Walls 175.21 SF Ceiling
7' 1"
6' 9"
600.54 SF Walls & Ceiling 175.21 SF Floor
4' 4"
4' 2"
Office
19.47 SY Flooring 53.17 LF Floor Perimeter
2' 9" 3' 10"
7' 9"
8' 1"
53.17 LF Ceil. Perimeter
5' 7"
2' 1" 7' 5" 2' 7"
2' 5" 2' 11"
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
100. Contents - move out then reset - 1.00 EA 0.00 68.54 0.00 13.70 82.24
Large room
101. Fill holes created by wall cavity 27.00 EA 0.00 2.15 0.04 11.62 69.71
drying
102. R&R Baseboard - 4 1/4" w/shoe 53.17 LF 0.57 6.17 8.81 73.44 440.62
103. Mask and prep for paint - plastic, 53.17 LF 0.00 1.06 0.92 11.46 68.74
paper, tape (per LF)
104. Seal & paint baseboard w/cap 53.17 LF 0.00 1.34 0.80 14.42 86.47
&/or shoe - two coats
105. Paint door slab only - 2 coats (per 4.00 EA 0.00 28.33 1.91 23.04 138.27
side)
106. Paint door/window trim & jamb - 2.00 EA 0.00 27.76 0.67 11.24 67.43
Large - 2 coats (per side)
107. Paint chair rail - two coats 53.17 LF 0.00 1.09 0.44 11.68 70.08
108. Paint the walls - two coats 425.33 SF 0.00 0.73 6.06 63.32 379.87
109. Window blind - horizontal or 3.00 EA 0.00 32.18 0.00 19.30 115.84
vertical - Detach & reset
Totals: Office 19.65 253.22 1,519.27
4' 11" Hall Height: 10'
1' 5" 3' 4" 1'
8"
4' 7"
4' 6"
239.00 SF Walls 58.30 SF Ceiling
297.29 SF Walls & Ceiling 58.30 SF Floor
2