arrow left
arrow right
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
  • PUGLIA ENGINEERING, INC., A CORPORATION VS. BAE SYSTEMS SHIP REPAIR INC., A CORPORATION ET AL FRAUD document preview
						
                                

Preview

PHILLIPS, ERLEWINE, GIVEN & CAR wv R. SCOTT ERLEWINE (State Bar No. 095106) PHILLIPS, ERLEWINE, GIVEN & CARLIN LLP 39 Mesa Street, Suite 201 The Presidio San Francisco, CA 94129 Telephone: 415-398-0900 Fax: 415-398-0911 Email: rse@phillaw.com Attorneys for Plaintiff Puglia Engineering, Inc. ELECTRONICALLY FILED Superior Court of California, County of San Francisco 08/03/2017 Clerk of the Court BY: DAVID YUEN Deputy Clerk SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SAN FRANCISCO PUGLIA ENGINEERING, INC., a Washington corporation, Plaintiff, Vv. BAE SYSTEM SHIP REPAIR, INC., a Delaware corporation, BAE SYSTEMS SAN FRANCISCO SHIP REPAIR, INC., a California corporation, CITY AND COUNTY OF SAN FRANCISCO, a municipal corporation, operating by and through the San Francisco Port Commission, Defendant. Case No: CGC-17-557087 EXHIBIT A (PART 1) TO DECLARATION OF R. SCOTT ERLEWINE IN SUPPORT OF PLAINTIFF’S OPPOSITION TO DEFENDANTS BAE SYSTEMS SHIP REPAIR INC. AND BAE SYSTEMS, INC.’S MOTION TO DISMISS AND DEMURRER Date: August 16, 2017 Time: 9:30 a.m. Department: 302 Judge: Hon. Harold Kahn Complaint Filed: February 15, 2017 Trial Date: Not Yet Set 1 EXH A (PART 1) TO DECL. OF COUNSEL ISO OPP. TO MOTION TO DISMISS AND DEMURRER Case No. CGC-17-557087EXHIBIT ACo Ow YN DH PB WN N Doe ee ee ee ee BNRRRREBBHRSGESERTRAERTHREKS Case 3:17-cv-01444-JSC Document 27 Filed 04/20/17 Page 1 of 5 DENNIS J. HERRERA, State Bar #139669 City Attorney 7 YVONNE R. MERE, State Bar #173594 Chief of Complex and Affirmative Litigation OWEN J. CLEMENTS, State Bar #141805 MATTHEW D. GOLDBERG, State Bar #240776 Deputy City Attorneys Fox Plaza 1390 Market Street, 6th Floor San Francisco, California 94102-5408 Telephone: (415) 554-3944 Facsimile: (415) 437-4644 E-Mail: Owen.Clements @sfgov.org Attorneys for Defendant CITY AND COUNTY OF SAN FRANCISCO UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA PUGLIA ENGINEERING, INC., a corporation, Plaintiff, vs. BAE SYSTEMS SHIP REPAIR INC., a corporation, BAE SYSTEMS SAN FRANCISCO SHIP REPAIR INC., a corporation; BAE SYSTEMS, INC., a corporation; CITY AND COUNTY OF SAN FRANCISCO, a municipal corporation; and DOES 1-20, Defendants. Roybal Decl. re Remand Motion and Transfer Motion USDC Case No. 3:17-cv-1444-JSC Case No. 3:17-cv-1444-JSC Declaration of Gerard L. Roybal In Support of Defendant City and County of San Francisco’s Non-Opposition to Plaintiff's Motion for Remand and Opposition to BAE Systems’ Motion to Transfer This Case to the Southern District of New York Hearing Date: May 18, 2017 Time: 9:00 a.m. Place: Courtroom F, 15th Floor Judge: Jacqueline Scott Corley Complaint Filed: February 15, 2017 Removal Filed: March 16, 2017 Trial Date: Not Set 1 c-\users\groybal\appdata\local\microsofi\windows\temporary internet files\content.outlook\sri704rk\01 186240 (3).docxCo Oe YN DH BF Ww NY Be ee ee ele BNRRRRBREBSGERFEWVARKDEBHESS Case 3:17-cv-01444-JSC Document 27 Filed 04/20/17 Page 2 of 5 I, Gerard Lee Roybal, declare as follows: 1. Tam a Maritime Marketing Manager for the Port of San Francisco (“the Port”). I have personal knowledge of the facts set forth below, except for those facts stated upon information and belief. If called to testify to the facts stated below, I could and would testify to them competently. 2. Thave worked for the Port in various capacities since 1993. Since 1993, my responsibilities have always included overseeing ship repair activities at Port properties. The San Francisco Shipyard, located at Piers 68 and 70 (“the Shipyard”), has long been the most significant ship repair operation at the Port. It is now the only significant commercial ship repair yard located on Port property. 3. The allegations of paragraph 3 are based on my review of the Port’s records, which I am informed and believe are accurate. Ships have been built and repaired at the Shipyard for over 150 years. The Shipyard has been involved with building and repairing steel ships since the founding of Union Iron Works in 1883. The USS Olympia was built there and launched in 1891. That ship became the flagship of the U.S. Pacific Fleet under Commodore Dewey during the Spanish-American War, and played a central role at the Battle of Manila. Substantial improvements were made to the Shipyard during both World War One and World War Two in order to support naval activities. The last ship built in the Shipyard was the USS Bradley in 1965. After 1965, the Shipyard focused on ship repair under the Bethlehem Steel Company. Military and government contracts were the core of the Shipyard’s work. 4, After military base closures on the West Coast in the early 1990s, the Shipyard lost much of its military business. The Port worked with Southwest Marine, a predecessor in interest to BAE Systems San Francisco Ship Repair (““BAE-SF”), to restructure the Shipyard’s lease. The lease was restructured to help Southwest Marine transition from defense work to commercial ship repair, in order to preserve ship repair operations at the Shipyard. I was hired on June 21, 1993 as part of that effort, and I have worked with the operators of the Shipyard ever since. 5. The Port has a commitment to supporting ship repair activities on Port property, and especially at the Shipyard. Ship repair constitutes a significant maritime use of Port property. Operations at the Shipyard historically have directly employed hundreds of skilled trade laborers on an Roybal Decl. re Remand Motion and Transfer Motion 2 c‘\users\groybal\appdata\local\microsoft\windows\temporary USDC Case No. 3:17-cv-1444-ISC internet files\content.outlook\sri704rk\01 186240 (3).docxoO ND WR WN NN Be Be Be Be Be Be ewe Be ew re OC OO KN DH FF Ww NY KF CO Case 3:17-cv-01444-JSC Document 27 Filed 04/20/17 Page 3 of 5 on-going basis. The Shipyard has employed many more skilled workers in peak periods, such as during cruise ship repair jobs. The Shipyard also indirectly supports many other jobs by attracting maritime commerce to the Port through increased activities of cruise ships, cargo vessels, and military ships. The Port thus has a vital interest in continuing ship repair operations at the Shipyard. 6. The Port owns the land on which the Shipyard is located. The Port also owns valuable equipment that is used in connection with the Shipyard’s operation, including Drydock Eureka, Drydock #2, and a number of cranes. For many years, the Port has leased the Shipyard and the associated equipment to various operators. The Port has received monthly rental payments and other revenues associated with the Shipyard’s operations under these leases. For example, the Port received revenues of $1,409,014 from the Shipyard in 2016. 7. The Shipyard started operating under the BAE name on June 24, 2005. I have been the primary Port property manager for the Shipyard since before that time. On March 24, 2015, the Port Commission authorized the Executive Director of the Port to enter into a new 20-year lease with BAE- SF for the continued operation of the Shipyard (Lease No. L-15875, hereinafter “the Lease”). I was one of the lead negotiators of that Lease for the Port. A true and correct copy of the Lease is attached hereto as Exhibit A. 8. Under the terms of the Lease, BAE-SF was required, at its sole cost and expense, to maintain and repair the Shipyard and its associated equipment in good condition. Specifically, under sections 13.1 and 13.3 and other provisions of the Lease, BAE-SF was required to properly maintain Drydock Eureka and Drydock No. 2 and other Port equipment. Under section 13.7 of the Lease, BAE- SF was required to perform dredging activities in connection with its operation of the Shipyard. And under section 30 of the Lease, BAE-SF was required to use commercially reasonable efforts to ensure the continuous use of the Shipyard and the Drydocks. 9. In December 2016, BAE-SF’s parent companies, BAE Systems Inc. and BAE Systems Ship Repair, Inc., requested that the Port consent to the transfer of the Shipyard’s operations to Puglia Engineering, Inc. (“Puglia”). Among other arguments in support of the transfer, I understand that BAE Systems and Puglia asserted that Puglia’s status as a certified small business would allow Puglia to win more work for the Shipyard than the BAE entities could. Roybal Decl. re Remand Motion and Transfer Motion 3 c:\users\groybal\appdata\local\microsoft\windows\temporary USDC Case No. 3:17-cv-1444-JSC internet files\content.outlook\sri704rk\01 186240 (3).docxCeo yY DW RF WN Bee ee ee ee oe BNRRREBBREBE SCREW ABE SRE S Case 3:17-cv-01444-JSC Document 27 Filed 04/20/17 Page 4 of 5 10. In January 2017, Puglia informed the Port that BAE-SF had failed to perform several material obligations under the Lease. According to Puglia, BAE-SF had failed, among other things, to (1) maintain and repair Drydock Eureka, which made it unusable and unable to meet a January 17, 2017 re-certification deadline; (2) dredge the site for many years, other than limited dredging to permit access to Drydock #2, which further impacted the ability to use Drydock Eureka; and (3) adequately maintain and repair Drydock #2. Puglia claimed that BAE Systems misrepresented and/or failed to disclose this information to Puglia. Puglia claimed that as a result of these defaults, Puglia would be unable to operate the Shipyard on a financially viable basis. 11. On February 17, 2017, the Port issued a notice of default to Puglia, BAE-SF, and BAE Systems, for failure to pay rent and other amounts owed under the Lease, and for failure to perform lease obligations relating to the maintenance and repair of the drydocks and other Port equipment, dredging, and continuous operation of the Shipyard. A true and correct copy of that notice of default is attached hereto as Exhibit B. To date, the defaults relating to the Port’s drydocks and other equipment, dredging, and continuous operation of the Shipyard including both drydocks remain uncured. 12. In March 2017, Puglia and the Port entered into a Tolling and Interim Operating Agreement to allow for the continued operation of the Shipyard. A true and correct copy of that agreement is attached hereto as Exhibit C. This Agreement, effective as of February 28, 2017, has a term of 90 days (subject to extension by mutual agreement). See Ex. C, § 3. If the Agreement is not extended, it will expire at the end of May 2017. 13. Tam aware that a number of current and former managers of BAE-SF’s operations at the Shipyard are currently located, at least part of the time, in the San Francisco Bay Area. All of the Port’s employees who have had significant involvement with the Shipyard over the past few years also live and work in the Bay Area. 14. In my understanding, most of the relevant evidence relating to BAE System’s operation of the Shipyard prior to January 2017 is located at the Shipyard or at the Port. For example, when the Port has requested reports relating to the maintenance and repair of the Shipyard’s drydocks and dredging activities at the Shipyard, such reports have typically been provided by the Shipyard. The Roybal Decl. re Remand Motion and Transfer Motion 4 c:\users\groyballappdata\local\microsoft\windows\temporary USDC Case No. 3:17-cv-1444-JSC internet files\content.outlook\sri704rk\01 186240 (3).docx.Case 3:17-cv-01444-JSC Document 27 Filed 04/20/17 Page 5 of 5 Port also has a substantial volume of its own records relating to the Shipyard’s operation over the years, including my own files. All of these Port records are located in San Francisco. I declare under penalty of perjury under the laws of the United States that the foregoing is true and correct and that this declaration was executed on April 2 17 at San Francisco, California. nee a LA ROYBAL Roybal Decl. re Remand Motion and Transfer Motion 5 c:\users\groybal\appdata\local\microsoft\windows\temporary USDC Case No. 3:17-cv-1444-JSC internet files\content-outlook\sri704rk\01 186240 (3).docxCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 1 of 168 EXHIBIT ACase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 2 of 168 b ~PORT= SAN FRANCISCO CITY AND COUNTY OF SAN FRANCISCO EDWIN M. LEE, MAYOR LEASE NO. L-15875 By AND BETWEEN THE CITY AND County OF SAN FRANCISCO OPERATING BY AND THROUGH THE SAN FRANCISCO PORT COMMISSION AND BAE SYSTEMS SAN FRANCISCO SHIP REPAIR INC., A CALIFORNIA CORPORATION PORTION OF PIERS 68 AND 70 AND SWL 349 MONIQUE MOYER EXECUTIVE DIRECTOR SAN FRANCISCO PORT COMMISSION LESLIE KATZ, PRESIDENT WILLIE ADAMS, VICE PRESIDENT KIMBERLY BRANDON, COMMISSIONER MEL MURPHY, COMMISSIONER DOREEN WOO Ho, COMMISSIONER BAE Lease (L-15875) 4/30/15 as\portias201411500146\0101237 L doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 3 of 168 TABLE OF CONTENTS Page 1. REPRESENTATIONS AND WARRANTIES OF TENANT .......cscscessesecsssceesesseenessenesesees 1 2. Sa Eero eee cere te elelahalahabdadadadadatetetetelahabababalsdadadutaletatehehelabahavndadatadatatatahahalahalasda 2 3. DEFINITIONS. .........sscssssssssssssesssssssssssssssecssesssessssesssesssssssesesssssesersssesssesssesssessssssvaseresenssesssenae 2 4. PREMISES; AS-IS CONDITION ..0....cceceececececes cscs cs eseeeeee cece tee sesceessesseeseeeteterereteteteeeececiee LL 4.1. Premises... 4.2. As-Is Condition... 43. Reversion Area: 4.4. BAE Master Plan ” 4.5. Right of First Offer; Buildings 111 and 60.0.0... eeeeeseeeeseeeeeeseseeresesneaeseeeeneae 13 4.6. Proximity of Development Projects ......ccessecesesessesessesessesessescsteasseraeeresssueesaeateneae 14 47. No Light, Air or View Easement .0.0.0.0.0.0.0.0.ccceceeeesecscececeeeceesesesesnseessececacaeaeaeeeseseen 14 4.8. | Unique Nature of Premises.. 4.9. Port's Rights Regarding Premises 4.10. Accessibility Inspection Disclosure ........cccceseeceseeseseeseereseseesesteeesteseseeaeereseseeseseneeneee 15 4.11. No Right to Encroach. 5. TERM OF LEASE; TERMINATION RIGHTS S.1. 5.2. Termination Rights occ ceesecccseseeseeneseeesesssessesescsessseeeeasseesseesuesneassneneesseente 16 5.3. Waiver of Relocation Benefits .............cecceseessecseseesesseesersneseeseesesseesesneesecsnesesseeenesees 17 6. Minimum Rent 6.2. Percentage Rett 0... ececceeseeseseeseeresesseacseecenssesussersesesecseerssesseaeseseessesesacseeeseeseeees 17 6.3. — Adjustments to ReNt........ccccceecessessecesesessssneseenesesessseresesesasesesseseacensasecasesesaseneasensaeaees 19 6.4. Rent Credit for Princess Agreement 6.5. Books and Records 6.6. No Joint Venture. GT AMM satatattadodsdedadstatatatatatababdedadededdadatatatatabchabalededadatedatatstabsbatataledudededadatatat otabstabdealde 6.8. — Default Interest... ecseesceseeseesessessessesseeeaneesessecsessserssssssnesseassessssessecsseneseseassnee 21 6.9. Late Charges/Habitual Late Payer 2.0.0... cccessecsesseeesscesecseresneesessessecaeereserenscaneenteese 21 BAE Lease (L-15875) 4/30/15 i ns\portias2014\1500146\0101237 L doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 4 of 168 6.10. Returned Checks .......c.ececceec cesses eecesesnessseeseeessesnessseesssessesnssesseasseasecesseseeassassensieanen 21 eA aINGt Tica tetetatacadadatatatulatatatabatdessdedadadedalatatslabahabdadudadstudatatalatatabatadadededadstatatatatatabsatta, 21 6.12. Additional Charges ........c.ccccscessesesssesesesessssseseeeesesessesessesesasenssseesacsneaserasesesesaneseeeeseoess 22 EXTENSION OPTION 7.1. Option to Extend Term 7.2. Rent and Other Terms SPECIFIC TENANT OBLIGATIONS. .0.0.eeececccsceceesteeseeesesessestsseeeesesesseeneeeseeacsneseeneneanes 23 8.1. Shoreside Power. 8.2. Building Baseline Conditions; Repair and Maintenance .........c.sseessesessecsseseeseeeesnee 25 8.3. Crane Demolition and Removal. 8.4. Pier 68 High Water Platform Demolition and Removal ............scesesseseesseseeeeeeeenes 26 8.5. | Replacement/Disposition of Drydocks ..... 8.6. Evaluation of Drydocks; Drydock #2 Capital Investment; Rent Credits 8.7. Transformer Removal and Disposal; Rent Credit: 8.8. | Demolition and Removal of Buildings 38 and 119; Rent Credi 8.9. Electrical Supply Relocation; Rent Credits 0... .ieecseesesseseeseeesneeresseerecaeeneaneeresnee 29 8.10. General Conditions for Rent Credits; Cap on Rent Credits 0.0... 29 SECURITY DEPOSIT ........ccccscesscesseesseesseesserssesssersseesseessesseesseessseesnessneeseeesesseessecaseessecsnecenee 30 9.1. Security Deposit... cece eeceeecseeceseseesesneesetenesteseeseseeeaeseseetsasssaeerestsneanseeeee ene dO. 9.2. Letter of Credit... 9.3. Environmental Oversight Deposit. USE OF THE PREMISES 10.1. Permitted Use 10.2. Prohibited Use... esses eeseeceeseeereeeeseeeseeeceneseeeeneetsnssrsenesaneacsesesesseesesansensneserees 32 10.3. Notice of Prohibited Use Charge... .ccccccceessenseceesesesnesesnesssesseenesesneesseseseseenss 33 COMPLIANCE WITH LAWS AND REGULATIONS ......0.ccccecessesseeseeseseeesneansneeeene dd PORT ACTING AS OWNER OF PROPERTY; REGULATORY APPROVALS: COMPLIANCE WITH CITY'S RISK MANAGER'S REQUIREMENTS, 12.1. Port Acting as Owner of Property... ccccceseeseeeeeeeeceeeresereseecaeececececeserecereeneaeeeaeess 34 12.2. Regulatory Approvals... 12.3. Compliance with City's Risk Manager's Requirements ..........0..0..:ecscesseeeeeeseeseeeeees 35 MAINTENANCE AND REPAIRS ......ccscsscescessecseessesssesessesseesseseeseteessnessesssenssesssecseaseeansenssees 35 13.1. Tenant’s General Maintenance and Repair Obligations ..........ccseceseeseeeeereeeeseeees 35 BAE Lease (L-15875) 4/30/15 ii ns\portias2014\1500146\0101237 L docCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 5 of 168 13.2. Intentionally Left Blank... 35 13.3. Maintenance Standards for Port Equipment 13.4. Modification/Removal/Disposition of Port’s Equipment 13.5. Port's Right to Inspect; Annual Inspections 13.6. Port's Right to Repair 13.7. Dredging 14. UTILITIES AND SERVICE Lett eS eerste cidadedadelatababebababababdededelodaletsbabatabssdesadodadatalsbalatel slat ade! 40 14.2. S€rVviCeS ...cecssscssecsssssscsssessesssesssecsvessvessserssecssecssscsssesssesseesssssssessesesecesecesecesecsvecssacssesssed 41 14.3. On-Site Renewable Energy .......c.cccecccccecsesesseseesesessescesesesecseeseseescsnsaeecesesesaceneseeeenesey Al 15. TMPROVEMENTS AND ALTERATIONS.......0.:ccscesesesesnsceeeesesessesneseseessseesseneeeseeasseenseened Al 15.1. Port Consent Required 0... eecceecececeseee cece eeesesecseeeeseseeeceseseeecseeesecssesesacseeseeneaeense! 41 15.2. Construction Requirement.........c.cccsecessessssesesresessessssesesesseseseescsesesesesesesaseneusenesesees 42 15.3. Improvements Part of Realty 0... eeeecsessecsesseesesseeseceeesseeneeeveneeaceneeasarssesaneeneanseeney 43 15.4. Removal of Improvement........cccccccsecesesseeeeeeesssecssesesesseersscsnenssesseerssesssereneseeeeneens 44 15.5. Removal of Non-Permitted Improvement ..........escceseseseseeseseesesneseeeesesseaeeneneeneneanes 44 L516. Sits total atabatctctdataeadodatatalattatabldeftadafateltabaabaadtdedslafadattatstatalacdhdbdafeldafatatetatatcdaldbt 44 15.7. Port's Alterations ..........ccssssecsssssessesssessesseseesesseesesssssessssessnesseaneesesssesessesssssesnessneenay 44 16. HAZARDOUS MATERIALS 1.0... .secsecce cece cece cesescsceeeceeeeeeecee seve sassecnsssecesecaneserecaecanenesseeees A: 16.1. Requirements for Handling... cece eesesesseseesestssesseseseeasseasesesnesesaeensseeseeaees 44 16.2. Tenant Responsibility 16.3. Tenant's Environmental Condition Notification Requirements .....0.....cceceeeseeeeeee 45 16.4. Requirement to Remediate..... ce eecccceccseseseseseeeeeeeeeeteneeseseseneseeeseeseeeneneneneaneneaseenee 46 16.5. Port's Right to Audit 2... eeeseceeeeeteeceeseeeeenesesaeeeseeeneeeseeeneeeecenseeseesseeesees! AT 16.6. Notification Of Asbest0S .......c.scecsesseesesssesessseeseessesesseeseeseeressnessssseesecssesssesesessesseeaneeneay AT 16.7. Notification Of Lead ........cccecesesseseeseeseessssessesseesessecsseeneseesussussneenessassesseeseceeseesnseneey 48 16.8. Stormwater Pollution Prevention... eeeeesecseeseeseesseenessessesseeseseeeeeesneeeees 48 16.9. Presence of Hazardous Materials ...........ccscessesssessseesesseesessesessessecssesssesesessesseseneenesy 48 16 OCSurvivad sl lddalodedladelatabslabersbabaadadedalelalabebelubsbsteadadsdedalalatelatessbabaads 49 17. ENVIRONMENTAL REQUIREMENTS .........cessceesceeseeseesseessessseesuessuessussucssecssecsseesseessed 49 17.1. Water Conservation Plan 17.2. Wastewater and Under-Pier Utility Maintenance Plan... seseseeeeeeeseeeeneaes 49 17.3. Performance Energy Benchmarking of Buildings ........0.00.0.c0cccseeceseeeseeeeereeesreeeeeeeee! 49 BAE Lease (L-15875) 4/30/15 iii ns\portias2014\1500146\0101237 L doc20. 23. Case 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 6 of 168 17.4. Hazardous Materials On or In Drydocks 17.5. Kiln Area Survey... 17.6. Maximize Use of Shoreside Power System 17.7. Green Demolition... 17.8. Sharing of Hazardous Materials Information 17.9. Pier 70 Risk Management Plan.. 17.10. Best Management Practices.... SOUTHERN WATERFRONT COMMUNITY BENEFITS AND BEAUTIFICATION 18.2. Workforce Participation. .....c.ccccsessscsssecsssessessenesessscceeenesessesesseeseasseeneecasesseacanenseeseanes 51 18.3. Other Requirements 20.0... eececesee ce ceseceeeeseceeeeseseeeeeseseseesneseeeeseenseeeseesseessesseeneeesees 51 INSURANCE 19.1, Required Insurance Coverage ..c.ecccssesessesesssesesssesseresesceresseteasseeaeersseseearsesseeseene 2 19.2. Claims-Made Policies ........cccscsesseesesscesssessenesseesesssesscssesesesissssensssseseesssecesesesneeenes 34 19.3. Annual Aggregate Limits... cceesseseseesssseeeenesnssceesseseesesnssceesstsnssesesaestssceneneensaeanes 54 19.4. Payment of Premiums ............ cece ce teceseceeceeeeeseeesecetesesecaeeescetercaeceeecesernseraueeeeeearente 54 19.5. Waiver of Subrogation Rights .........ceccsssssessesssesesseeseeereseeevecsesneesesueesesaverecereereaneesees 54 19.6. General Insurance Matters DAMAGE AND DESTRUCTION. EMINENT DOMAIN . 21.1. General 21.2. Partial Takings 21.3. Temporary Takings 21.4. Award; Waiver; Termination of Lease; Rent. INDEMNITY AND EXCULPATION .. 22.1. General Indemnity 22.2. Hazardous Materials Indemimity 0.00.0... ccs esceseecseenesesssscseseereasseeeeeseseeaseneseeneee 57 22.3. Scope of Indemmnities; Duty to Defend... eeececeeesseseeneseereseeeeseseceeereesseasseeeeenae 57 22.4. Exculpation and Waivet..i...cccsccccsseeessesessesescsecenesesessestssesteasssseerssesisssaneseenenesnes 57 DDS SUPVAV AL h lededelededebelebabchabsededededaledetetetabeeeherdedvdedededebelebabebabendedsdedadedatedelerabeherdedvd 58 TRANSFER, ASSIGNMENT AND SUBLETTING uuu... cece cecesseeseeeeeteaeseeseereseseaeseeneenae 58 23.1. Transfer to Affiliate oo... .csceseeeseesesseeseessesnessessesssessssessersssssseesssscssesssesssesesersneseeseee 58 BAE Lease (L-15875) 4/30/15 iv ns\portias2014\1500146\0101237 L doe24, 25. 26. Case 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 7 of 168 23.2. Transfer to Non-A ffiliate 0... eeesncesnessseesseasecacecsssesneaenanseseessarscseasenanenanen 58 23.3. Subleasing .........cssscsssesssssssssosssseesssessssesssseasssessnsensscenssvsensegsssoesssesssseesessessvssesesevee 59 23.4. Transfer Agreement and Sublease Requirement .............cccccscessesseeereseseserseeseeeesenees 60 23.5. Non-Compliance. 23.6. Reimbursement 23.7. 23.8. Acknowledgement ..0........ccsecesceesessesceceseesescseesesesteeeeeesesecaestesseueseseecseseseesesnsseeusee 60 23.9. Transfer Definitions ..........cccessessesseeseesseresseeesseeseaseessssessecsenessssesssesseessenssansseeanessees 60 DEFAULT BY TENANT......cccscscssssssessssssssesssessscssesssesssecssessvecssscaserssscsnscsssessecsassssresseserecenese 60 PORT'S REMEDIES .......cceccccccescsseseescsnesesscsceeseseeaesnesseuesesessesesesscseseeseeseaesesseeseresessssnesseseee 62 25.1. Tenant's Right to Possession Not Terminated ..0.........cccceceseeseeseeeneeesseesesntenrenneneees 62 25.2. Termination of Tenant's Right to Possession 25.3. Appointment of Receiver 25.4. Port's Right to Cure Tenant's Default 25.5. No Accord and Satisfaction 25.6. Waiver of Redemption ......c.cccsccssessseseresessenssnessereseseeneseseeneseeneseeeassneaeereseseeaeanensensee! 64 25.7. Habitual Late Payer... cece eceseeseesesesresessesceueaeencaeesesesaseeasesesscarsneesersseseeaesnesseused 64 25.8. Remedies Not Exclusive .....cesccssecsesseessssessesseesessessssssesssssessseesesssessssserecssessseseessnee 64 LITIGATION EXPENSES; ATTORNEYS! FEES ..........ccccscecececesescees cece este tees cate eeneneseeee es OF 26.1. Litigation Expenses........c.cccscecseesessesessesesressseseeuesesncseesesesasscaueseseassesseseseseeaseneseeucee 64 26.2. Appeals 26.3. In-house Attorneys. PORT'S ENTRY ON PREMISES 27.1. Entry for Inspection .........ceceeeeccceceecceeeseeceeseeeceeeseeecneeseeeeneaesesseeseneseasereessesaeseeesensee 64 27.2. General Entry... cccscsssscssesssesssssesseresesscsssesssssssssscsssescsssesssessssesssersssscsssessesnsnes 65 27.3. Emergency Entry... ceeeecccsessseseseeseseseseeeseeeeeeeeenssesesesssesesesseeeeeeenenenesueneaeeeeesee 65 27.4. No Liability. eee ce nee cscesceeseseaessesnsassesnssesesnsusseseeseeneassceseeseesecassueseneee 65 27.5. Nondisturbance ......cccccsecsseseseeessessecsesseeesessessessessserssssesersussesseesesssssesssesssasesrsnesessnee 65 SURRENDER AND QUITCLAIM. 0... cceccceccecececesescseseeeeceeeseeeseseseseeeneeseeeseeeneesasaneneneanaes 65 28.1. Surrender 28.2. Quitclaim 28.3. Abandoned Property 28.4. SUIVIVAL sees eeeecseeseesseeseesseesssesseeseessseneenessesseasserssessessssesssseassnensessserseeeeseesneeeed 66 BAE Lease (L-15875) 4/30/15 v ns\portias2014\1500146\0101237 L doe30. 31. 32. 33. 34. Case 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 8 of 168 HOLDING OVER 29.1. Terms of Holdover Tenancy 00... esestesesesseercsceesesecaeereseeneassecatereessaeaeseeeeensae 66 29.2. With Comsent ......cccccceseessesseseesessessessnessserssnesseesesssesscssssassnesssenseassnsesssasesssesesneaneenensee 67 29.3. Without Consent... 29.4. Renewal Letter of Credit CONTINUOUS OPERATIONS QUIET ENJOYMENT ...0..eccecececcssessecseeesesecseecesessesesesseeeeseseeeeessescsesesseuesssesecsueseseesesneseeaee 67 TAXES AND ASSESSMENTS ......cscssssesssecssecssecssecssecesecssecssecssecssecasesssstasessssarssssisasesseneaseess 67 32.1. Payment Of Taxes....cececesscsesessesssessseresesscseseneeesesessssesessaeerssesesseseaserssesecasaneseeseneenes 67 32.2. Possessory Interest Tax......ecceceesecceesessesrescseesesesseesssessacseseseesesnesseeesesesaceneseeeseeees 68 ITT NS aes ae en tra ent eer evr verve ttt area CITY AND PORT REQUIREMENTS 34.1. Nondiscriminatio: 34.2. Requiring Health Benefits for Covered Employe 34.3. First Source Hiring 34.4. Resource-Efficient Facilities and Green Building Requirements ...........cceseeeeeeees 71 34.5. Prohibition of Tobacco Sales and Advertising .....0......cccsceceeeeeeteesteeeeeaeeneeeeneneenes 71 34.6. Prohibition of Alcoholic Beverages Advertising .........c.csscsscessesseeeeresesneerseereensseenes 71 34.7. Graffiti Removal ............... 34.8. Restrictions on the Use of Pesticides 34.9. MacBride Principles Northern Ireland 34.10. Tropical Hardwood and Virgin Redwood Ban 34.11. Preservative-Treated Wood Containing Arsenic . 34.12. Notification of Limitations on Contributions .......0......eceeeeeereseceeeesseseeeeeeneteeeees 73 34.13. Sunshine Ordinance .........cececseseseesecseeseesessessessesssesssseesersussessssesssesssesssesssesesersneeensnse 73 34.14. Conflicts of Interest... cccecceccseeessessessneseessesesssesessessessesnesnseussnesnsssessessessessnsenesnes 73 34.15. 34.16. Prevailing Wages and Working Conditions.......0.ccccccseessseseesesseseeresesseeseeseeneseenes 74 34.17. Public Transit Information 0.0.0.0... eeseseesecaesecesecseeseesneeasseessesseeseeeeesessnseneanse 74 34.18. 34.19. Consideration Of Criminal History In Hiring And Employment Decision: 34.20. Local Hire 34.21. San Francisco Bottled Water Ordinance.........ccscecsececiessesseesecsessnessieesiesnsesnesnee 76 BAE Lease (L-15875) 4/30/15 vi ns\portias2014\1500146\0101237 L doe36. 37. 38. 39. Case 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 9 of 168 MINERAL RESERVATION. 76 NOTICES. MISCELLANEOUS PROVISIONS. 37.1. California Law 37.2. Entire Agreement 37.3. Amendments 37.4. Severability .. 37.5. Interpretation Of Lease oo... cecesesesessesecseseesseessesnsseseesesessesnsseenesssessssessesneasseesseesacanee 77 37.6. SUCCESSOTS ....ssessecseseseressrssessessecssssecsusssersenecsesnecnesseenssesssassneosecnserssnsesecseesesesesneaneenennee 78 37.7. Real Estate Broker's Fees ..........c.sccccecsesesseessessessesseesesseesesseseesnsescsnessessseserseesessneseesnse 78 37.8. Counterparts .........cccccscesesssseesesssesssssencsnsssseessesesesnsseeessssecsesesscenesssnssssesscsecassessessseenes 78 SiO AMOI cabal ledadadedatadalatabababobdededadadetadalatabslababahalesadadedadulatobebababaldaaadadedadlatatababalalalesade 78 37.10. No Implied Waiver ........ccccccesesesescesesessesresessesesesseeresesssasseseseesesssaseeseseraceneseeneseaees 78 37.11. Time is Of Essence ........csscessessssesseesseessesssesssesssesseesseessesssesessesnsesnsesnsesseseeaseessecssanssee 78 37.12. Cumulative Remedies ........cccccsessecseeseesnesesssesesssesssssesessessessseenssssssesseeresssesessnseessnee 78 37.13. Survival of Indemmities .......c0.ccccsescsessssesessseesseesseessesseesssessesseeeserssetsseeeserssersseeesessee 78 37.14. Relationship of the Parties 2.0.0... ceseceesesesseeeeseseeesseseeeaeseecsiesescaeeneeseneneanes 78 37.15. No Recording .....ccececcsecseesssccsescseesseresesesersesceessesnsecsesseseraeenssceneassecseerssesnserseeseensaeenas 79 37.16. Additional Written Agreement Required 0.0.2.0... sec eeeseeseeeeseeteesteeeeneseeeeneee TD LIMITATION ON DAMAGES 38.1. No Recourse Beyond Value of Facility 38.2. Non-Liability of City Officials, Employees and Agents ........ccsessseeeseereseeeeneees 79 38.3. Limitation on Port's Liability Upon Transfer... cceecseceseseeeseeeeeeeeeeneteneneneneeenes 79 TENANT ESTOPPEL CERTIFICATES ..0.0....cceceeseseseseseeeeseeceeeceeseseseeeseeeenesseecseasscaeeesneeee 79 EXHIBITS AND SCHEDULES EXHIBIT A-1 DESCRIPTION OF PREMISES EXHIBIT A-2,_ REVERSION AREAS EXHIBIT A-3_ PORT’S EQUIPMENT LIST AND LOCATION MAP EXHIBITB = PROJECTED BAE RENTAL PAYMENTS EXHIBITC = QUARTERLY VES! L UTILIZATION REPORT ExHiBITD ~—BAE MASTER PLAN REQUIREMENTS EXHIBIT E == VEHICULAR CIRCULATION AND PARKING PLAN EXHIBIT F — DELIVERABLES SUMMARY EXHIBITG —SHORESIDE POWER SYSTEM AS BUILTS EXHIBIT H = SUMMARY OF SECRETARY’S STANDARDS BAE Lease (L-15875) 4/30/15 vii ns\portias2014\1500146\0101237 L docCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 10 of 168 EXHIBITI = FORM QUARTERLY PERCENTAGE RENT STATEMENT EXHIBIT J) = FORM ANNUAL STATEMENT EXHIBIT K — SHORESIDE POWER REPORTING FORMS EXHIBITL — BASELINE REPAIRS ACTION LIST EXHIBITM — BEAUTIFICATION IMPROVEMENTS CONCEPT EXHIBITN — FoRM LETTER OF CREDIT EXHIBITO — ESTOPPEL CERTIFICATE SCHEDULE 1 PREMISES METES AND BOUNDS SCHEDULE 2 BUILDING INVENTORY SCHEDULE3 DESCRIPTIONS OF DRYDOCKS SCHEDULE 4 ASBESTOS NOTIFICATION AND INFORMATION SCHEDULES SUBSTRUCTURE REPORT(S) — PROVIDED UNDER SEPARATE COVER DATED APRIL 30, 2015 SCHEDULE 6 FEMA DISCLOSURE NOTICE SCHEDULE 7 LOCATION AND IDENTIFICATION NUMBERS OF PCB OIL-CONTAINING EQUIPMENT SCHEDULE 8 WEEKLY AND MONTHLY CRANE INSPECTION AND REPAIR PROTOCOLS FORM SCHEDULE 9 ENVIRONMENTAL REPORTS AND DOCUMENTS REGARDING HAZARDOUS MATERIALS BAE Lease (L-15875) 4/30/15 viii ns\portias2014\1500146\0101237 L docCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 11 of 168 BASIC LEASE INFORMATION 1. Lease Date: January 1, 2015 2. Lease Number: L-15875 3. Landlord or Port: City and County of San Francisco, a municipal corporation, operating by and through the San Francisco Port Commission 4, Landlord's Address: Port of San Francisco Pier 1 San Francisco, California 94111 Attention: Director of Maritime Telephone: (415) 274-0400 Facsimile: (415) 274-0494 3. Tenant: BAE Systems San Francisco Ship Repair Inc., a California corporation (“Tenant” or “BAE”) 6. Tenant’s Main Contact Bill Dunbar, General Manager Person and Mailing BAE Systems San Francisco Ship Repair Inc. Address: 70 Pier Bldg. 105 San Francisco, CA 94107-3193 7. Tenant's Billing Contact and | BAE Systems San Francisco Ship Repair Inc. Address: 70 Pier Bldg. 105 San Francisco, CA 94107-3193 8. Tenant's Emergency David Penaloza, Facilities Manager Contact and Address: BAE Systems San Francisco Ship Repair Inc. 70 Pier Bldg. 105 San Francisco, CA 94107-3193 Telephone: (415) 710-0633 Facsimile: (415) 558-8466 9. Tenant's Insurance Contact | Ellen Vinck, Director of Risk Management and Address: BAE Systems Ship Repair 2205 East Belt Street, Floor of Sampson Street San Diego, CA 92113 Telephone: (619) 557-4297 Facsimile: (619) 239-1751 10. Tenant’s Parking Contact David Penaloza, Facilities Manager and Address: BAE Systems San Francisco Ship Repair Inc. 70 Pier Bldg. 105 San Francisco, CA 94107-3193 (415) 710-0633 (415) 558-8466 Telephone: Facsimile: BAE Lease (L-15875) 4/30/15 BLI- 1 ns\portias2014\1500146\0101237 L doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 12 of 168 11. Contact Information for CT Corporation Tenant's Agent for Service 818 West Seventh St. 2nd Floor of Process: Lost Angeles CA 90017 12. Premises; Reservation of The Premises consists of the following portions of Piers Rights: 68 and 70: approximately: (a) 14.8 acres (645,370 square feet) of improved land; (b) 17.5 acres (761,690 square feet) of submerged lands at “Pier 68” and “SWL 349”; (c) a total of 183,466 square feet of building floor area from nineteen (19) buildings; and (d) Port’s Equipment, all as shown on the attached Exhibit A- I and A-3. Tenant accepts the Premises subject to the following matters of record: all existing liens, encumbrances, charges, conditions, covenants, easements, restrictions, and rights-of-way, including without limitation and reserving to Port and City (and their Agents) the right to enter the Premises upon reasonable prior written notice to Tenant to inspect, maintain, repair and restore or remove the sewer (in the approximate location as shown on Exhibit A-1 for informational purposes only) and to conduct other reasonably necessary work in order to address safety and/or preservation of the sewer. In no event will the activities conducted under this provision constitute an actual or constructive eviction of Tenant, entitle Tenant to any abatement or diminution of Rent, or otherwise relieve Tenant from any of its obligations under this Lease and Tenant hereby waives any and all Claims against Port, City and their Agents arising out of any inconvenience or disturbance from the activities. Port will provide reasonable prior notice and will work with Tenant to minimize disruption from work under this section. 13. Access: In connection with this Lease, Port hereby grants to Tenant the following rights: (A) access to Building 102 to allow Tenant to enter the building and to operate, repair and maintain electric utility infrastructure (including meters, transformers and other switchgear) located in Building 102 which serves the Premises; and (B) vehicular and pedestrian ingress and egress to Building 19 and other areas of the Premises in the form of anon-exclusive, non-possessory revocable license ("the License") for the area east of Building 19 as shown on Exhibit A-1 (“License Area”). This License shall expire, without further notice or action by the parties, upon the opening of the extension of 20th Street (after which the License Area will be part of the new public street). The rights provided by this License are subject to all of the terms and conditions of this Lease as if the License Area is part of the Premises, but Tenant agrees and acknowledges that, the License is non-exclusive, non- possessory and revocable and that Port may, in its sole and BAE Lease (L-15875) 4/30/15 BLI-2 \portias2014\150014610101237L docCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 13 of 168 absolute discretion, upon prior written notice to Tenant, revoke or terminate the License at any time prior to its expiration, without cause and without obligation to pay any consideration to Tenant. 14. Reversion Areas: In light of Port’s development goals for the Premises and vicinity, Port and Tenant agree that Tenant shall surrender certain portions of the Premises (each a “Reversion Area”) as shown in Exhibit A-2) to the Port prior to the Expiration Date in the manner described in Section 4.3. Tenant’s rent obligations shall not be modified or amended by Tenant's timely surrender of such areas to Port. 15. Length of Term: Twenty (20) years 16. Commencement Date: May 1, 2015 17. Anniversary Date: April 1st of each year of the Term 18. Expiration Date: April 30, 2035 19. Termination Rights: The parties’ termination rights are set forth in Section 5. 20. Right of First Offer: As discussed in Section 4.4 below, Tenant shall have a right of first offer to lease Building 6 and to continue to lease Building 111 after the relevant reversion date for Building 111. 21. Extension Options: As described in Section 7, Tenant shall have two (2) options to extend the Term for a period of five (5) years each (each an “Extension Option”) by providing written notice to Port no later than twenty-four (24) months prior to the Expiration Date. 22. Rent: As further described in Section 6, Rent shall be: (i) the annual Minimum Rent paid in equal monthly payments plus (ii) a Percentage Rent payment equal to 3.3% of annual Gross Revenues in excess of the Minimum Rent. Percentage Rent shall be paid quarterly in arrears and reconciled annually as provided in Section 6.2. Rent shall be adjusted annually and a market rate adjustment will be effective on the Tenth (10) Anniversary Date in accordance with Section 6.3 below. Exhibit B attached hereto shows the projected rental payments through 2025. BAE Lease (L-15875) 4/30/15 BLI-3 n:\portias2014\1 500146\01012371 doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 14 of 168 23. Initial Annual Minimum Rent: One Million Two Hundred Thousand Dollars ($1,200,000) 24. Security Deposit: Seven Hundred Sixty-Nine Thousand ($769,000) in the form of a letter of credit meeting the criteria in Section 9.2 below and subject to Port’s acceptance. The parties agree that this amount can be used for the purposes described in Section 9.1 and represents twice the anticipated monthly Minimum Rent in lease year ten (10) plus an amount of $500,000 based on an assessment of potential environmental risks posed by Tenant’s operations. The parties further agree that, if Tenant fails to comply with the Environmental Requirements in Section 17, Port may reassess the adequacy of the portion of the Security Deposit with respect to environmental risks. 25. Environmental Oversight Deposit: Ten Thousand Dollars ($10,000) — See Section 9.3 below. 26. Rent Credits: (A) Section 6.4 sets forth the terms and conditions under which Tenant may receive up to a maximum amount of $1.2 million of rent credits for certain improvements to Drydock #2 initiated under the Prior Lease in connection with the Princess Agreement. (B) Sections 8.6 through 8.10 set forth the terms and conditions under which Tenant may receive rent credits for up to: (i) twenty-five percent (25%) of the cost of new improvements to extend the useful life of Drydock #2 up to a maximum total amount of $2 million; (ii) fifty percent (50%) of the costs of Transformer Removal Activities; (iii) fifty percent (50%) of the costs of demolition and removal of Buildings 38 and 119; and (iv) fifty percent (50%) of the costs of electrical supply relocation necessitated by Port’s relocation of the power source for the Premises. The maximum total rent credit under (i) shall be two million dollars ($2,000,000) and the maximum total rent credit under (ii) — (iv) above shall be one million dollars ($1,000,000). Except for the rent credits described in (A), any rent credit that cannot be applied in the lease year in which it is incurred by Tenant because (i) the maximum annual rent credit of $300,000 will be exceeded in that lease year or (ii) the amount of the rent credit owed for that lease year exceeds the amount of Percentage Rent due for that lease year shall earn simple interest at a rate of 3.5% annually until the rent credit is applied. Notwithstanding any other provision of this Lease, the maximum rent credit available to Tenant is $4.2 million to be taken in a maximum annual amount of Three Hundred Thousand Dollars ($300,000) per lease year (“Maximum Annual Rent Credit”) against Percentage Rent over the Term (a maximum period of twenty (20) years). BAE Lease (L-15875) 4/30/15 BLI-4 n:\portias2014\1 500146\01012371 doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 15 of 168 Other than as set forth in Sections 6.4 and 8.6 through 8.10, Port shall have no obligation to provide, and Tenant shall not be entitled to, a rent credit, tenant improvement allowance or any other form of reimbursement, abatement or credit in connection with its obligations under this Lease. Any unapplied or unused portion of any rent credit shall remain the property of Port, and Tenant shall have no interest in said funds. Rent credits cannot be applied retroactively. Notwithstanding anything to the contrary in this Lease, in no event shall Tenant receive any rent credit in the event Tenant is in default, or an event has occurred which, with the passage of time or the giving of notice, or both, would constitute a default. Upon the occurrence of a Tenant Event of Default during a period in which Tenant is eligible for rent credits, Tenant’s right to apply any rent credit shall cease and shall not be reinstated until the Tenant Event of Default is cured. 27. Permitted Use: The Premises shall be used for day-to-day shipbuilding and ship repair operations on a twenty-four (24) hour seven (7) day a week basis and such uses that are ancillary, associated with and support such operations, including related non-retail commercial, industrial and/or maritime uses. Tenant shall seek Port’s prior written consent for any material new or modified uses. If Port approves such material new or modified uses, Port may impose reasonable conditions on such uses. Material new or modified uses include: a new non-maritime related business; a use that would require further environmental review; a new or modified use requiring new infrastructure, equipment and/or buildings; a new or modified use that poses potential new environmental risks: and a new or modified use that would significantly impact Tenant’s Gross Revenues. 28. Utilities: Port makes no guarantee about the availability of Utilities, and Tenant acknowledges that Utility capacity may not be available at the current levels throughout the Term. With respect to electric capacity, the parties understand that, given new commercial and residential developments in the immediately vicinity of the Premises, Tenant will be limited to its historic peak use of five and one-half (5.5) megawatts for the Shoreside Power System and one (1) megawatt for the rest of Tenant’s operations unless and until such time that additional capacity is created at the initiative of Port, Tenant or another entity. If Tenant desires to increase its electric usage above the historic peak levels stated above, Port will assist in coordinating between Tenant, other Port tenants and the provider to establish additional infrastructure and capacity. If Tenant’s planned electric usage increase will result in an BAE Lease (L-15875) 4/30/15 BLI- 5 n:\portias2014\1 500146\01012371 doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 16 of 168 increase to Tenant’s Rent under this Lease or will otherwise benefit the Port (in either case, as determined by Port), Port will meet and discuss possible cost-sharing for new electric infrastructure with Tenant on a good faith basis. Tenant is encouraged to participate in Port’s utility master planning for Pier 70. 29. Maintenance and Repair Obligations: Tenant’s obligations with respect to: (i) the Shoreside Power System (including payment of the Equipment Charge); (ii) building conditions; (iii) crane evaluation and removal; (iv) Pier 68 High Water Platform; (v) useful life and disposition of the drydocks (as detailed in Sections 8.5 and 8.6; (vi) PCB-containing equipment; (vii) Buildings 38 and 119; and (viii) electrical supply relocation are set forth in Section 8. Tenant’s general maintenance and repair obligations are set forth in Section 13. Specific standards for repair and maintenance of Port’s Equipment are set forth in Section 13.3. 30. Dredging: The parties’ obligations are set forth in Section 13.7. 31. Southern Waterfront Beautification and Community Benefits Program: Tenant shall implement the Southern Waterfront Beautification and Community Benefits Program described in Section 18. Failure to comply with the program is a material breach of this Lease. 32. Quarterly Vessel Utilization Report: No later than the date that is thirty (30) days after the expiration of each Calendar Quarter, Tenant shall submit a vessel utilization report to Port substantially in the form of the Quarterly Vessel Utilization Report attached hereto as Exhibit C, which includes the following information for the previous Calendar Quarter: (i) the name and number of days that each ship was in drydock or berthed at the Premises, (ii) whether the ship utilized the Shoreside Power System; (iii) the average and maximum daily number of employees employed by Tenant at the Premises, (iv) the number of contracts executed by Tenant for ship repair or shipbuilding work, and (v) the vessel name and dollar amount of each such contract. To the extent applicable, Tenant shall clearly mark the specific information contained in the Quarterly Vessel Utilization Report as “confidential/proprietary/trade secret” and, to the extent permitted by Law, Port shall keep such information confidential. 33. Planning: Master Planning. Tenant will cooperate with Port in its planning and implementation of the Port’s Pier 70 Master Plan. No later than the Second (2"™) Anniversary Date of BAE Lease (L-15875) 4/30/15 BLI-6 n:\portias2014\1 500146\01012371 doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 17 of 168 this Lease, Tenant shall submit to Port an update to BAE’s Master Plan dated July 16, 2008 for the Premises (including any Reversion Areas for which the Port has not provided a Reversion Area Notice) describing BAE’s long range planning and anticipated changes to building programs and business operations during the Term (including any Extension Term) that addresses Tenant’s proposed measures to address sea level rise/climate change and its marketing plan and satisfies all the terms and conditions of Exhibit D. At Port’s request, at any time, including in any Reversion Area Notice and by the date specified in any Reversion Area Notice, Tenant shall update its Master Plan to describe changes to its operations due to surrender of the relevant Reversion Area or to address other specific issues requested by Port. Vehicular Circulation and Parking Plan. Tenant has provided the attached Vehicular Circulation and Parking Plan (Exhibit E) which describes Tenant’s current on- and off-Premises parking capacity, uses, circulation and anticipated needs for employee, contractors, vendors and customers. At Port’s request in any Reversion Area Notice and by the date specified in any Reversion Area Notice, Tenant shall update its Vehicular Circulation and Parking Plan to describe changes to its due to surrender of the relevant Reversion Area. Good Neighbor Coordination. The Parties acknowledge that the nature of Tenant’s ship repair operations might generate noise and lights which can be heard or seen outside of the Premises. The Parties also acknowledge that the anticipated commercial and residential developments planned for Pier 70, and more specifically to the immediate south of the Premises, will bring visitors, residents and customers to Pier 70. In order to address potential issues that might arise, the parties agree to cooperate with each other, Port’s developers and other interested parties on developing good neighbor strategies to minimize the potential impacts of noise, sound, and light from Tenant’s operations during certain periods of the day and week. Such strategies might include Tenant’s advance community notice of when higher than usual noise, sound, or light are anticipated and developers’ mitigation of potential impacts through site and building design, orientation and soundproofing. 34. Replacement/Disposition of drydocks: No later than the Second 2") Anniversary Date, or sooner at the request of either party, Port and Tenant shall meet to collaboratively determine the feasibility of replacing, by the end of the Term or sooner, Drydock #2 and Drydock Eureka with similar drydocks, at least one of which is capable of servicing post-Panamax vessels and certain preferred marine vessels. If replacing either is feasible, the parties will work together to develop a plan, BAE Lease (L-15875) 4/30/15 BLI-7 n:\portias2014\1 500146\01012371 doeCase 3:17-cv-01444-JSC Document 27-1 Filed 04/20/17 Page 18 of 168 including possible financing, for replacing it. Any such plan will be subject to mutual agreement of the parties, further environmental review and Port Commission and/or Board of Supervisors’ approval, each in its sole discretion. Tenant shall cooperate in good faith with Port to address the ultimate dispositio