NYC PROJECT SITE SAFETY PROGRAM
Ltghar ).
B-rq-S\
\cc\F
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhotton
Proiect Site Sqfety Progrom
Project Sire Sofety Progrom
Tobel of Contents Poge
A. Progrom Obiectives. -- .4
B. Bosic Princioles ....""..5
C. ProiectSofetyOrgonizotiop---.-- ..."....."7
l. Site Sofety Coordinotor
2. Trode Controctor's Sofety Represenlotives
3, Generol Responsibilities
4. Trode Controctor Superintendent ond responsible supervisory employee
responsibilities
5. Trode Contrqctor Foremqn
6, Employees
7. Trode Controctor's Responsibility
8. Plozo Construction Corporotion Superintendent/Sofety Coordinotor
D. Generql Requirements-".----------.-.. ........._...._.1 5
E. Personol ProtectiveEquipmentRequirements.------------.-- .__..__________.1 6
F. Work Site Requirements ......._...__.."1 B
G. Hozord Communicqtion Stondord Requirements.--------- ...____...29
H. Sofetu Orientolion Proorom ....."....3 I
l. lnsuronce Comoonv -.-.-..---32
J. Fire Prevention------- ..........32
K. Sofetv Meetinos __._____._36
L. Group Tours ond Visitors--------- 37
M Procedures with Respect to ony Disoster or Emergency..-. ._..___._._..3B
N. Emergency Fqcilities ond Telephone Numbers. ...._........40
O. Substonce Abuse.--.------ 41
P, Non-Compliqnce ond Penolties 41
A. Return to Work..- ._.."....."....42
R. Conclusions .--.---.----..-42
NYC/NO SSM.Revised 4-1 9-1 1 2 lnitialBelow: PlazaConstruction Subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Mon LLC 7 W. 5l'r Street NY
Proiect Sq Progrom
Exhibits
A. Plozo Sofety Orientotion Troining Record.---.--.. 43
B. Disciplinory Progrom ond Fine Schedule.-.--- 45
C. Superintendent's On-Site lncident lnvestigotion Reporl---------..-.- 47
D. NY Stqte Employer's Repori of Work Reloied Accident lc-z)..... 48
E, Job Hozord Anolysis Formot).......- ........52
NYC/NO SSM.Revised 4-19-1 1 3 lnitial Below: Subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
Steok Mo LLC NW Steo 7W lst NY
Proiect Site Progrom
PROJECT SITE SAFETY PROGRAM
A. PROGRAM OBJECTIVES
Purpose
This Proiect Site Sofety Progrom ond Trode controctor's Sofety Requirements is estoblished by
Plozo Construction Corporotion in on ottempt to exercise oll ovoiloble meons of eliminoting or
controlling hozords ond risks ossocioted with the construction of the Proiect ond thus (o) prevent
personol iniuries, (b) prevent property domoge, (c) ochieve greoter efficiency, ond (d) provide
for public sofety, heolth ond welfore. Eoch Subcontroctor sholl beor sole ond exclusive
responsibility for sofety in oll phoses of their work. Nothing contoined herein sholl relieve such
responsibility, The primory gool estoblished for the Proiect is to sofely construcl the Proiect with
'ZERO ACCIDENTS"; totolly free from lost time injuries for the muluol benefit of the worker,
environment, ond community, The sofety gools ond obiectives estoblished for the Proiecl con
only be ochieved when everyone commits to perform their tosks sofely ond efficiently. This
commitment to ochieve these gools will result in both increosed productivity ond the
"PREVENTION" of lob reloted iniuries ond illnesses
2. To ochieve the foregoing purpose, oll trode conlroctors of Plozo Construction Corporotion sholl
formulote ond odminister their own written Sitespecific Sofety ond Heolth Progroms, Hozord
Communicotion Progroms ond Substonce Abuse Progroms for work ot the proiect. At o
minimum, the trode controctor's Sofety ond Heolth qnd Hozqrd Communicotions Progroms sholl
incorporote the most stringent requirements of oll referenced reguloiory requirements ond those
of this Proiect Site Sofety Progrom, the requirements of Federol OSHA 29CFR1926 ond the
requirements oll of the principles of the Plozo Conslruction Corporotion Proiect Site Sofety
Progrom. The Proiect Site Sofery Progrom (ihe "Progrom") incorporotes the prevention of
qccidentol iniury, occupotionol illness ond property domoge. Eoch Subcontroctor sholl provide
ond mointoin o sofe hozord free work ploce for their employees, for fiellow workers ond the
generol public.
3 The Progrom sholl ensure the involvement ond octive porlicipotion of oll Proiect employees by
requiring solety ond heqlth troining which will promote recognition of unsqle octs, the exposure
of hozordous chemicols, potentiol ond octuol hozords ond tl,e immediote corrective oction io be
token. All employees sholl be constontly owqre of their responsibility to work in o sole monner.
4 To ochieve the foregoing purpose, eoch trode controclor musl recognize thot it hos o controctuql
obligotion to perform their work using sofe methods ond to comply with the The Progrom, the
Occupotionol Sofety ond Heolth Adminisirotive Stqndords, ond oll other Federql, Stote ond
Locol Codes ond Regulotions.
NYC/NO SSM.Revised 4-19-1 1 4 lnitial Below: Plaza Construction
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhotton
Proiecl Site Sqfety Progrom
5 The effectiveness of the Progrom will depend upon the octive porticipotion ond wholeheorted
cooperolion of oll trode controctors, their sub-tier conlroctors ond oll supervisors ond
employees ond the coordinqtion of their efforts in corrying out lhe following bosic procedures:
. Plon oll work to prevenl personol injury, property domoge ond loss of productive
time ond to provide for public sofety,
Mointoin o system o[ prompt detection qnd correction of unsofe proclices ond
conditions.
Estoblish ond conduci on educolionol progrom to stimulote ond mointoin interesl
ond cooperotion of oll employees through:
necessqry correciive oction.
Require the lrqde controctor ond eqch trode contrqctor's superintendent ond lob
loremon to be fomilior with the provisions of the "Sofety ond Heolth Regulotions
for Construction" [Federol Register Title 29 Pod 1926) qnd Locol Codes, Lows,
Orders, Rules ond Regulotions, in porticulor Chopter 33 of the Administrotive
Code of the City of New York.
B. BASIC PRINCIPTES
l. All Project employees sholl comply with oli opplicoble Federol, Stote ond New York City Codes,
Lows, Orders, Rules ond Regulotions.
2. All trode controctors performing work on this Proiect sholl submit their Compony's Sofefy
Progrom, Hozord Communicotions Progrom ond Foll Proteetion Progrom in writing to lhe Site
Sofety Coordinolor prior to the siort of their work, As o minimum, the trode contrqctor's Sofety
Progrom sholl incorporote qll of the principles of the Plozq Construction Corporotion Progrom
ond sholl list the posilive steps the Subcontroctor inlends lo 'riilize for the prevention of occidents
to their employees, fellow workers, the generol public ond property of oll concerned. All Trode
coniroctors sholl ensure thot their employees know whot is contoined in ond ogree to comply
with their Compony Sofety Progrom.
3. Eoch subcontroctor sholl ensure thot their trode controctors ond suppliers, regordless of tier,
comply with the Subcontroctor's Compony Sofety Progrom qnd oll Federol, Stote ond Locol
Codes ond Rules ond Regulotions.
NYC/NO SSM.Revised 4-1 9-1 1 5 Initial Below: Plaza Construction Subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhorton. LLC (NYY .7 W. 5l " Street. NY
Proiect Site Sofety Progrom
4. All costs ond expenses incurred by Plozo Construction Corporotion or the Owner orising out of
Federol, Stote or Locol citotions, fines, penolties ond summonses resulting from the Trode
controctor's operolions sholl be bockchorged to the responsible trode contrqctor,
5, All trode controctors sholl provide their employees with oll oppropriote sofety ond personol
proteclive equipment ond weother protective geor required for the performonce of their work
ond enforce their use.
6. Subconiroctors will be monilored for complionce with the trode controctor's Sofety Progrom ond
implementotion ond opplicotion of their respeclive sofety progroms ot the work site, The
Construction Monoger ond Site Sofety Coordinotor will hove lhe outhority to stop work when
either site conditions ond/or work proctices present on imminent donger to life or heolth until
those conditions ond/or proctices ore corrected. For oll other conditions the subconlroctor will
be notified of ony non-complionce ond corrective oction required, This notice, when delivered
to the subconlroctor or their representotive ot the site of thb work, sholl be deemed sufficient
notice of non-complionce ond corrective oclion required. After receiving the notice, the
subcontroctor sholl immediotely toke correclive oction. lf the subconirqctor foils or refuses to
toke corrective oction promptly, o stop work order moy be ibsued. lf corrective meosures ore not
token immediotely no port of the time lost due to ony such stop work order sholl be mode the
subiect of o cloim for extension of time or increosed costs by ihe Subcontroctor. The
Construction Monoger or Site Sofety Coordinotor shqll not be lioble for ony domoges
experienced by the Subcontroctor due to the work stoppoge. Also, the Siie Sqfety Coordinqtor
moy recommend thot progress poyments ceose until the Subcontroctor is in full complionce with
oll opplicoble sofety ond heolth rules, slondords ond regulolions.
7. Eoch Subcontroctor sholl be held responsible for oll its lower-tier Subcontroctorrs complionce
with the project sofety requirements,
B, Eoch subcontroctor(s! sholl estoblish qnd enforce on effective disciplinory progrom.
Subcontroctors ore required to discipline ond/or dismiss employees who violole the Progrom's
regulotions. This includes oppropriote disciplinory oction for serious violotions such qs [oll
protection or substonce obuse, repeoted violotions, or the refusol to follow sofety ond heolth
ru les.
L Any Competent Person who is ossigned to identify existing ond predictoble hozords ond
outhorized to eliminote them thqt foils to perform this duty sholl be subject disciplinory octions
os outlined in this progrom.
I O. The subcontroctor shqll not receive odditionol poyment or reimbursemenl lor sofety ilems ond
procedures which hove been identified os required bythe trode conlroctor's Sofety Progrom,
I L Foilure to comply with the conlrocl sofety requirements will be considered os non-complionce
with the controct ond moy result in remediol qction including withholding of progress poyments
due the subcontroctor ond/or terminotion of the subcontroctor from the site,
NYC/NO SSM.Revised 4-1 9-1 1 6 lnitial Below: Plaza
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
Monh C NYY Steo 7 W. 5l'' NY
Proiect Sile Sofety Progrom
12. ln the event lhe work or ony portion thereof is shut down by either on outside ogency or
becouse of on unsofe condition os determined by the Construction Monoger, the Subcontroctor
responsible for the shut down sholl beor the totol cost of lhe shut down,
.l3.
ln no cose sholl the Subcontroctor be relieved of overoll responsibility for complionce with lhe
requirements of federol, stote ond locol sofety ond heolth lows for oll work to be performed
under the contrqct.
C. PROJECT SATETY ORGANIZATION AND RESPONSIBITITIES
I . Site Sofety Coordinotor, Designoted by Plozo Construction Corporotion. On Proiects thot do not
hove o dedicoted Sofety Coordinotor, the Proiect Superintendent will be responsible for the
duties outlined in Chopter 33 of the New York City Building Code.
2. Trode controctor's Sofety Representotives - Eoch trode conlroctor sholl oppoint o responsible
supervisory employee or competent person os its Proiect Sofety Representolive, who is
occeptoble to the owner ond construction monoger.
3. lt is the responsibility of every trode controctor; superintendenl, loremon, employee,
subcontroctor, ond vendor lo corry out the policies, stondords ond procedures os outlined in the
Progrom os follows:
4. Trode Coniroctor Superintendent ond responsible supervisory employee responsibilities ore os
follows:
. Trode coniroctors sholl designote o resident Sofety Representotive (Competent
Person os defined by OSHA) who sholl, omong other things:
Communicotion Progrom ond oll Federol, Stqte ond Locol Codes, Lows,
Orders, Rules ond Regulotions.
obility to recognize ond correct potentiol ond octuol hozords ond unsofe
ocls.
controcior's job foremon with written minutes copied to the Site Sofety
Coordinotor.
NYC/NO SSM.Revised 4-1 9-1 1 7 lnitial Below: Plaza
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steak LLC (NYY 7 W. 51S NY
Manhattan, Steak), Street,
Project Site Safety Program
> Meet on a weekly basis with the Site Safety Coordinator to ascertain that
their Company is complying with Chapter 33 provisions, when applicable.
> Report all safety-related matters and give copies of all Permits, Licenses,
Certificates of Fitness, etc. to the Site Safety Coordinator.
> Be responsible for the Plaza Construction Corporation Accident Reporting
Requirements hereunder. Provide Superintendenent's Incident Investigation
Report for all accidents (See Exhibit C).
> Review the accident summary reports to keep informed of the project
accident record and assist in appropriate action when accident trends are
unfavorable.
> Review serious accidents personally to satisfy oneself that causes are being
investigated and proper corrective action taken.
> Plan and execute so as to comply
all work with the stated objectives of this
Program and the Subcontractor's Safety Program.
> Provide and enforce the use at all times of the personal protective equipment
specified in U.S. Department of Labor "Safety and Health Regulations for
Construction"
and any applicable State and Local Codes, Laws, Orders,
Rules and Regulations such as hard hats, safety shoes, eye protection, etc.
> Take immediate action to correct unsafe practices or conditions when
discovered.
> Immediately report to the Site Safety Coordinator any unsafe conditions or
practices or violations of job security which are not within the
Subcontractor's jurisdiction.
> Review with Trade contractor's job foremen, periodically, their
responsibilities.
> Obtain, maintain and deliver to Plaza Construction Corporation copies of all
Material Safety Data Sheets for all hazardous substances delivered to the
Project and otherwise supervise Trade contractor's Hazardous
Communication Program in accordance with the Hazard Communication
Standard set forth in OSHA regulation at 29 CFR 1910.1200 and 29 CFR
1926.59 (see Part Ill, C, 4.0).
> Familiarize oneself with the safety program and ensure its effective
application on the project.
NYC/NO SSM.Revised 4-19-11 8 initial Below: Plaza Construction subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhotton, LLC (NYY Stesk),Zlry.llj_qll99l_llY
Proiect Site Sofety Progrom
support in the .:dminisirotion of sofety
octivities.
the proiect ore in complionce with Federol, Stote, Locol ond Compony
policies.
5, Trode Controctor Foremqn: ln oddition to the Trode Controctor's supervisory/superintendent
responsibilities, it is the responsibility of the foremon who is in direct control of the employees on
the lob qnd is in frequent qnd close interoction wilh the employees to corry through on eoch of the
following dulies:
. lnstruction to employees of sofe work proctices qnd work methods ot the time the men
ore given work ossignments.
. See thot employees hove qnd use the proper protective equipment ond suitoble lools
for the iob,
. Continuously check to see thot no unsofe proclices or. ore ollowed io exist
on ony port of their work.
"oni',,on,
Acquoint employees with oll opplicoble sofeiy requirements ond see thot they ore
enforced.
Moke o full investigotion of qccidents to determine focls necessory to toke corrective
qction ond promptly complete the Supervisor's Accident lnvestigotion Report (See
Exhibir C).
Hold weekly "lool box" sofety meetings with his/her workers to:
occident couses
See thot on iniured person(s) receives prompt first-oid medicol ottenlion, See thqt qll
iniuries ore properly reported ond treoted,
NYC/NO SSM.Revised 4-1 9-1 1 9 lnitialBelow: PlazaConstruction Subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhottqn, LLC INYY Steokl, 7 W. 5l't Street, NY
Proiecl Site Sofety Progrom
I Correct or report immediotely to Plozo Construction Corporetion's iob superintendent
ony observed unso[e conditions, proctices or violqtions of iob sofety.
Provide on orientolion to eoch employee prior to lhe stort of work,
Pre-plon non-routine work for sofety.
Attend, porticipote in sofety meeting ohd initiotives.
Teoch eoch employee obout the hozords on his lob ond how to ovoid them. Teoch
employees thot occidents ore cqused ond con be prevented,
lmport to eqch employee ihe understonding thot o violotion of on estoblished sofety
rule will not be loleroted ond disciplinory oction will be token if not odhered to.
Ensure needed sofety equipment,/protective devices ore provided ond used for eqch
iob.
Toke prompt corrective oction whenever unsofe condiiions ond octs qre noied.
lnvestigote ond find the couse of oll occidenls even those thot result in o minor iniury,
I Continuolly conduci sofety opproisqls of one's work oreo including o coreful check of
oll new equipment before it is ploced into operotion.
I
Give full support to oll sofef octivities ond procedures.
Continuously see thot no unsofe proctices or conditions ore ollowed to exist in the
work zone.
' Set o good exomple to his/her fellow employees.
. Check first oid supplies locoied in shonties or gong boxes ot leost weekly ond
reploce oll expended items os needed.
6. Employees: An employee's responsibility is primorily to work in o sofe ond efficient monner. Listed
below ore some of the principol duties of eoch employee:
' To follow oll estoblished sofety regulotions.
. To osk questions of his foremon to ensure he understonds tosks given to him,
' To stoy olert ond free of iniuries while working,
. To repori ony unsole condiiion to his foremon when such o condition is encountered.
NYC/NO SSM.Revised 4-19-1 1 10 lnitialBelow: PlazaConstruction Subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
Steok Mo LLC NW Steo 7 5l'r Slreet NY
Projecl Site Progrom
. To report the slightest iniury to his foremon in person qnd to seek first oid core
immediotely.
7 . Trode Controclor's Responsibilities
. All Trode controctors dre hereby notified thoi they or9 required to obey ond
implement the Siie Sofety Coordinotor's recomendoiions ond directives reloting to
the Progrom.
. As o condition of their controcl, oll subcontroctors sholl submit to the
Construction Monoger's Site Sofety Coordinotor or designee:
of Controct Aword. lPre-work acceptonce is required,l
(Pre-work occeptonce i s required.l
Pre-plonning for high risk octivities, os requested by the Construction Monoger
or Site Sofety Coordinotor, wiih input from the field stoff who will be doing the
work,
A list of Hozordous Substonces brought to the site
A copy of qll citqtions ond,/or worning of sofety violqtions received from ony
slote or federol iurisdiction, ogency, insuronce compony, or by ony of its sub tier
coniroctor orgonizotions within the some workdoy thot it is received.
The Trode Contrqctor is responsible for the sofety ond heolth of employees,
subcontrqciors, visitors, ond vendors in occordonce with Stqte, Locql qnd Federol
regulotions, ond the Controcl Documents. Eoch Subcontrocior is required to
esiobllsh ond submit for review o written Sofety ond Heolth Plon thot includes
detoils commensurqte with the work to be performed. The Subcontroclor's Sofety
ond Heolth Plon must cleorly describe the subcontrqctor's commitments for
meeting its obligotions to provide o sofe ond heolthful work environment for its
employees ond subcontroctor employees, to protect vendors, visitors, ond
members of the generol public. The Subcontrqctor's Sofety ond Heolth Plon sholl
reference Federol OSHA stondords, ond ony oiher rules or regulotions opplicoble
to construction octivities.
NYC/NO SSM.Revised 4-19-i 1 11 lnitial Below: construction subcontractor
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY k Monhotton LLC 7 I't Street NY
Proiect Site Sq Progrom
Eoch Subcontroctor is required to designote on on-site Sofety Representqtive who
is chorged with responsibility of on-site sofety monogemenl. At q
minimum the
sofety representotive sholl meet the requirements of o "competent person" os
defined by OSHA for oll phoses of construction. On-site sofety representqtive
must be oppr,oved by the Construction Monoger,
Eoch Trode controctor's designoted Sofety Representotive sholl be required to
meet on o weekly bosis with the Site Sofety Coordinotor to qscertoin thqt the
Trode controctors ore complying wiih The Progrom.
All Subcontroctors sholl require its trode controciors to comply with oll
requiremenls ond responsibilities set forth in this Sofety Progrom os to their
respective operotions the Subcontroctor sholl be responsible for their
non-complionce herewith.
Permqnent records sholl be mointoined by the Subcontroctor, os required by low,
describing oll Hozord Communicotion Progrom troining.
8. Plozo Construction Corporoti on-Su peri ntendent/Site Sofety Coord i notor
. The following describes the octivities of the Site Sofety Coordinotor:
The Site Sofety Coordinotor sholl personolly inspect the site doily to
determine thot lhe Proiect meets the requirements of Chopter 33 ond OSHA
Stondords.
I ln the event thot ony violotions of the Site Sofety Prngrom ore discovered by
the Site Sofety Coordinotor, the Site Sofety Coordinolor sholl odvise the
person or persons responsible for creoling the violotions thot corrections of
the observed violotions must be mode immediotely.
! The Site Sofety Coordinotor sholl provide odvice qnd recomendotions in
mointoining complionce with the Plozo Construction Corporotion Sofety
Progrom in the following octivities:
of this Progrom.
superstructure phose, ot which oll supervisory stoff of the Subcontroctors
ond trode controctors ore required to be present.
Loss Prevention Speciolists, Municipol Complionce Officers ond
Authorized Consultqnts.
NYC/NO SSM.Revised 4-1 9-1 1 12 lnitlal Below: Plaza Construction
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
k Monhotto LLC 7 I'r Street NY
Proiect Site Sq Progrom
substondqrd sofety conditions reported or observed.
Stondords ond oll opplicoble Stote ond Locol Lqws,
Review ond provide guidonce, os required, te, odvise subcontroctors'
personnel in the plonning ond execution of oll work so os to comply with lhe
stoted obiectives o[ the Progrom,
Ascertqin thot permits for sidewolk sheds ore in effecl os required by Chopter
33, of the Building Code 3302.6
Ascertoin the opprovol of drowings of the sidewolk shed ore ot the site qs
required by Chopter 33of the Building Code 3302.6.3.
Unless the designer qnd supplier of the sidewqlk shed qssumes such
responsibility, oscerloin thcri such sheds hove been inspected by P'E. of
record.
Ascertoin thot certificotes of opprovol, operotion, ond on-sife inspection for
oll crones derricks, or coblewoys hove been obtoined os required by
Chopter 33 of the Building Code 3319
Ascertoin thot sidewolk sheds remoin in ploce until the structure is enclosed,
oll exterior work completed, the sosh is glozed obove the second story, the
exterior of the focode is cleqned down, qll oulside hondllng of moteriol,
equipment qnd mochinery is completed ond dismontling of moteriol hoist or
tower or climber crone or the use of o derrick ond"their removol obove the
second story is compleied. Noie: BEST Squod opprovol is needed prior to
removol of o sidewolk shed on o site sofety proiect,
Ascertoin thot communicotion hos been orronged omong oll responsible
porties when crone ond derrick loods ore cqrried beyond the perimeter of
the building, ond when tower or climber crones ore being dismontled or
erected,
Ascerlqin thot required permits hove been obtoined from Deportment of
Tronsportotion for ony street,obstructions or closings.
lnstitute procedures for the preporotion of supervisory investigotion reports on
oll occidents. This form will be completed by Subcontroctor's supervisory
personnel.
NYC/N0 SSM.Revised 4-1 9-1 1 13 lnitial Below: Plaza
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
Steok Monhotto tLC 7 lst NY
Proiect Site Sq Progrom
Review occidents ond odvise on woys to institute corrective oction ond
discuss ot scheduled Sofety Meetings to prevent recurrence.
Review toolbox meeting reports submitted by iob foremen ond tqke necessory
oction to see thot required periodic group toolbox meetings ore held by the
iob foremen.
Coordinoie octivities of sofety ond loss prevention with engineers, consultonts
ond trode controctors obtoin opprovol to institute necessory steps to
implement complionce with opproved recommendotions.
Mointqin the hot line number qt the site for telephoning ihe Deportment of
Buildings ond the Deportment of Tronsportotion when it is necessory to close
off o streel for sofety purposes,
Confirm thot oll Deportment of Buildings signoge is prominenily disployed ot
the construction site, os required by Chopter 33 of the Buildings Code.
Notify the Deportment of Buildings when informed of on emergency
Assist in inspections of the iobsite with the New York City Fire Deportment.
The following regulotions ore listed for the purpose of odvising
subcontroctors of other regulotory requirements thot will be reviewed ond
monitored by the Site Sofety Coordinotor:
netting (horizontol ond verticol), Seclion 27'1021 ((o) (6), 1.27-1021 (o)
17]r,1,27-1092 (o) (l), (2).
by Section 27-1018 of the Administrotive Code,
by Section 27-1035 ((l ) (0),
Know Low") os sel forth iri OSHA regulotions ot 29 CFR l9l0 l2OO qnd
1926.59 including; (o) mointoining copies of oll Moteriol Sofety Doto
Sheets in o centrol locotion ond mqke sqme ovoiloble for review ond
inspection io personnel exposed to hozordous substonces on the Proiect
{b) post required notices for oll trode controclors, employees ond
personnel on the Proiect; (c) periodicolly survey work oreos, contoiners
ond moteriols to deiermine thot they ore properly lobeled qnd thot
MSDS's hove been provided, if required; (d) mointoin ond post o list of
NYC/NO SSM.Revised 4-'l 9-1 1 14 lnitial Below: Plaza Construction
FILED: NEW YORK COUNTY CLERK 09/16/2019 02:15 PM INDEX NO. 158327/2013
NYSCEF DOC. NO. 400 RECEIVED NYSCEF: 09/16/2019
NYY Steok Monhotton, LLC ( NYY Steokl. 7 W.5l't Street, NY
Project Site Sofety Progrom
known hozordous substonces on the Proiect; (u) communicote
informotion to oll Plozo Construction Corporotion employees ond
employees of other employers regording known hozordous substonces;
ond (f) determine thot other Subcontroctors ore complying with those
reinforcements set forth in Port I I I , C, 4,0 hereinofter regording the
Hozordous Communicotion Stondord.
D. GENERAL REQUIREMENTS
The following requirements ore o guide, but sholl not be construed os the complete list of pertinent
obligotions. The subcontroctors (ond their employees, ond their trode controctors ond their employees,
where opplicoble) sholl:
l. Comply with the duties of employers os set forth in the "Occupotionol Sofety ond Heolth Act of
1970' ("OSHA"), regulotions thereunder ond similor stotutes, lows, codes, rules, orders ond
regulotions ond regulotions of the Stote ond City of New York ond their deportments ond
ogencies.
2. No smoking is ollowed on Plozo Construction Corporotion Proiects.
3. lnform employees of their duties under "OSHA" ond to uniformly enforce complionce with those
duties.
4, Educote employees os to the sofeguords necessory to control potentiol work ploce ond sofety
ond heolth hozords.