FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
Exhibit D
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
SPECIFICATIONS
FOR
BOILER WELDING AND REPAIRS
AT
VARIOUS DEVELOPMENTS LOCATED IN
THE BOROUGH OF BROOKLYN
I- GENERAL
A. Terms and Conditions Drawings
, (if any), to any of the forgoing, all of which are hereby
made part of this Contract.
B. The Contractor shall have in possession a Valid Certificate of Authorization for the use of
the
Inspectors, at the time of bid.
C. The Administering Department for this Contract is the
Operations Department, 23-02 49th Avenue 3rd Fl., Long Island City, NY 11101.
Telephone no. (718) 707-8687.
D. The Contractor shall complete the work within Two (2) Year from the commencement date
The Authority will have the sole
option of extending the term of this contract for an additional one (1) year.
II - SCOPE OF WORK
The Contractor shall provide all necessary labor, supervision, material, scaffolding and
equipment to perform boiler and hot water generating tank repairs as hereinafter described.
rep
V of these
Specifications.
1. General Welding Repair is described in Section IV (A) of these Specifications.
2. Welding Repairs in each Boiler Room, for less than twelve (12) linear inches, shall be paid
for on a per inch basis according to the Unit Price for that category. Circumferential Weld
Joint Repairs shall be considered on a linear inch basis.
3. Welding Repairs in each Boiler Room, starting from twelve (12) linear inches but not
including thirty-six (36) linear inches, shall be paid for on a per linear inch basis according
to the Unit Price for that category. The entire welding repair will be paid for in one unit
price category.
4. Welding Repairs in each Boiler Room starting from three (3) linear feet and greater shall be
paid for on a per foot basis according to the Unit Price for that category.
Specifications for Boiler Welding and Repairs Page 1
Confidential NYB001222
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
5. All Welding Repairs where fractions of inches are involved shall be paid for to the nearest
whole inch. All Welding Repairs over three (3) linear feet, where fractions of a foot are
involved, shall be paid based on linear feet and fractions of a linear foot, on the per foot
single rate basis.
1. Replacement of Boiler Tubes is described in Section IV (B) of these Specifications.
2. Each tube replacement shall be paid for according to the tube length and diameter on a per
tube basis according to the Unit Price for that category. In the event that tubes of differing
lengths or diameters are replaced, the price for each tube length and diameter shall be
prorated based upon the total number of tubes of all lengths replaced. For example, if the
replacement consists of replacing two (2) ten foot long by 3 inch diameter tubes and three
(3) twelve foot long by 3 inch diameter tubes in a boiler room, the price for each of the ten
foot long tubes shall be at the Unit Price for 4 to 6 ten foot by 3 inch diameter tubes and the
price for each of the twelve foot tubes shall be at the Unit Price for 4 to 6 twelve foot by 3
inch tube.
Replacement of Staybolts is described in Section IV (C) of these Specifications and shall be
paid for in accordance with the applicable Unit Price.
1. Boiler Shell, Water Leg and Mud Ring Plate Replacement are described in Section IV (D)
of these Specifications. Work shall be paid for on a per square foot area basis of plate
material replaced, after combining all of work in any given Boiler Room. Any fraction of a
square foot remaining shall be paid for as a whole square foot.
2. Provide new bottom blowdown to each new plate if required. The size and number of the
bottom blowdown shall be the same as the existing.
Front Fire Box Seam Replacement is described in Section IV (E) of these Specifications, and
shall be paid for a per replacement basis according to the Unit Price regardless of the number
of such replacements required in any Boiler Room. The foregoing sentence is qualified by
the provisions of Note 9 (after the Unit Prices) of the Form of Proposal.
Handhole Cover and Surrounding Plate Replacement are described in Section IV (F) of these
Specifications and shall be paid for in accordance with the applicable Unit Price.
Manhole Cover and Ring replacement is described in Section IV (G) of these specifications
and shall be paid for on a per replacement basis in accordance with the unit Price, whether
Specifications for Boiler Welding and Repairs Page 2
Confidential NYB001223
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
the replacement is in a Tank Room or in a Boiler Room, and irrespective of the number of
replacements required.
Neckpiece replacement, tube support and Strap replacement, and Deflector replacement for
Hot Water generating Tanks are respectively described in Sections IV (H), IV (I) and IV (J)
of these Specifications, and shall be paid for in accordance with the applicable unit Prices.
NOTES***
1. The unit p na
per Boiler Room basis. The unit p
shall be based upon a per replacement basis.
2. Where boiler or hot water generating tanks are not made available to the Contractor within
30 minutes after his arrival in the Boiler Room or Tank Room, the Contractor shall have
the right to leave the Development after making another appointment with the
Development Property Maintenance Supervisor for the required repairs, in which event the
Contractor shall be entitled to the guaranteed minimum compensation for such trip.
However, such minimum compensation shall only be paid where the failure to make boilers
or hot water generating tanks available is in no way due to any fault of the Contractor, and
where the Contractor arrives pursuant to a prearranged appointment.
III. EXECUTION
A. Project Management and Coordination
1. The Administering Department
a. -02 49th Avenue 3rd
Fl., Long Island City, NY 11101. Telephone No.: (718) 707-8687.
b. Correspondence and Communication with the Department Administering this
contract shall be through the Project Administrator assigned to this contract.
1) Mail All mail correspondence shall be address to - New York City Housing
Authority, -02 49th
Avenue 3rd Fl., Long Island City, NY 11101. Telephone No.: (718) 707-8687.
c. Start of work - The Department administering this contract shall issue the Notice to
Proceed, at the pre-start meeting.
2. Project Procedure and Service/Utility Interruption
a. Obtain approval for the Contract Progress Schedule from the Project Administrator:
and Development Property Manager or Property Maintenance Supervisor.
b. Allow ingress and egress to the apartment building entrance and exits, for Authority
tenants, staff, and visitors, during performance of work.
Specifications for Boiler Welding and Repairs Page 3
Confidential NYB001224
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
c. Work without disruption of utility services (electric, gas, and steam services as well
as water and sewer connections) to any portion of the existing building, unless
Contract Administering Department.
d. When an authorization to temporary shut off any utility serving the building is
requested and granted the below directives shall be followed:
1) Notify NYCHA Administering Department a minimum of ten business
days in advance.
2) Notify and make arrangements with the Utility Company.
3) Provide, distribute, and post notices of any service interruptions or other
inconveniences to notify the tenants as required by the Contract Inspector, the
Development Property Manager and Property Maintenance Supervisor.
IV - DESCRIPTION OF WORK
A. General Welding Repairs
1. Defective weld seams or cracks in boiler walls shall be repaired by the Contractor by
flame cutting or grinding the defective area to clean, defect-free base metal. Should
the gouging, cutting or grinding extend completely through the base metal, the edges
both visually and with Liquid Penetrant Examination (dye-check) to assure that all
existing cracks or defective material has been removed prior to welding. The extent of
the repair shall be determined by the Authority. See NYCHA Contract Drawings 3-
852 and 3-853.
B. Replacement of Boiler Tubes
1. The Contractor shall remove defective fire tubes and replace the same with new boiler
tubes. The new boiler tubes shall be electric resistance welded carbon steel which shall
conform to the latest requirements of ASME Section II, designation SA-178 Grade A
or seamless carbon steel which shall conform to ASME Section II, designation SA-
192. All tubes shall carry identification markings legibly stenciled as required by the
ASME Code. A copy of the Mill Test Report from the tube manufacturer shall be
presented to the Authority.
2. New tubes less than four (4) inch diameter shall be twelve (12) gauge and four (4) inch
diameter tubes shall be ten (10) gauge. New tubes shall be of correct diameter to
properly fit in the tube sheets. The use of ferrules shall not be permitted. Ends of all
new tubes shall be properly expanded and flared into place in the tube sheets without
cracking or abnormal reduction in the thickness of the tube walls. New tubes shall be
of correct length to allow for perfect beads, which shall be uniform in size on all tubes.
C. Replacement of Staybolts
1. The Contractor shall remove defective staybolts and replace the same with solid round
metal ASME SA-36 or equal welded in place on each end in accordance with NYCHA
Contract Drawing 3-778. The projection of the staybolt into the internal stayed surface
Specifications for Boiler Welding and Repairs Page 4
Confidential NYB001225
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
exposed to products of combustion shall not exceed a maximum of 3/8 inches. The
ends of the staybolts projecting beyond the internal or external stayed surfaces shall
not be covered with weld metal. Replacement of staybolts shall be in accordance with
the requirements of the ASME Boiler and Pressure Vessel Code and the National
Board Inspection Code, latest editions. See NYCHA Contract Drawing 3-778.
NOTE***
Should the replacement of staybolts necessitate the replacement of boiler shell plate,
Section IV (D) of these Specifications shall become mandatory.
D. Boiler Shell Water Leg and Mud Ring Replacement
1. The Contractor shall remove by flame cutting all defective areas of boiler shell, water
legs, and mud rings, as designated by the Authority. The new plates shall as a
minimum, be equal to the thickness of the original plate. See NYCHA Contract
Drawing 3-854. The new plate shall be cut and fitand rolled if necessary to exactly
match the contour of the plate segment removed. The new plate shall conform to the
requirement of the ASME Boiler and Pressure Vessel Code and shall be SA 285 Grade
C or equal. All staybolts within the area of the material replaced shall be removed and
replaced with staybolts located and sized according to those used in the original boiler
design.
2. The contractor shall provide bottom blowdown to the new plate if required. The new
blowdown shall be equipped with threaded connection into the new plate, a ball valve
for quick opening, and all required fittings. All valves and fittings shall be the line size
and shall be the same sizes as the existing.
E. Front Firebox Seams Replacement
1. Defective front firebox seams or cracks shall be repaired by the Contractor by flame
cutting or grinding the defective area to clean, defect free base metal. Should the
gouging, cutting or grinding extend completely through the base metal, the edges of
both visually and with Liquid Penetrant Examination (dye-check) to assure that all
existing cracks or defective material has been removed prior to welding. See NYCHA
Contract Drawings 3-852, 3-853 and 3-855.
2.
Anything less than a replacement of the entire seam may, at the discretion of the
Authority, be considered as a boiler welding repair and shall be paid for accordingly.
This replacement shall apply only to one-piece HRT Boilers. Should replacement of
less than the entire seam cost more on the basis of the Unit Price for boiler welding
repair, then the compensation payable shall be the cost of the lower priced
Front Fire Box Seam Replacement.
F. Handhole Covers and Plate Replacement
1. At each defective handhole area, the Contractor shall cut away, by the flame cutting
process, all defective material around the opening. The defective corroded area at each
Specifications for Boiler Welding and Repairs Page 5
Confidential NYB001226
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
opening shall determine the extent of the area to be replaced, but in no event shall an
area of less than 8 x8 or 64 square inches be replaced at each opening. An area of
one (1) square foot of plate shall be anticipated in this bid. All plate area to, and
including one (1) square foot at each handhole shall be replaced with plate which as a
minimum be equal in thickness
paid for in accordance with the Unit Price for Water Leg Plate.
2. The Handhole Ring Replacement or Lap Joint Repair shall be per NYCHA Contract
Drawing 3-856, as required by this standard and shall be ground smooth in the newly
inserted plates. The new cover shall be cast iron and shall be furnished with an integral
threaded, watertight stud, compete with extra heavy dog and dense fiberglass rope
gasket.
G. Manhole Covers and Ring Replacement
1. The Contractor shall remove the defective manhole ring along with any defective shell
plate surrounding the ring. This material shall be removed by flame cutting process.
The new manhole ring assembly shall be per NYCHA Contract Drawing 3-857.
2. The new covers shall be forged steel, and similar and approved equal to those
manufactured by Lukens Steel. The covers shall be anchored by two (2) dogs with
bolts and semi-finished nuts. The bolts shall be affixed to the plate with slotted plates
welded to the covers. The covers shall be fitted with dense fiberglass rope gaskets. Hot
water generating tank covers shall be fitted with ¼ thick red rubber gaskets. Each
cover shall be either 11 x 15 , or 10 x 16 as applicable.
H. Hot Water Generating Tank Neckpiece Replacement
1. The Contractor shall be responsible for all rigging and removal and replacement of
stanchions, rails, and other encumbrances necessary to remove the tube bundle from
the tank.
2. The tube bundle shall be removed from the tank without damage thereto, and the
defective neckpiece shall be completely removed from the tank by the flame cutting
process.
3. The new neckpiece shall be similar in design, materials and construction, and equal in
size to the one removed. It shall be welded into place per NYCHA Contract Drawing
3-858. New high pressure fiber and composition gaskets shall be provided and
installed between the tube sheet and steam chamber, and between the tube sheet and
nozzle flange. New carbon steel bolts shall be provided and installed through the
steam chamber flange, tube sheet and nozzle flange.
4. Upon completion, the Contractor shall carefully replace the tube bundle and leave all
tank equipment tight, as approved by the Authority. All equipment and encumbrances
removed by the Contractor shall be restored in their original condition.
Specifications for Boiler Welding and Repairs Page 6
Confidential NYB001227
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
I. Hot Water Generating Tank Tube Supports and Straps Replacement
1. The Contractor shall remove the existing tube coil supports in the hot water generating
tank and remove all tank lining in the area of the support ends. The Contractor shall
install a new tube bundle support with a restraining strap. The tube support shall be
1½ x 1½
interior tank wall and located at such a height as to support the tube bundle in a level
position. Brazing of channel to tank at each end shall be 1½ continuous at top and full
arc of contact at sides. The restraining strap shall be 1/16 x1 soft copper bolted to
the bronze channel with ¼ bronze bolts.
2. If the separator is in good condition, the restraining strap shall be so installed as to
hold the separator perpendicular to the axis of the bundle and to prevent binding of the
tubes in the separator. The separator shall be restrained at the center of the strap. After
installation, the strap shall be bent over the separator on each side of the separator. The
bending shall be done by hammering or other approved means.
3. If the separator is deteriorated, it shall be removed. When the separator is removed or
missing, the restraining strap shall surround the entire tube bundle to prevent
deformation of the tube bundle.
4. After the forgoing has been done, the area surrounding tube supports shall be relined
with a ¾ layer of low soluble cement. The cement shall be of a type that permanently
resists the action of corrosive water. Cement shall be premixed cement, similar or
approved equal to that manufactured by Patterson-
directed to Sections P107.23 and P107.11 of the Building Code of the City of New
York, which prohibits use of materials that will produce toxic conditions or add taste
or odor to a potable water system.
5. No cement shall be applied until surface preparation and cleaning has been inspected
by the Authority.
6. In the application of new lining, there shall be no interference in any manner with
pipes, openings, valves or any other accessories attached to the tanks.
J. Hot Water Generating Tanks Deflector (Cold Water Inlet Baffle) Replacement
1. The Contractor shall remove the existing deflector from the tank and install a new one.
The deflector shall be made of commercial bronze, 0.128 thick (No. 8 B&S Gauge)
minimum, and shall be brazed to the tank shell at the original cold water inlet baffle
location. Brazing to tank shall be 21 continuous.
2. Cement lining shall be removed as necessary for the installation of the deflector. The
area from which lining has been removed shall be relined with new material as
specified in Section IV-I.
V- MISCELLANEOUS
A. Except for repairs performed as extra work, all insulation that must be removed to make
repairs shall be replaced with new material. Any required new insulation shall be asbestos
Specifications for Boiler Welding and Repairs Page 7
Confidential NYB001228
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
free of similar type to that removed and furnished to match adjacent surfaces. All removal
of refractory, brickwork and its insulation for access to boiler mud rings shall be done by
the Contractor at no cost to the Authority, but the replacement shall be done by the
Authority.
B. When preparing to weld metal into place on the boilers, joint preparation shall be in
accordance with ASME Code, Section IV, for Low Pressure Heating Boiler, or the
National Board Inspection Code. All welding shall be electric process with slag removed
between passes and performed by qualified ASME welders, as required by the ASME
Code. All welding shall be done in a workmanlike manner.
C. All steel plate used for patching and insertions for handhole plates and manhole rings shall
be SA 285, Grade C, or equal Boiler Plate as specified in Section II of the ASME Code.
Submittal of Material Test Reports to the Authority is required for acceptance.
D. Full penetration butt weld joints are preferred. Lap joint welds will be allowed where
acceptable by ASME Code or Authority Standards.
E. All work on hot water generating tanks must be commenced before 10:00 A.M. and
completed by working continuously. No overtime will be paid by the Authority. This work
shall include the reconnecting of any water, steam or condensate return lines which had to
be removed to accomplish the required repair. Replacement of rails, stanchion and other
structural members may be completed the next working day. Where the Authority
specifically directs that neckpiece replacement be commenced later than 10:00 A.M., all
work which runs into overtime shall be compensated at the overtime rate. It shall be the
sket.
F. All work on each boiler must run continuously through normal working hours until work is
completed. In the event that boiler repairs must be made during holiday, over weekends, or
at night, work shall be performed continuously until the repair is completed.
G. The Contractor shall be responsible for all work necessary to afford him access to the tube
sheets, with the exception of opening and closing of smoke box doors.
H. Contractor Personnel shall log in at the boiler room each day they report to the
Development for any work. Where access to the boiler room is impractical, they shall sign
in at the office.
I. The Contractor shall provide all necessary scaffolding and all safety equipment.
J. All work under this Contract shall be in accordance with the latest rules and regulations of
all Federal, State or City Agencies having jurisdiction.
K. All work and extra work shall be in accordance with the Contract Drawings. Refer to list of
the Contract Drawings which are attached to these specifications.
VI - TIME FOR COMMENCEMENT AND COMPLETION
Work shall commence on each order within two (2) business days, calculated from the date of
each order, unless specifically ordered otherwise by the Authority. Authorization for work, other
Specifications for Boiler Welding and Repairs Page 8
Confidential NYB001229
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
than during normal working hours shall come only from either the Technical Services
Department or the Emergency Services Department. Work schedules shall be arranged for work
other than that performed during normal working hours, at the time of authorization.
Work performed during normal working hours shall be completed as follows:
A. General Boiler Welding Repair
All repairs in one (1) boiler shall be completed within two (2) normal working days. If
work is required on more than one (1) boiler, one (1) additional day shall be allowed per
boiler on which repairs were authorized.
B. Replacement of Boiler Tubes
Tube replacement work shall proceed at a rate of ten (10) tubes per normal working day.
C. Replacement of Staybolts
Staybolt replacement work shall proceed at a rate of sixteen (16) staybolts per normal
working day. In replacing staybolts, Contractor is restricted to cut, remove and replace no
more than 8 staybolts on any one side of one boiler at one time.
D. Boiler Shell, Water Leg and Mud Ring Plate Replacement
All replacement of boiler shell, water leg and mud ring plates shall be completed within
three (3) consecutive normal working days on each boiler where repairs are authorized,
except replacement of shell plate over front water legs on two piece boilers. This
replacement shall be completed in seven (7) normal working days on each boiler where
such repair work is authorized.
E. Front Firebox Seam Replacement
Each front firebox seam replacement shall be completed within (2) normal working days.
F. Handhole Front Cover and Plate Replacement
Handhole cover and plate replacement work shall proceed at a rate of two (2) handholes per
normal working day.
G. Manhole Cover and Ring Replacement
Each manhole cover and ring shall be replaced at a rate of one (1) per day.
H. Hot Water Generating Tank Neckpiece Replacement
1. Each hot water generating tank neckpiece shall be replaced the next working day
is given before noon. In the event that notice is given after noon the Contractor shall
commence at the customary starting time in the morning and be completed the same
Specifications for Boiler Welding and Repairs Page 9
Confidential NYB001230
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
day. If more than one neckpiece is required to be replaced in a Development, one (1)
additional work day shall be allowed for each neckpiece to be replaced.
2. In the event that a neckpiece must be replaced over the weekend or on a Legal or Union
Holiday or during time which overtime must be paid, the Contractor shall replace same
work was commenced before noon of Friday, or a day preceding a Legal or Union
Holiday, no extra compensation for overtime shall be paid to the Contractor.
I. Hot Water Generating Tank Tube Support and Strap Replacement
Tube support and strap replacement, and also deflector replacement to be performed in the
same tank, shall be completed on the day it is started. Aforementioned work on tube
supports, etc., shall be performed at the rate of two tanks per day.
J. Replacement of Deflector (Cold Water Inlet Baffle)
Contractor is referred to Section VI above for time completion of each task.
NOTE
Replacement of insulation may be deferred until after all work described in Section IV is
completed in the Project. All insulation work required to be replaced as indicated in Section IV
(A) shall be replaced within one (1) week calculated from the date of completion of the
replacement work.
VII - CODES
A. All welding done under this Contract shall be by a method approved by the Authority,
before welding is started. It shall conform as to workmanship, testing, qualifications for
welding procedures and welders, and general requirements of the regulations of the
Building Code Section of the New York City Administrative Code, and ASME Section IX
and New York State Industrial Code Rule 4, as applicable. All welding shall be done to a
Weld Procedure Specifications (WPS) pre-qualified by the Contractor to ASME Section IX
of the Boiler and Pressure Vessel Code.
Qualification Records shall be in the possession of the Contractor at the time of bid. They
shall be delivered to the Authority within three days of the Authority request for the same.
B. Repairs to boilers and pressure vessels must be performed by a Firm in possession of a
valid Certificate of Authorizati
National Board of Boiler and Pressure Vessel Inspectors. Such repairs may also be made
by an organization in possession of valid ASME Certificate of Authorization, and
appropriate ASME Code Symbol Stamps. The aforesaid certificates shall be in the
possession of the Contractor at the time of bid. They shall be delivered to the Authority
C. For each work authorization, the Contractor will be required to complete a portion of the
Specifications for Boiler Welding and Repairs Page 10
Confidential NYB001231
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
il the Authority receives the form
with the aforementioned entries by the contractor. A copy of the form is enclosed.
VIII - WORK NOT INCLUDED
A. Except as indicated in Section IV (A), the Contractor shall not be responsible for any
refractory or brick work on any boiler. The Contractor shall not be responsible for the
draining or refilling of any boiler or hot water generating tank.
B. Conducting and evaluating hydrostatic boiler tests shall be performed by the Development
Staff, but tightness of work and guarantees are the responsibility of the Contractor.
C. No alterations to boilers or pressure vessels shall be performed. An alteration is defined as
the pressure containing capability of the boiler or pressure vessel.
IX- DEBRIS REMOVAL
A. The Contractor shall remove from the Authority premises and legally dispose of all debris,
refuse, dirt, removed neckpieces, removed boiler plate, removed handhole and manhole
covers, removed insulation, etc., and upon completion of his work shall leave the work area
in a broom clean condition. If the boiler work requires more than one day, the work area
room shall be conducted so as to permit normal boiler operation.
B. All work disturbed or damaged during the process of any repair done under the terms of the
Contract shall be restored in all respects to a condition equal to the original without
additional cost to the Authority.
X- CORRECTION OF DEFECTIVE WORK
In the event any repair work performed by this Contractor is found to be defective within one (1)
year of completion, the repair shall be redone without additional cost to the Authority, within the
same period of time after notice of defect, as was allotted for the original repair.
XI - PAYMENT PROCEDURE
Upon completion of all authorized work, the Contractor shall submit an invoice in
duplicate to the Heating Services and Operations Department located at 23-02 49th Avenue
3rd Fl., Long Island City, NY 11101.
The Contractor is also required to submit a comprehensive payment package directly to
By Hand Delivery, UPS, Fed Ex, Etc.:
New York City Housing Authority
90 Church St 6th Floor
New York, NY 10007
Attention: Accounts Payable Division
Specifications for Boiler Welding and Repairs Page 11
Confidential NYB001232
FILED: NEW YORK COUNTY CLERK 06/29/2020 06:30 PM INDEX NO. 160513/2018
NYSCEF DOC. NO. 57 RECEIVED NYSCEF: 06/29/2020
By Mail:
New York City Housing Authority
P.O. Box 3636
Church Street Station
New York, NY 10007
Attention: Accounts Payable Division
Completed Payment Package shall contain two original invoices, that includes;
A detailed description of the billed goods or services.
A correct NYCHA contract number
A correct release number if applicable
The correct quantities and prices for the billed goods or services (which much not exceed
the quantities authorized by NYCHA on the release or the prices in the contract).
Contractor Sign-in Sheets
NYCHA Work Authorization when applicable
Proof of Insurance for the duration of the contract term
Department of Labor certified Payrolls double-sided with original signatures
Resident Hiring Summary (when applicable)
Invoices without correct PO/Contract numbers and/or release numbers will be returned unpaid with a
cover letter indicating items that need correction
ny such invoices within thirty (30) days shall not co