Your recipients will receive an email with this envelope shortly and will be able to access it on trellis. You can always see your envelopes by clicking the Inbox on the top right hand corner.
Your subscription has successfully been upgraded.
(a) A contractor must submit for review an application and plans for the installation of new equipment. (b) To apply for a plan review for the installation of new equipment, a contractor must: (1) submit a completed application on a department-approved form; (2) pay the fee required by §74.80; and (3) submit layout drawings as specified in the ASME Code A17.1 adopted in §74.100 for the specific type of equipment to be installed. These layout drawings shall also include: (A) the rated speed of the equipment in feet per minute; (B) the rated capacity of the equipment in pounds; (C) the total travel of the equipment in feet and inches; (D) elevation drawings of the hoistway, runway or wellway; and (E) plan drawings indicating the arrangement of the equipment in a machine room, machine space, control room or control space.
For full print and download access, please subscribe at https://www.trellis.law/.
Please wait a moment while we load this page.