Your recipients will receive an email with this envelope shortly and will be able to access it on trellis. You can always see your envelopes by clicking the Inbox on the top right hand corner.
Your subscription has successfully been upgraded.
(a) The inspection of the installation of an ignition-resistant construction system on a manufactured home within a manufacturing facility shall be in accordance with the provisions of this subsection.(1) The manufacturer of the manufactured home shall obtain inspection approval in accordance with this article and federal regulations contained in Title 24 CFR Part 3282, Subpart E, titled "Manufacturer Inspection and Certification Requirements", by its federally approved Primary Inspection Agency.(2) The manufacturer of the manufactured home shall certify that the ignition-resistant construction system is installed in accordance with the plans approved by the Department-approved Design Approval Agency and document its certification in accordance with Title 25, CCR section4214.(b) The following requirements apply to the inspection of any ignition-resistant construction system constructed during the manufacture of a multifamily manufactured home or commercial modular structure:(1) The manufacturer shall have a Quality Assurance Agency conduct the inspections of the ignition-resistant construction system in accordance with the Design Approval Agency approved plans and this subchapter.(2) The manufacturer shall certify that the ignition-resistant construction system is installed in accordance with the plans approved by the Design Approval Agency and document its certification in accordance with section 4214.(c) Following the certification of the ignition-resistant construction system, a copy of the completed certification label shall be provided to the enforcement agency when the manufacturer, licensed dealer, contractor, or owner-builder submits the application for the installation permit, to assist the local building official or appropriate enforcement agency to satisfy the requirements of Sections 701A.4.1 and 701A.4.2 of Title 24, CCR Part 2, Chapter 7A.(d) All manufacturers shall provide to the department, by the fifteenth day of each month, one copy of each completed certification label required by section 4214 of this subchapter that was affixed to the structure(s) constructed with an ignition-resistant construction system in the previous month.Notes
Cal. Code Regs. Tit. 25 , § 4210Note: Authority cited: Sections 18015, 18020, 18029 and 18029.5, Health and Safety Code. Reference: Sections 18015, 18020, 18025, 18029, 18029.5 and 18030.5, Health and Safety Code.
1. New section filed 8-29-2008 as an emergency; operative 8-29-2008 (Register 2008, No. 35). A Certificate of Compliance must be transmitted to OAL by 2-25-2008 or emergency language will be repealed by operation of law on the following day.
2. New section refiled 2-11-2009 as an emergency; operative 2-25-2009 pursuant to Government Code section 11346.1(d) (Register 2009, No. 7). A Certificate of Compliance must be transmitted to OAL by 5-26-2009 or emergency language will be repealed by operation of law on the following day.
3. New section refiled 5-22-2009 as an emergency; operative 5-26-2009 (Register 2009, No. 21). A Certificate of Compliance must be transmitted to OAL by 8-24-2009 or emergency language will be repealed by operation of law on the following day.
4. Editorial correction of History3 (Register 2009, No. 22).
5. Certificate of Compliance as to 5-22-2009 order, including amendment of section, transmitted to OAL 7-9-2009 and filed 8-19-2009 (Register 2009, No. 34).
6. Change without regulatory effect amending subsection (c) filed 1-28-2011 pursuant to section 100, title 1, California Code of Regulations (Register 2011, No. 4).
Petitioners assert that they are not required to allege such specific instances because doing so would be futile due to the nature of the DES and the requirement of 11 CCR section 4210(b)(2)(6), which prohibits the input of inaccurate information into the DES. Opp. at 13. Respondents only weakly respond that there is no futility exception to the requirement of standing. Reply at 4.
FRANKLIN ARMORY, INC., ET AL. VS CALIFORNIA DEPARTMENT OF JUSTICE, ET AL.
20STCP01747
Jun 03, 2021
Los Angeles County, CA
Administrative
Writ
LIBERTY MUTUAL INSURANCE COMPANY In The Superior County of Los Angeles FILED State of contig rior Court of Califomia …
Apr 26, 2018
Request for Dismissal - Before Trial not following ADR or more than 60 days since ADR 06/18/2019
Los Angeles County, CA
Apr 27, 2018
Contractual Fraud (General Jurisdiction)
(Page 1 of 1) -.@ — e LIBERTY MUTUAL INSURANCE COMPANY In The Superior Court …
Jul 09, 2018
Court-Ordered Dismissal - Before Trial - Lack of Prosecution 02/21/2019
Los Angeles County, CA
Aug 13, 2018
Contractual Fraud (General Jurisdiction)
[ATTORNEY OR PARTY WITHOUT ATTORNEY STATE BAR NUMBER: 305398 INaME: Ashley A. Byers. FIRM NAME: Fuerza Immigration Lawyers, LLP ISTREET ADDRESS: P.O. Box 31357 city: Oakland sTATE: CA ZIPCODE: 94604 TELEPHONE NO.; 510-834-1288 FAXNO: 510-834-0431 E-MAIL ADDRESS: ashley@fuerzalawyers.com ATTORNEY FOR (name): Rosa lliana Macias Parra SUPERIOR COURT OF CALIFORNIA, COUNTY OF CONTRA COSTA ‘STREET ADDRESS: 725 Court Street MAILING ADDRESS: crTy AND zip Cope: Martinez, CA 94553 BRANCH NAME: Wa…
Oct 25, 2022
Judgment
Contra Costa County, CA
Oct 25, 2022
Name Change
Filed Superior Court of Caliigrnia.. ATTORNEY OR PARTY WITHOUT ATTORNEY (Name, State Bar number, and address): SATA ar USE ONLY Dou…
Sacramento County, CA
Jul 19, 2023
Limited Civil
SUPERIOR COURT OF CALIFORNIA * COUNTY OF FRESNO Entered by: Civil Department - Non-Limited TITLE OF CASE: Julio Palomino vs S. Brazier Case Number: LAW AND MOTION MINUTE ORDER 14CECG00…
Jan 23, 2014
Judgment
For full print and download access, please subscribe at https://www.trellis.law/.
Please wait a moment while we load this page.