Motion for Extension of Time - TO RESPOND TO PLAINTIFF'S COMPLAINTParty: Defendant PMG Driftwood LLC Defendant Glenewinkel Construction Company LLC

On October 22, 2020 a neg - construction defect case was filed by Fine Line Electric Inc, Pmg Driftwood Llc, and Sage Beach Condominium Association, Inc., represented by Small, Evan J, Esq., against Advanced Alarm Service, Inc, Armstrong Air Condition & Heating Of Central Florida Inc, Associated Steel And Aluminium Inc et al. represented by Alempour, Sanaz, Alonso, Gabriel Antonio, Barthet, Alexander E et al. in the jurisdiction of Broward County. Judge Tuter, Jack presiding.

                        
Preview
Filing # 117045598 E-Filed 11/20/2020 01:48:10 PM IN THE CIRCUIT COURT OF THE 177! JUDICIAL CIRCUIT IN AND FOR BROWARD COUNTY, FLORIDA SAGE BEACH CONDOMINIUM CASE NO.: CACE 20017530 ASSOCIATION, INC., A Florida not-for-profit corporation; Plaintiff, vs. PMG DRIFTWOOD, LLC, a Florida Limited Liability Company; GLENEWINKEL CONSTRUCTION COMPANY, LLC, a Florida limited liability company; URVANX, INC., a Florida corporation, SHAMROCK ENGINEERING, CORP., a Florida corporation; CALVIN GIORDANO & ASSOCIATES, INC., a Florida Corporation; and CHM STRUCTURAL ENGINEERS, LLC, A Florida limited liability company, Defendants. / DEFENDANTS, PMG DRIFTWOOD, LLC’S AND GLENEWINKEL CONSTRUCTION COMPANY, LLC’S MOTION FOR EXTENSION OF TIME TO RESPOND TO PLAINTIFF’S COMPLAINT COMES NOW, Defendants, PMG Driftwood, LLC and GLENEWINKEL CONSTRUCTION COMPANY, LLC, by and through the undersigned counsel, pursuant to Fla. R. Civ. R. 1.090(b), hereby files this Motion for Extension of Time to Respond …

Please wait a moment while we load this page.

New Envelope